ML22027A580
| ML22027A580 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 01/27/2022 |
| From: | Donnelly P Westinghouse |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML22027A579 | List: |
| References | |
| LTR-RAC-22-05 | |
| Download: ML22027A580 (1) | |
Text
Westinghouse Non-Proprietary Class 3 8 Westinghouse Page 1 of3 Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Directtel: 803-647-1957 Document Control Desk e-mail: donnelpb@westinghouse.com 115 5 5 Rockville Pike Your ref:
Rockville, Maryland 20852-2738 Our ref: LTR-RAC-22-05 r-----'---=----------------------,
Security Related Information Notice to this letter contains security related information which is to be withheld from public disclosure in accordance with RIS 2005-31. The balance o this letter m be considered blic u on removal o Enclosure 1 January 27, 2022
SUBJECT:
WESTINGHOUSE JANUARY 2022 UPDATED INTEGRATED SAFETY ANALYSIS (ISA)
SUMMARY
Westinghouse Electric Company LLC (Westinghouse) hereby submits the updated Integrated Safety Analysis (ISA) Summary for the Columbia Fuel Fabrication Facility (CFFF) in accordance with 10CFR70.72(d)(3). This submittal incorporates facility changes and the results of new or revised analyses completed within calendar year 2021 which impacted the ISA Summary. The ISA changes implemented in 2021 did not require Nuclear Regulatory Commission (NRC) pre-approval under the provisions of 10CFR70.72(c).
Table 1 on pages 2 and 3 of this letter provides a listing of the impacted sections of the ISA Summary and a general description of the revisions. Changes in the enclosed ISA summary are identified by revision lines in the left margin.
If you have any questions, please contact me at (803) 647-1957.
rl Patrick Donnelly Acting Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM -1107 : January 2022 Updated ISA Summary Cc:
Ms. Jennifer Tobin Mr. Thomas Vukovinsky Mr. Nicholas Peterka
© 2022 Westinghouse Electric Company LLC All Rights Reserved