ML23037A121

From kanterella
Revision as of 03:23, 21 March 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
COL Docs - FW Re Action Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))
ML23037A121
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/06/2023
From:
NRC
To:
References
Download: ML23037A121 (3)


Text

From: Billy Gleaves Sent: Monday, February 6, 2023 10:40 AM To: Vogtle PEmails

Subject:

FW: Re: ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))

Sent to ADAMS for record.

From: Simonton1, Barty <Barty.Simonton1@dnr.ga.gov>

Sent: Sunday, February 5, 2023 10:59 AM To: Billy Gleaves <Bill.Gleaves@nrc.gov>

Cc: Cayetano Santos <Cayetano.Santos@nrc.gov>; Victor Hall <Victor.Hall@nrc.gov>; Matos, David

<David.Matos@dnr.ga.gov>; Vogtle PEmails <Vogtle.PEmails@usnrc.onmicrosoft.com>; Michael Spencer <Michael.Spencer@nrc.gov>; Garry Armstrong <Garry.Armstrong@nrc.gov>

Subject:

[External_Sender] Re: ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))

I do not have any comments.

Barty Simonton Get Outlook for iOS From: Billy Gleaves <Bill.Gleaves@nrc.gov>

Sent: Sunday, February 5, 2023 10:44:19 AM To: Simonton1, Barty <Barty.Simonton1@dnr.ga.gov>

Cc: Cayetano Santos <Cayetano.Santos@nrc.gov>; Victor Hall <Victor.Hall@nrc.gov>; Matos, David

<David.Matos@dnr.ga.gov>; Vogtle PEmails <Vogtle.PEmails@usnrc.onmicrosoft.com>; Michael Spencer <Michael.Spencer@nrc.gov>; Garry Armstrong <Garry.Armstrong@nrc.gov>

Subject:

ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Mr. Simonton, I hope this email finds you well.

The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91.

The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor.

SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023.

Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023.

The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical.

Respectfully, Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 652 Mail Envelope Properties (DM6PR09MB4839C14A62079D5DB053490E9FDA9)

Subject:

FW Re ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))

Sent Date: 2/6/2023 10:40:08 AM Received Date: 2/6/2023 10:40:10 AM From: Billy Gleaves Created By: Bill.Gleaves@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None Post Office: DM6PR09MB4839.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4049 2/6/2023 10:40:10 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: