ML20058H061
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20058H061 | |
Person / Time | |
---|---|
Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
Issue date: | 10/31/1990 |
From: | Claffey S, Stanford J, Stetz J CONNECTICUT YANKEE ATOMIC POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9011140220 | |
Download: ML20058H061 (31) | |
Similar Documents at Haddam Neck | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211G1341999-08-24024 August 1999
[Table view]Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20155F9851998-10-30030 October 1998 Proposed Tech Specs Re Editorial Changes & Typographical Corrections ML20155G0061998-10-30030 October 1998 Proposed Tech Specs Correcting Amend Number on Pages Not Changed by Amend 193 ML20155G3561998-10-30030 October 1998 Proposed Tech Specs Updating Pages for Amend 194 Re Seismic Monitors ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20237C4561998-08-13013 August 1998 Proposed Tech Specs Reflecting Limitations & Requirements Appropriate to Present Configuration of Plant ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20248L3291998-06-0202 June 1998 Proposed Tech Specs Incorporating Proposed Changes Re Seismic Monitoring Into HNP TS ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20247E9991998-05-0707 May 1998 Proposed Tech Specs,Reflecting Permanently Defueled Condition of HNP ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20212A6681997-09-29029 September 1997 Final Rept Unrestricted Release Confirmatory Survey Program ML20206D1071997-06-30030 June 1997 Rev 10 to ODCM for Hnp ML20206D1031997-05-31031 May 1997 Rev 10 to Radioactive Effluent Monitoring Manual ML20148G9191997-05-30030 May 1997 Rev 0 to Cyap Haddam Neck Plant Radiation Protection Improvement Plan ML20140E1261997-05-30030 May 1997 Proposed Tech Specs Re Certified Fuel Handler ML20140D5471997-05-30030 May 1997 Proposed Ts,Reflecting Limitations & Requirements Appropriate to Present Configuration of Plant ML20140E1571997-05-21021 May 1997 Rev 1 to NTM-7.084, Cyap Certified Fuel Handler Recertification Training Program Implementing Procedure ML20140E1391997-05-21021 May 1997 Rev 1 to NTM-7.083, Cyap Certified Fuel Handler Initial Certification Training Program Implementing Procedure ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20216B3071997-02-28028 February 1997 Rev 8 to ODCM for Haddam Neck Plant ML20249B7761997-02-19019 February 1997 Rev 4 to Hwm 15.1-7, Spill Prevention Control & Countermeasure Plan ML20134J6511997-01-31031 January 1997 Proposed Tech Specs Section 6, Administrative Controls ML20134L2551997-01-16016 January 1997 Rev 0 to Integrated Plan for Improvement of Mgt Stds at Connecticut Yankee Nuclear Power Station ML20134L2701997-01-0303 January 1997 Rev 0 to Design Control Process ML20134L2511996-12-31031 December 1996 Rev 0 to Integrated Plan for Improving CA Program at Connecticut Yankee ML20138G6871996-12-24024 December 1996 Proposed Tech Specs Incorporating Changes to Revise Section 6, Administrative Controls & Reflect New Organizational Responsibilities & Titles ML20059L0701994-01-25025 January 1994 Proposed Tech Spec 3.7.1.1.2,Action C Re Atmospheric Steam Dump Capability B14619, Proposed Tech Specs Increasing AOT for Charging Pump from 72 Hours to Seven Days1993-11-0202 November 1993 Proposed Tech Specs Increasing AOT for Charging Pump from 72 Hours to Seven Days B14627, Reactor Containment Bldg ILRT Rept. W/1993-09-30030 September 1993 Reactor Containment Bldg ILRT Rept. W/ ML20057A6241993-08-31031 August 1993 Core Xviii Startup Physics Test Rept