Letter Sequence Request |
---|
EPID:L-2020-LLR-0027, ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval (Approved, Closed) |
|
MONTHYEARML20049A0882020-02-17017 February 2020 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval Project stage: Request ML20079M6752020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0027 to LLR-0032) Project stage: Acceptance Review ML20209A5362020-07-27027 July 2020 Response to Request for Additional Information Regarding Relief Request IR-3-33 for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval Project stage: Response to RAI ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) Project stage: Approval ML21102A2602021-04-12012 April 2021 One-Time Interval Extension for Supplemental Position Indication Testing Project stage: Request ML21109A2092021-04-19019 April 2021 R. E. Ginna Nuclear Power Plant, Additional Information - One-Time Interval Extension for Supplemental Position Indication Testing Project stage: Supplement ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval Project stage: Approval 2020-07-27
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.55a April 12, 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License Nos. DPR-18 NRC Docket No. 50-244
Subject:
One-Time Interval Extension for Supplemental Position Indication Testing In accordance with 10 CFR 50.55a, Codes and standards, paragraph (z)(2), Exelon Generation Company, LLC (Exelon), requests NRC approval of a proposed relief request associated with the Inservice Testing (IST) Program for the R. E. Ginna Nuclear Power Plant.
This request proposes a one-time extension to the 2-year Supplemental Position Indication (SPI) testing frequency for fifteen IST program valves.
The timing for implementation was not clear; therefore, several position verification tests were performed that were not supplemented with alternate indication to demonstrate obturator position. Compliance with the requirements of ISTC-3700 will create undue hardship without a compensating increase in the level of quality or safety. The earliest surveillance testing of these valves is due to expire on April 28, 2021; therefore, Exelon requests your review and verbal approval of this request by April 27, 2021.
There are no regulatory commitments contained in this letter.
If you have any questions, please contact Tom Loomis at 610-765-5510.
Respectfully, David T. Gudger Senior Manager - Licensing and Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Relief Request GR One-Time Interval Extension for SPI Testing cc: Regional Administrator - NRC Region I NRC Senior Resident Inspector - Ginna NRC Project Manager - Ginna
ATTACHMENT Relief Request GR One-Time Interval Extension for Supplemental Position Indication Testing
10 CFR 50.55a Relief Request: GR-03 Revision 0 (Page 1 of 3)
Request for Relief GR-03 One-Time Interval Extension for Supplemental Position Indication Testing In Accordance with 10 CFR 50.55a(z)(2)
- 1. ASME Code Component(s) Affected:
Pneumatically operated and motor operated valves with remote position indications were not verified in the open and/or closed position using a supplemental indication during the Ginna Nuclear Power Plant refueling outage conducted in April 2020. This includes the following valves:
Test Valve Code Description Category Type Expiration ID Class Excess Letdown Loop A Cold to Heat 310 1 B AOV 5/2/2021 Exchanger Valve Letdown Isolation Valve Residual Heat 371 Removal to Non-Regenerative Heat 2 A AOV 5/2/2021 Exchanger Reactor Coolant Pump A and B Seal 386 2 B AOV 5/2/2021 Bypass Valve Instrument Air to Containment Isolation 5392 2 A AOV 5/2/2021 Valve 835A Safety Injection Accumulator A Fill Valve 2 B AOV 5/2/2021 835B Safety Injection Accumulator B Fill Valve 2 B AOV 5/2/2021 Safety Injection Accumulator A Test 839A 2 B AOV 5/2/2021 Valve Safety Injection Accumulator B Test 840A 2 B AOV 5/2/2021 Valve Safety Injection Accumulator A Drain 844A 2 B AOV 5/2/2021 Valve Safety Injection Accumulator B Drain 844B 2 B AOV 5/2/2021 Valve Upper Containment Spray Charcoal 875A 2 B MOV 5/6/2021 Filter Dousing Valve Upper Containment Spray Charcoal 875B 2 B MOV 5/6/2021 Filter Dousing Valve Lower Containment Spray Charcoal 876A 2 B MOV 5/6/2021 Filter Dousing Valve Lower Containment Spray Charcoal 876B 2 B MOV 5/6/2021 Filter Dousing Valve Pressurizer Steam Space Sample 966A 2 A AOV 4/28/2021 Containment Isolation Valve
10 CFR 50.55a Relief Request: GR-03 Revision 0 (Page 2 of 3)
- 2. Applicable ASME OM Code Edition:
American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), 2012 Edition with no Addenda.
