ML20117C275
Letter Sequence Other | |
---|---|
TAC:57619, (Open) | |
Initiation Administration Results
Other: AECM-85-0289, Forwards Revised Proposed Tech Spec Change Concerning Spent Fuel Pool & Upper Containment Pool Storage Capacity After Installation of High Density Spent Fuel Racks,Per 850506 Submittal, AECM-85-0297, Forwards Correction to Table 1 of 850815 Final Response to NRC Question Re Dynamic Analysis of High Density Spent Fuel Racks Proposed for Installation at Facility, AECM-85-0352, Forwards Clarification of Use of Stress Criteria for High Density Spent Fuel Racks,In Response to NRC Request.Stress Criteria Differences Between OT Position Paper & NUREG-0800 Amount to Same Limits for Rack Modules, AECM-86-0077, Forwards Revised Spent Fuel Loading Pattern Developed to Maintain Dose Rate Contribution from Spent Fuel in Auxiliary Bldg Spent Fuel Pool Area Below 2.5 Mrems/H for Routinely Accessible Areas, AECM-86-0179, Forwards Revised Tech Spec Page 5-6 Inadvertently Omitted from 860605 Submittal Re High Density Spent Fuel Racks, AECM-86-0229, Forwards Responses to NRC Concerns Re Spent Fuel Decay Heat Capability & Associated Operating Procedures,Per 860716 Telcon.Requests That OL Amend for High Density Racks Be Granted on 860818, ML20117C275, ML20117C283, ML20205D440, ML20205T067 | |
MONTHYEARML20117C2831985-05-0606 May 1985
[Table View]Licensing Rept,High-Density Spent Fuel Racks Project stage: Other AECM-85-0143, Forwards Application for Amend to License NPF-29,changing Tech Specs to Allow Replacement of low-density Aluminum Spent Fuel Racks w/high-density Spent Fuel Racks. Licensing Rept,High-Density Spent Fuel Racks, Encl.Fee Paid1985-05-0606 May 1985 Forwards Application for Amend to License NPF-29,changing Tech Specs to Allow Replacement of low-density Aluminum Spent Fuel Racks w/high-density Spent Fuel Racks. Licensing Rept,High-Density Spent Fuel Racks, Encl.Fee Paid Project stage: Request ML20117C2611985-05-0606 May 1985 Application for Amend to License NPF-29,changing Tech Specs to Allow Replacement of Current low-density Aluminum Spent Fuel Racks w/high-density Spent Fuel Racks to Provide Increased Storage Capacity Project stage: Request ML20117C2751985-05-0606 May 1985 Proposed Tech Specs Allowing Replacement of Current low-density Aluminum Spent Fuel Racks w/high-density Spent Fuel Racks to Provide Increased Storage Capacity Project stage: Other ML20129F9581985-07-0505 July 1985 Forwards Request for Addl Info Re High Density Spent Fuel Racks in Upper Containment Pool & in Spent Fuel Storage Pool.Response Due by 850715 Project stage: RAI ML20133A1781985-07-26026 July 1985 Forwards Request for Addl Info Re Application to Amend License NPF-29,allowing Installation of High Density Spent Fuel Racks in Upper Containment Pool & Spent Fuel Storage Pool.Info Requested by 850815 Project stage: RAI AECM-85-0229, Responds to 850705 Request for Addl Info Re Structural Analyses Presented in 850506 Application for Amend to License NPF-29,allowing Installation of High Density Spent Fuel Racks.Direct Stress Below Liner Matl Ultimate Stress1985-07-29029 July 1985 Responds to 850705 Request for Addl Info Re Structural Analyses Presented in 850506 Application for Amend to License NPF-29,allowing Installation of High Density Spent Fuel Racks.Direct Stress Below Liner Matl Ultimate Stress Project stage: Request ML20136H1801985-08-0909 August 1985 Forwards Request for Addl Info Re 850506 Request for Amend to License NPF-29,allowing Installation of High Density Spent Fuel Racks in Upper Containment Pool & in Spent Storage Pool.Info Requested by 850826 Project stage: RAI AECM-85-0252, Responds to NRC 850705 Request for Addl Info Re Structural Analyses Presented in Application for Amend to License