MONTHYEARIR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5452021-05-0606 May 2021 04 Public Forms ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update ML18122A3722018-05-0101 May 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17124A2082017-05-0404 May 2017 Response to Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16321A4722016-11-0303 November 2016 10 Draft Written Exam Pedigree ML16321A4632016-11-0303 November 2016 Palo VERDE-2016-10 Final Written Exam ML16321A4682016-11-0303 November 2016 2016-10 Draft Outlines ML16321A4662016-11-0303 November 2016 Palo VERDE-2016-10 Post-Exam Comments ML16321A4652016-11-0303 November 2016 Palo VERDE-2016-10 Final Operating Test ML16321A4692016-11-0303 November 2016 2016-10-DRAFT Outline Comments Rev 2 with PVNGS Response ML16321A4832016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test ML16321A4862016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test Comments ML16321A4882016-11-0303 November 2016 Palo VERDE-2016-10 Final Outlines 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23151A6492023-05-11011 May 2023 11-PV-2023-05 Public Forms ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22196A3782022-07-15015 July 2022 Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301 ML22143A9892022-05-19019 May 2022 PV-2022-05-Post Exam Comments ML23193A8502022-04-12012 April 2022 PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist ML22178A1772022-04-12012 April 2022 PV-2022-05-Public Forms ML22070A1382022-03-10010 March 2022 Response to Regulatory Issue Summary (RIS) 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21160A0832021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 ML21147A5452021-05-0606 May 2021 04 Public Forms ML21147A5442021-05-0606 May 2021 04 Post Examination Analysis ML21106A3042021-04-16016 April 2021 Response to Regulatory Issue Summary (RIS) 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21020A1032020-12-10010 December 2020 11 Post Examination Analysis ML21020A1042020-12-10010 December 2020 11 Public Forms ML21020A0972020-12-10010 December 2020 11 Final Written Examination ML21020A0952020-12-10010 December 2020 11 Final Operating Test ML21020A0942020-12-10010 December 2020 11 Draft Written Examination ML21020A0932020-12-10010 December 2020 11 Draft Written Examination Comments ML21020A0912020-12-10010 December 2020 11 Draft Outline Comments ML21020A0982020-12-10010 December 2020 2020-11 Draft Operating Test Comments ML21020A0962020-12-10010 December 2020 11 Final Outlines ML21020A0922020-12-10010 December 2020 11 Draft Outlines ML21020A0902020-12-10010 December 2020 11 Draft Operating Test ML20325A3682020-11-20020 November 2020 NRC Initial Operator Licensing Examination Approval 05000528/2020301; 05000529/2020301; 05000530/2020301 ML20199M3832020-07-17017 July 2020 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20003E2762019-10-11011 October 2019 PV-2019-10 Post Exam Comments and Analysis ML19273C8072019-09-30030 September 2019 NRC Initial Operator Licensing Exam Approval Letter 05000528/529/530/2019301 ML19135A3352019-05-15015 May 2019 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20042C1192019-03-12012 March 2019 PV-2019-10 Public Forms ML18284A4942018-09-25025 September 2018 NRC Retake Initial Operator Licensing Examination Approval 05000528/2018302, 05000529/2018302 and 05000530/2018302 ML18184A3552018-06-29029 June 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update ML18122A3722018-05-0101 May 2018 Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17124A2082017-05-0404 May 2017 Response to Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML16321A4652016-11-0303 November 2016 Palo VERDE-2016-10 Final Operating Test ML16321A4632016-11-0303 November 2016 Palo VERDE-2016-10 Final Written Exam ML16321A4832016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test ML16321A4682016-11-0303 November 2016 2016-10 Draft Outlines ML16321A4722016-11-0303 November 2016 10 Draft Written Exam Pedigree ML16321A4792016-11-0303 November 2016 2016-10 Draft Written Exam Comments ML16321A4862016-11-0303 November 2016 Palo VERDE-2016-10 Draft Operating Test Comments ML16340B6372016-11-0303 November 2016 Palo VERDE-2016-10 Public Forms ML16321A4662016-11-0303 November 2016 Palo VERDE-2016-10 Post-Exam Comments ML16321A4692016-11-0303 November 2016 2016-10-DRAFT Outline Comments Rev 2 with PVNGS Response ML16321A4882016-11-0303 November 2016 Palo VERDE-2016-10 Final Outlines ML16293A1212016-10-18018 October 2016 2016-11-Examination Approval ML16203A1502016-07-15015 July 2016 Response to Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 2023-09-06
[Table view] |
Text
Palo Verde 2020-11 Draft Operating Test Comments NOTE: This summary is being provided in lieu of Form 301-7, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.
Generic Scenario Changes
- Added There are no personnel to Containment for all scenarios
- Added operator positions for all events Scenario 1:
- Driver Setup - Added note to place Protected Equipment placard over AFB-P01 and AFN-P01
- Crew Turnover - Added that AFB-P01 and AFN-P01 are protected
- Event 2 - Specify CS Header valve number o Added valve number
- Event 2 - Include Appendix C checklist o Included checklist
- Event 2 - Added LCO 3.7.11 if Essential Filtration fans are stopped
- Event 3 - Not a separate component failure o Removed event as a separate component failure. Adjusted 301-5 and 301-6
- Event 3 - Specify DNBR limit for TS 3.2.4 entry o Added the POL indication that the examinee will be looking at
- Event 5 - Specify MSIS and CSAS actuation setpoints o Added setpoints
- Event 5 - Add critical task for securing RCPs o Added critical task
- Event 5 - Terminate after entering ESD procedure o Updated termination criteria Scenario 2:
- Driver Setup - Added taking CEDMCS Mode Selector Switch to Auto Sequential.