B14542, Proposed Tech Specs Permanently Removing Ability for Plant to Operate W/Three Loops While in Modes 1 or 21993-08-31031 August 1993 Proposed Tech Specs Permanently Removing Ability for Plant to Operate W/Three Loops While in Modes 1 or 2 ML20056E6281993-08-18018 August 1993 Proposed Tech Specs Re Onsite Power Distribution ML20056D0521993-07-26026 July 1993 Proposed Tech Specs Modifying Action Statement a of TS Section 3.5.1 & Moving Surveillance Requirement 4.5.1.b from TS Section 3/4.5.1 to TS Section 3/4.5.2 as Surveillance Requirement 4.5.2.c ML20056C7471993-07-16016 July 1993 Proposed Tech Specs Changing Submittal Frequency of Radioactive Effluent Release Rept from Semiannual to Annual ML20056C0781993-03-16016 March 1993 Proposed Tech Specs Changes,Incorporating Editorial Cleanup ML20128E6811993-01-29029 January 1993 Proposed Tech Specs for RTS Instrumentation,Srs & Bases & ESFAS Instrumentation,Trip Setpoints,Srs & Bases ML20128E5501993-01-29029 January 1993 Proposed Tech Specs Re Steam Generator Repair Criteria ML20127E2901993-01-11011 January 1993 Rev 43 to Corporate Organization for Nuclear Incidents (Coni) Procedure Coni 1.02,page 7.2-2 of 2,Figure 7.2, Cero Staff-Managers Annual On-Call Schedule B14087, Proposed Tech Specs Re Steam Generator Repair Criteria1992-07-31031 July 1992 Proposed Tech Specs Re Steam Generator Repair Criteria ML20062H4371990-11-27027 November 1990 Proposed Tech Specs,Adding locked-closed Manual Valve & Removing solenoid-operated Containment Isolation Valve ML20217A6311990-11-14014 November 1990 Rev 0 to Haddam Neck Plant Reactor Containment Bldg Integrated Leak Rate Test ML20058H0611990-10-31031 October 1990 Core Xvi Startup Physics Test Rept ML20059F0011990-08-25025 August 1990 Proposed Tech Specs Re ESFAS Instrumentation B13597, Proposed Tech Spec Page 3/4 7-3 Re Auxiliary Feedwater Sys Operability1990-07-26026 July 1990 Proposed Tech Spec Page 3/4 7-3 Re Auxiliary Feedwater Sys Operability B13570, Proposed Tech Specs Revising Sections 3.4.6.2.f,4.4.6.2.1.g & 4.4.6.2.1.h Re RCS Leakage & Low Temp Overpressurization Protection Sys Bases1990-07-0505 July 1990 Proposed Tech Specs Revising Sections 3.4.6.2.f,4.4.6.2.1.g & 4.4.6.2.1.h Re RCS Leakage & Low Temp Overpressurization Protection Sys Bases 1999-08-24 Category:TEST REPORT MONTHYEARB14627, Reactor Containment Bldg ILRT Rept. W/1993-09-30030 September 1993
[Table view]Reactor Containment Bldg ILRT Rept. W/ ML20057A6241993-08-31031 August 1993 Core Xviii Startup Physics Test Rept ML20217A6311990-11-14014 November 1990 Rev 0 to Haddam Neck Plant Reactor Containment Bldg Integrated Leak Rate Test ML20058H0611990-10-31031 October 1990 Core Xvi Startup Physics Test Rept ML20153B7401988-05-31031 May 1988 Assessment of Reverse Direction Testing of Containment Isolation Valves B12934, Core Xv Startup Physics Test Rept1988-05-31031 May 1988 Core Xv Startup Physics Test Rept B12902, Assessment of Reverse Direction Testing of Containment Isolation Valves1988-05-31031 May 1988 Assessment of Reverse Direction Testing of Containment Isolation Valves ML20215E5061986-09-18018 September 1986 Connecticut Yankee Atomic Power Co Reactor Containment Bldg Integrated Leak Rate Test & Air Filtration Sys Test,Jan - Jul 1986 ML20149M8061986-07-31031 July 1986 Core Xiv Startup Physics Test Rept,Jul 1986 ML20210C5431986-06-26026 June 1986 Connecticut Yankee ECCS Full Flow Test, Performed on 860111 ML20054K0231982-03-31031 March 1982 Natural Circulation Test at CT Yankee Nuclear Power Plant 1993-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058H061&oldid=3566609"