NPF-29,authorizing Installation of High Density Spent Fuel Racks.Info Re Numerical Solution of Dynamic Analyses Encl1985-08-15015 August 1985 Responds to NRC 850705 Request for Addl Info Re Structural Analyses Presented in Application for Amend to License NPF-29,authorizing Installation of High Density Spent Fuel Racks.Info Re Numerical Solution of Dynamic Analyses Encl Project stage: Request AECM-85-0272, Forwards Response to NRC 850726 Request for Addl Info Re Amend to License NPF-29,allowing Installation of High Density Spent Fuel Racks.Tech Spec Section 4.5 Changed to Conform to Ref Design Used in Analysis1985-08-30030 August 1985 Forwards Response to NRC 850726 Request for Addl Info Re Amend to License NPF-29,allowing Installation of High Density Spent Fuel Racks.Tech Spec Section 4.5 Changed to Conform to Ref Design Used in Analysis Project stage: Request AECM-85-0297, Forwards Correction to Table 1 of 850815 Final Response to NRC Question Re Dynamic Analysis of High Density Spent Fuel Racks Proposed for Installation at Facility1985-09-11011 September 1985 Forwards Correction to Table 1 of 850815 Final Response to NRC Question Re Dynamic Analysis of High Density Spent Fuel Racks Proposed for Installation at Facility Project stage: Other AECM-85-0289, Forwards Revised Proposed Tech Spec Change Concerning Spent Fuel Pool & Upper Containment Pool Storage Capacity After Installation of High Density Spent Fuel Racks,Per 850506 Submittal1985-09-12012 September 1985 Forwards Revised Proposed Tech Spec Change Concerning Spent Fuel Pool & Upper Containment Pool Storage Capacity After Installation of High Density Spent Fuel Racks,Per 850506 Submittal Project stage: Other AECM-85-0352, Forwards Clarification of Use of Stress Criteria for High Density Spent Fuel Racks,In Response to NRC Request.Stress Criteria Differences Between OT Position Paper & NUREG-0800 Amount to Same Limits for Rack Modules1985-11-0101 November 1985 Forwards Clarification of Use of Stress Criteria for High Density Spent Fuel Racks,In Response to NRC Request.Stress Criteria Differences Between OT Position Paper & NUREG-0800 Amount to Same Limits for Rack Modules Project stage: Other AECM-85-0410, Forwards Response to NRC Request to Determine & Submit Occupational Exposures Associated W/Operation W/High Density Spent Fuel Racks,Per 850506 Application for Amend to License NPF-29,allowing Installation of Racks1985-12-18018 December 1985 Forwards Response to NRC Request to Determine & Submit Occupational Exposures Associated W/Operation W/High Density Spent Fuel Racks,Per 850506 Application for Amend to License NPF-29,allowing Installation of Racks Project stage: Request AECM-86-0077, Forwards Revised Spent Fuel Loading Pattern Developed to Maintain Dose Rate Contribution from Spent Fuel in Auxiliary Bldg Spent Fuel Pool Area Below 2.5 Mrems/H for Routinely Accessible Areas1986-03-14014 March 1986 Forwards Revised Spent Fuel Loading Pattern Developed to Maintain Dose Rate Contribution from Spent Fuel in Auxiliary Bldg Spent Fuel Pool Area Below 2.5 Mrems/H for Routinely Accessible Areas Project stage: Other AECM-86-0011, Responds to 850809 Request for Addl Info Re 850506 Application for Amend to License NPF-29,allowing for Installation of High Density Spent Fuel Racks1986-03-15015 March 1986 Responds to 850809 Request for Addl Info Re 850506 Application for Amend to License NPF-29,allowing for Installation of High Density Spent Fuel Racks Project stage: Request AECM-86-0176, Application for Amend to License NPF-29,changing Tech Specs 3/4.7.9.1 & 5.6.3 Re Installation of High Density Spent Fuel Racks,In Response to NRC Concerns from Review of Util .Affirmation & Justification for Change Encl1986-06-0505 June 1986 Application for Amend to License