Added note to place Protected Equipment placard over AFB-P01 and AFN-P01
- Crew Turnover - Added that AFB-P01 and AFN-P01 are protected. Added the status of MFPs
- Event 1 - Specify affected SG o Specified affected SG
- Event 1 - Proceed to next event once DFWCS alarms reset o Adjusted the point to move to the next event
- Event 2 - Added the specific battery charger breaker to the Driver Cue
- Event 3 - Actions to take load off the turbine/borate o Added an Examiner Note that says that if the crew is slow to stop the boration that they will need to take load off the Main Turbine to raise pressure
- Event 3 - Added breaker noun names to Driver Note
- Event 5 - Add TS call 3.1.5 cond A, 3.2.4 A, 3.2.1 A, 3.2.3 A o Added all LCOs. Also added note to the Driver to record POL values. Added Examiner Note to ask the CRS to evaluate Tech Specs post scenario.
- Event 5 - Removed boration steps since a boration will not be needed
- Event 6 - Added driver note for the Attachment 58A performance Scenario 3:
- Driver Setup - Added note to place Protected Equipment placard over AFB-P01 and AFN-P01
- Crew Turnover - Added that AFB-P01 and AFN-P01 are protected
- Event 2 - Specify unaffected channel o Specified 100Y
- Event 3 - Add applicable RM alarms o Added all applicable RM alarms
- Event 3 - Specify steps to isolate letdown o Included valves that will isolate letdown
- Event 4 - Removed move changing blowdown constants from move on point
- Event 5 - Specify procedural source for guidance provided o Added procedural source for guidance
- Event 6 - Add RM alarms expected o Added expected RM alarm
- Event 6 - Containment sump, humidity info, sump, temp info o Added Containment parameters to expected indications
- Event 6 - Determine leak rate steps and add o Added appendix for leak rate determination
- Event 6 - TS expand 3.4.14 A o Expanded TS information
- Event 7 - Add note that operator will have to manually start HPSI A o Added Examiner note
- Event 7 - Add SIAS setpoint and time 30 minute clock starts o Added setpoint and when time starts
- Event 7 - Add when LOCA starts for 30 minute clock on H2 Analyzers o Added start time
- Event 7 - Add additional leak rate from Event 6 o Added leak rate Scenario 4:
- Driver setup - Added SG feed rate and RCS temperature
- Crew turnover - Added detail to the turnover
- Event 1 - Added wait time for Driver Cue
- Event 2 - Add RCP AOP steps o Added steps
- Event 3 - Add AFW valve numbers and note that they will close the valves o Added valve numbers and that the valves will be closed
- Event 3 - Add table C2 from Appendix C o Added appendix
- Event 3 - TS 3.6.3 applies o Verified with Operations 3.6.3 does not apply and removed from the scenario
- Event 4 - Add note to what unaffected channel is expected to be switched to (Tave 2) and volts (4.3v) o Added the expected channel and voltage
- Event 4 - Add note to specify CEDMCS desired mode of operation (manual sequential) o Added note
- Event 4 - Auto trigger Event 5 when report made o Changed Event 5 initiation to when report to CRS is made
- Event 7 - Specify to feed using AFA-P01
- Where does 11 minute time limit come from?
- The site has an agreement with NERC that says the site will lower Main Turbine load up to 600 MW within 15 minutes of the request. It will take 4 minutes from receiving the phone call from the ECC to get to the step when action is actually taken (start time of the JPM), therefore 11 minutes.
JPM S-2:
- Where does 5 minute time limit come from?
- 5 minutes is a Time Critical Action from the time a RAS initiates to ensure that HPSI suction has shifted to the Containment sump and to ensure that RWT Outlet isolation valves have closed.
JPM S-3:
- Changed validation time to 5 minutes JPM S-4:
- Possible to somehow time compress Step 4?
o Discussed and determined not to time compress
JPM S-5:
- In task standard, FVIW should be FWIV.
o Revised
- Changed step 9 to one set, step 12 to OR, 13 to one set, 18 to OR JPM S-6:
- JPM has wrong title (remotely start)?
- This is not the title of the JPM, this is the task used from our Master Task List
- Where does 5 minute time limit come from?
- 5 minutes was determined from engineering data that would be a conservative estimate of when damage would occur from reverse motoring a diesel.
JPM S-7:
- Changed validation time to 7 minutes. Added another operator will complete procedure at termination JPM P-1:
JPM P-2:
JPM P-3:
- What method should be used to communicate with local operator in step 6?
- The cue indicates that the operator will be contacted using a radio JPM A-1:
- Initiating cue provides student with specific reference needed to arrive at correct answer. Change to per Palo Verde administrative procedural requirements.
o Changed cue to per Palo Verde administrative procedural requirements.
JPM A-2:
- Is providing student with what specific reference is required to evaluate answer necessary?
- Changed cue to per plant procedural requirements
- Change validation time from 5 minutes to 10 minutes?
- Discussed during Prep Week and determined to keep validation time 5 minutes JPM A-3:
- In initiating cue, change Per LCO 3.4.12, Pressurizer Vents, to Per Technical Specifications.
- Changed cue to per Technical Specifications
- Corrected task standard to only include critical steps
- Added handout with Pressurizer Vent drawing JPM AS-4:
- Removed unisolable from cue.
- Used Auxiliary Operator for position instead of AO JPM A-5:
- Run this first on administration day so all operators have same start time o Scheduled
- Corrected task standard to only include critical steps
- Add time critical requirement in critical step.