Requests Technical Assistance in Reviewing Certificate Amend Request for Paducah Gaseous Diffusion Plant to Revise TS Requirement on Criticality Accident Alarm System for Product Withdrawal Facilities
ML20217F806
Person / Time
Site: 07007001
Issue date: 10/07/1997
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
TAC-L32047, NUDOCS 9710090058
Download: ML20217F806 (2)


Text

.

', gY'oig

, 7N f*. UNITED STATES

, j j

t NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. t0%HK101

\ .... /

October 7, 1997 MEMORANDUM TO: Pnillip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS FROM: Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety QQ { ,

and Safeguards, NMSS

SUBJECT:

TECHNICAL ASSISTANCE REQUEST REVIEW OF PADUCAH I

GASEOUS DIFFUSION PLANT CERTIFICATE AMENDMENT l REQUEST REVISION TO PRODUCT AND TAILS WITHDRAWAL FACILITIES CRITICALITY ACCIDENT ALARM SYSTEM The FCS3 Special Projects Branch requests technical assistance in reviewing the following project:

Rolent: Certificate Amendment Request for the Paducah Gaseous Diffusion Plant to revise the Technical Gafety Requirement (TSR) on the Criticality Accident Alarm System (CAAS) for the Product and Tails Withdrawal Facilities Calework/RITS/ TAC Nos: 70 7001320S/212AH/L32047 Renuested Action: The United States Enrichment Corporation (USEC) has requested a revision to TSR 2.3.4.7, Required Action A1.5. The TSR, upon CAAS Inoperability, allows completion of the withdrawal cycle for the current UF6 cylinder and then requires discontinuing withdrawal of UF6. It does not provide for filling the accumulators. USEC is requesting a change to allow other normal steady state operation upon loss of CAAS, such as filling the accumulators. We would like your staff to review the proposed changes, prepare questions to request additionalinformation (if necessary), and prepare input for a compliance evaluation report (similar to a safety evaluation report).

The SPB target date for completion of this amendment is January 15,1998. To meet this target ,

date, completion of your review in the form of input for a compliance evaluation report, by f January 5,1998, is requested. The estimated schedule allows for at least one request for (, i additionalinformation to be generated by the primary reviewer no later than December 1,1997,4 If needed, a meeting with USEC on this subject could also be arranged.

9710090050 971007 PDR ADOCK 07007001 C PDR llll lllll

w. ll l l m

e o ,

P. Ting,FCOB 2 A copy of USEC's request and the current Ti.R are attached. Merri Horn has already discussed this request with Jack Davis of your staff. However,if another revieweris assigned, please have him/her directly contact Ms. Horn to further discuss this request.

Contacts: Project Manager (PM): Merri Horn,415 8126 _

l Licensing Assistant (LA): Danielle Hoadley,415-8129 The above TAC No. should be referenced in future correspondence related to this request and on the RITS Report for recording staff time expended on this effort.

Docket 70 7001 Certificate GDP 1 Attachments:

1. Certificate Amendment Request dated September 15,1997
2. Current TSR 2.3.4.7 DISTRIBUTION: w/o encl.