NPF-29,changing Tech Specs 3/4.7.9.1 & 5.6.3 Re Installation of High Density Spent Fuel Racks,In Response to NRC Concerns from Review of Util .Affirmation & Justification for Change Encl Project stage: Request ML20205T3631986-06-0505 June 1986 Proposed Changes to Tech Specs 3/4.7.9.1 & 5.6.3 Re Installation of High Density Spent Fuel Racks Project stage: Request ML20205T0671986-06-0909 June 1986 Revised Tech Spec Page 5-6 Re High Density Spent Fuel Racks Project stage: Other AECM-86-0179, Forwards Revised Tech Spec Page 5-6 Inadvertently Omitted from 860605 Submittal Re High Density Spent Fuel Racks1986-06-0909 June 1986 Forwards Revised Tech Spec Page 5-6 Inadvertently Omitted from 860605 Submittal Re High Density Spent Fuel Racks Project stage: Other AECM-86-0229, Forwards Responses to NRC Concerns Re Spent Fuel Decay Heat Capability & Associated Operating Procedures,Per 860716 Telcon.Requests That OL Amend for High Density Racks Be Granted on 8608181986-07-25025 July 1986 Forwards Responses to NRC Concerns Re Spent Fuel Decay Heat Capability & Associated Operating Procedures,Per 860716 Telcon.Requests That OL Amend for High Density Racks Be Granted on 860818 Project stage: Other ML20205D4401986-07-28028 July 1986 Notice of Violation from Insp on 860613-0714 Project stage: Other 1985-08-09 |
ML20117C275 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 05/06/1985 |
From: | MISSISSIPPI POWER & LIGHT CO. |
To: | |
Shared Package | |
ML20117C244 | List: |
References | |
TAC-57619, NUDOCS 8505090375 | |
Download: ML20117C275 (1) | |
Similar Documents at Grand Gulf | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211E7151999-08-20020 August 1999
[Table view]Proposed Tech Specs,Incorporating Many Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0831999-06-29029 June 1999 Proposed Tech Specs Page 3.4-3,reflecting Implementation of BWROG Enhanced Option I-A,reactor Stability long-term Solution ML20196G7131999-06-23023 June 1999 Proposed Tech Specs Revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5361999-05-0606 May 1999 Proposed Tech Specs Pages,Changing SLMCPR ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20154Q4511998-10-16016 October 1998 TS Bases Update for Period of 970410 Through 981015 ML20236T1661998-07-20020 July 1998 Proposed Tech Specs 3.2.4,3.3.1.1,3.3.1.3,3.4.1,5.6.5, B 3.2.4,B 3.3.1.1,B 3.3.1.3 & B 3.4.1,enabling Full Implementation of Enhanced Option I-A Long Term Solution to Address Neutronic/Thermal Hydraulic Instability Issue ML20198J3581998-01-0909 January 1998 Proposed Tech Specs,Providing Certain Clarifications to Amend & Adding Restriction to Allowed Interval Extensoions ML20198N3941997-10-28028 October 1997 Proposed Tech Specs Implementing Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20211M8481997-10-0606 October 1997 Proposed Tech Specs Replacement Bases Pages Associated W/Proposed Amend to License Re Response Time Testing ML20210V5581997-09-18018 September 1997 Proposed Tech Specs Reflecting Decrease of Two Recirculation Loop SLMCPR Limit to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12 ML20210H0871997-08-0606 August 1997 Proposed Tech Specs Changing TS 3.8.1, AC Sources Operating. Removal of Accelerated Testing Requirements for Standby DGs as Advised by GL 94-01 ML20141A1681997-05-0707 May 1997 Proposed Tech Specs Re Eliminating Selected Response Time Testing Requirements ML20140E3211997-04-18018 April 1997 Proposed Tech Specs,Revising TS Bases to Include Changes Made Since Rev 1 Was Sent to NRC 960201 ML20134N7841996-11-21021 November 1996 Proposed Tech Specs Pp 5.0-20 & 5.0-21,revised by Adding Footnote Indicating Proposed Change Applicable Only for Cycle 9 ML20134N7611996-11-20020 November 1996 Proposed Tech Specs Re MCPR Limits for Two