3. Applicable Code Requirements
ISTC-3700 , Position Verification Testing, states: "Valves with remote position indicators shall be observed locally at least once every 2 years to verify that valve operation is accurately indicated. Where practicable, this local observation should be supplemented by other indications such as use of flow meters or other suitable instrumentation to verify obturator position. These observations need not be concurrent. Where local observation is not possible, other indications shall be used for verification of valve operation.
10 CFR 50.55a(b)(3)(xi) OM condition: Valve Position Indication states: When implementing paragraph ISTC-3700, "Position Verification Testing," in the ASME OM Code, 2012 Edition through the latest edition and addenda of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section, licensees shall verify that valve operation is accurately indicated by supplementing valve position indicating lights with other indications, such as flow meters or other suitable instrumentation to provide assurance of proper obturator position for valves with remote position indication within the scope of Subsection ISTC including its mandatory appendices and their verification methods and frequencies.
As required by 10 CFR 50.55a(b)(3)(xi), ISTC-3700 requirements became applicable on January 1, 2020 when the R. E. Ginna Nuclear Power Plant (Ginna) Inservice Testing (IST)
Program was updated to the 2012 Edition of the ASME OM Code.
4. Reason for Request
Pursuant to 10 CFR 50.55a, Codes and standards, paragraph (z)(2), compliance with the requirements of ISTC-3700 will create undue hardship without a compensating increase in the level of quality or safety. Compliance will require a plant shutdown to perform a SPI for the valves listed in Section 2.
The most-limiting Supplemental Position Indication (SPI) testing interval for these valves ends on April 28, 2021, based on the 2-year interval that came into effect on January 1, 2020 and considering the use of the 6-month interval extension allowed by ASME OM Code Case OMN-20, Inservice Test Frequency. The position verification with SPI requires the valves to be exercised in the open and closed direction and the valves position verified by other indications such as use of flow meters or other suitable instrumentation to verify obturator position. The timing for implementation was not clear; therefore, several position verification tests were performed that were not supplemented with alternate indication to demonstrate obturator position.
This relief request proposes a one-time interval extension of eight months (December 28, 2021) which will allow testing during the next refueling outage which is scheduled to begin October 4, 2021. This extension will avoid a forced plant shutdown to achieve refueling conditions to permit safely stroking the identified valves.
10 CFR 50.55a Relief Request: GR-03 Revision 0 (Page 3 of 3)
5. Proposed Alternative and Basis for Use
As a proposed alternative to the 2-year SPI testing frequency required by ISTC-3700, this relief request proposes a one-time interval extension of eight months (December 28, 2021) which will allow testing during the next refueling outage which is scheduled to begin October 4, 2021. The listing of valves provided in Section 2 have satisfactorily passed their IST examinations for the past 10 years.
Any component degradation identified prior to the next outage will be evaluated per the Corrective Action Program for operability concerns and compliance with the IST Program and Technical Specifications.
The identified valves have demonstrated exceptional performance and reliability. The subject valves have no history of stem-disc separation. This was confirmed by an internal maintenance history search and by an INPO Industry Reporting Information System (IRIS) search for each valve make and model and review of EPRI Technical Report 3002019621 (Reference 1). The historical performance provides assurance of the valves capabilities to perform their design function(s) within the eight-month SPI interval extension. The past and current performance of each identified valve and the one-time interval extension bounded by test frequencies in existing regulations provide an acceptable level of quality and safety.
6. Duration of Proposed Alternative
The proposed alternative is a one-time interval extension of eight months for the Ginna SPI testing of the identified valves, with an end date of December 28, 2021.
- 7. Precedent:
None
- 8.
References:
- 1. EPRI Technical Report 3002019621, Susceptibility of Valve Applications to Failure of the Stem-to-Disk Connection