Recirculation Loop Operation ML20134E1261996-10-22022 October 1996 Proposed Tech Specs Revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Procedure, Curves Using Methodology of NRC Reg Guide 1.99, Rev 2, Radiation Embrittlement of Reactor Vessel Matls ML20128M5681996-10-0909 October 1996 Proposed Tech Specs 3.8.1.14 Re Surveillance Requirements ML20117P4461996-09-19019 September 1996 Proposed Tech Specs Re Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117M7021996-09-0505 September 1996 Proposed Tech Specs Re Min Critical Power Safety Limit ML20117G6781996-08-27027 August 1996 Proposed Tech Specs Re Surveillance Requirements for Safety/Relief Valves ML20116F0211996-07-31031 July 1996 Proposed Tech Specs Required to Support Cycle 9,reload 8 ML20113B7381996-06-20020 June 1996 Proposed Tech Specs,Redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20117F4661996-05-0909 May 1996 Proposed Tech Specs,Modifying SRV Surveillance Test for Relief Mode of Operation ML20117D6941996-05-0909 May 1996 Proposed Tech Specs Required to Support Unit 1 Cycle 9, Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits.Addl Methodology Ref in Various TS Bases Revised to Reflect GE Methodologies ML20111B2701996-05-0808 May 1996 Proposed Tech Specs,Placing Containment Purge Valves W/ Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3591996-05-0606 May 1996 Proposed Tech Specs Re Change in Co Name from Mississipi Power & Light to Entergy Mississippi,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20100J8391996-02-22022 February 1996 Proposed Tech Specs Re Safety Setpoint Tolerance Requirements for Safety/Relief Valves ML20097C3541996-02-0101 February 1996 Proposed Tech Specs,Revising TS Bases to Include Changes Since 950221 Approval of TS Bases ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20087B5061995-08-0404 August 1995 Proposed Tech Specs Assoc W/Various ESF Sys Following Design Basis Fuel Handling Accident ML20082K3451995-04-13013 April 1995 Proposed Tech Specs Re Change to Be Reduced to Leave in TS Requirement to Test Outboard MSIV LCS Blowers ML20078S5141995-02-14014 February 1995 Proposed TS Consisting of Changes to SR 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6611995-02-10010 February 1995 Proposed Tech Specs Supporting Performance of Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4501994-11-0909 November 1994 Proposed Tech Specs Associated W/Various ESF Systems Following Design Basis Fuel Handling Accident ML20070C9751994-06-24024 June 1994 Proposed TS Pages 3/4 6-4 & 3/4 6-6 Associated W/Proposed Exemption to 10CFR50,App J ML20065L4971994-04-15015 April 1994 Proposed Tech Specs Re Administrative Controls ML20059H6061994-01-13013 January 1994 Proposed Tech Specs,Removing 2,324 Spent Fuel Pool Storage Limit ML20058D3911993-11-23023 November 1993 Proposed Tech Specs Bases Pages Re Cycle 7 Reload ML20059A4871993-10-22022 October 1993 Proposed Tech Specs Modifying Testing Frequencies for Drywell Test & Airlock Tests ML20059B0351993-10-15015 October 1993 Proposed Tech Specs Converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20057C7281993-09-23023 September 1993 Proposed Tech Specs Removing Surveillance Requirement 4.4.1.2.2 Due to Problems Encountered W/Jet Pump Differential Pressure Instrumentation Measurements ML20056E4511993-08-12012 August 1993 Proposed Tech Specs 3/4 6-3,6-4,6-4a,6-6,6-12 Re Exemption to 10CFR50,App J, Primary Reactor Containment..., for Local Leak Rate ML20056D5621993-08-11011 August 1993 Proposed Tech Specs Section 3/4.3.7.5 Reflecting Relocation of Certain Accident Monitoring Instrumentation to Administrative Control ML20046D2081993-08-11011 August 1993 Proposed Tech Specs Section 3/4.3.7.10, Loose Part Detection Sys, Relocating Loose Part Detection Instrumentation from TS to Administrative Control ML20046D1961993-08-11011 August 1993 Proposed Tech Specs Supporting Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056C7141993-07-15015 July 1993 Proposed Tech Specs Removing Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve 1999-08-20 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20211E7151999-08-20020 August 1999
[Table view]Proposed Tech Specs,Incorporating Many Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0831999-06-29029 June 1999 Proposed Tech Specs Page 3.4-3,reflecting Implementation of BWROG Enhanced Option I-A,reactor Stability long-term Solution ML20196G7131999-06-23023 June 1999 Proposed Tech Specs Revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5361999-05-0606 May 1999 Proposed Tech Specs Pages,Changing SLMCPR ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20154Q4511998-10-16016 October 1998 TS Bases Update for Period of 970410 Through 981015 ML20236T1661998-07-20020 July 1998 Proposed Tech Specs 3.2.4,3.3.1.1,3.3.1.3,3.4.1,5.6.5, B 3.2.4,B 3.3.1.1,B 3.3.1.3 & B 3.4.1,enabling Full Implementation of Enhanced Option I-A Long Term Solution to Address Neutronic/Thermal Hydraulic Instability Issue ML20198J3581998-01-0909 January 1998 Proposed Tech Specs,Providing Certain Clarifications to Amend & Adding Restriction to Allowed Interval Extensoions ML20210F6651997-12-22022 December 1997 Redeacted Version of Test Rept M-J5.08-Q1-45161-0-8.0-1-0, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators for Entergy Operations ML20217H6211997-12-15015 December 1997 Rev 21 to Odcm ML20199L5711997-11-26026 November 1997 Rev 8 to Program Plan GGNS-M-189.1, Grand Gulf Nuclear Station Pump & Valve IST Program - Safety Related ML20198N3231997-11-0606 November 1997 Rev 11 to GGNS-M-489.1, Program Plan for ASME Section XI ISI Plan ML20198N3941997-10-28028 October 1997 Proposed Tech Specs Implementing Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20211M8481997-10-0606 October 1997 Proposed Tech Specs Replacement Bases Pages Associated W/Proposed Amend to License Re Response Time Testing ML20210V5581997-09-18018 September 1997 Proposed Tech Specs Reflecting Decrease of Two Recirculation Loop SLMCPR Limit to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12 ML20210H0871997-08-0606 August 1997 Proposed Tech Specs Changing TS 3.8.1, AC Sources Operating. Removal of Accelerated Testing Requirements for Standby DGs as Advised by GL 94-01 ML20141A1681997-05-0707 May 1997 Proposed Tech Specs Re Eliminating Selected Response Time Testing Requirements ML20140E3211997-04-18018 April 1997 Proposed Tech Specs,Revising TS Bases to Include Changes Made Since Rev 1 Was Sent to NRC 960201 ML20134N7841996-11-21021 November 1996 Proposed Tech Specs Pp 5.0-20 & 5.0-21,revised by Adding Footnote Indicating Proposed Change Applicable Only for Cycle 9 ML20134N7611996-11-20020 November 1996 Proposed Tech Specs Re MCPR Limits for Two Recirculation Loop Operation ML20134E1261996-10-22022 October 1996 Proposed Tech Specs Revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Procedure, Curves Using Methodology of NRC Reg Guide 1.99, Rev 2, Radiation Embrittlement of Reactor Vessel Matls ML20128M5681996-10-0909 October 1996 Proposed Tech Specs 3.8.1.14 Re Surveillance Requirements ML20117P4461996-09-19019 September 1996 Proposed Tech Specs Re Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117M7021996-09-0505 September 1996 Proposed Tech Specs Re Min Critical Power Safety Limit ML20117G6781996-08-27027 August 1996 Proposed Tech Specs Re Surveillance Requirements for Safety/Relief Valves ML20116F0211996-07-31031 July 1996 Proposed Tech Specs Required to Support Cycle 9,reload 8 ML20113B7381996-06-20020 June 1996 Proposed Tech Specs,Redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20117D6941996-05-0909 May 1996 Proposed Tech Specs Required to Support Unit 1 Cycle 9, Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits.Addl Methodology Ref in Various TS Bases Revised to Reflect GE Methodologies ML20117F4661996-05-0909 May 1996 Proposed Tech Specs,Modifying SRV Surveillance Test for Relief Mode of Operation ML20111B2701996-05-0808 May 1996 Proposed Tech Specs,Placing Containment Purge Valves W/ Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3591996-05-0606 May 1996 Proposed Tech Specs Re Change in Co Name from Mississipi Power & Light to Entergy Mississippi,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20100J8391996-02-22022 February 1996 Proposed Tech Specs Re Safety Setpoint Tolerance Requirements for Safety/Relief Valves ML20097C3541996-02-0101 February 1996 Proposed Tech Specs,Revising TS Bases to Include Changes Since 950221 Approval of TS Bases ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20087B5061995-08-0404 August 1995 Proposed Tech Specs Assoc W/Various ESF Sys Following Design Basis Fuel Handling Accident ML20082K3451995-04-13013 April 1995 Proposed Tech Specs Re Change to Be Reduced to Leave in TS Requirement to Test Outboard MSIV LCS Blowers ML20108A2691995-03-10010 March 1995 Rev 17 to ODCM ML20078S5141995-02-14014 February 1995 Proposed TS Consisting of Changes to SR 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6611995-02-10010 February 1995 Proposed Tech Specs Supporting Performance of Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4501994-11-0909 November 1994 Proposed Tech Specs Associated W/Various ESF Systems Following Design Basis Fuel Handling Accident ML20070C9751994-06-24024 June 1994 Proposed TS Pages 3/4 6-4 & 3/4 6-6 Associated W/Proposed Exemption to 10CFR50,App J ML20065L4971994-04-15015 April 1994 Proposed Tech Specs Re Administrative Controls ML20059H6101994-01-14014 January 1994 Cycle 7 Startup Physics Test Summary Rept for Physics Testing Completed on 931220 ML20059H6061994-01-13013 January 1994 Proposed Tech Specs,Removing 2,324 Spent Fuel Pool Storage Limit ML20029D6451993-11-30030 November 1993 Reactor Containment Bldg 1993 Integrated Leakage Rate Test. ML20058D3911993-11-23023 November 1993 Proposed Tech Specs Bases Pages Re Cycle 7 Reload ML20059A4871993-10-22022 October 1993 Proposed Tech Specs Modifying Testing Frequencies for Drywell Test & Airlock Tests 1999-08-20 |
Text
-
DESIGN FEATURES 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.1.2-1.
5.6 FUEL STORAGE CRITICALITY 5.6.1 The spent fuel storage racks are designed and shall be maintained with:
- a. A k,ff equivalent to less than or equal to 0.95 when flooded with unborated water, including all calculational uncertainties and biases as described in Section 4.3 of the FSAR.
6.26
- b. A nominal-Mvinch center-to-center distance between fuel assemblies placed in the storage racks.
5.6.1.2 The k,ff for new fuel for the first core loading stored dry in the spent fuel storage racks shall not exceed 0.98 when aqueous foam moderation is
. assumed.
DRAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadve'rtent draining of the pool below elevation 202'5 1/4".
CAPACITY C4 AdC 8D 5.6.3 The spent fuel storage-peep'is designed and shall be :: int:in:d with :
- tcr:;;; ::p::!ty limited to::: : re th:n 1270 S:1 ;,ublic,.
N 5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components identified in Table 5.7.1-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7.1-1.
- a. no moys-sk.n 4352 kl assemblie.s in the spe><t hel pool, b.No more. t Aa.n goo M assemblies h de upfo conk.',uunf p**/.
8505090375 850506 PDR ADOCK 05000416
( P PDR GRAND GULF-UNIT 1 5-6 AnulAeN6 Mo.
.n .
- - . , _ - - - - - , . - . ,.