ML22187A050

From kanterella
Revision as of 07:42, 18 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Global Nuclear Fuel - Americas LLC, - Inspection Schedule for Calendar Year 2023
ML22187A050
Person / Time
Site: 07001113
Issue date: 07/06/2022
From: Leonard Pitts
NRC/RGN-II/DFFI
To: Nay D
Global Nuclear Fuel
References
Download: ML22187A050 (3)


Text

July 6, 2022 Mr. Doug Nay Facility Manager Global Nuclear Fuel - Americas, L.L.C.

P.O. Box 780, Mail Code J20 Wilmington, NC 28402

SUBJECT:

GLOBAL NUCLEAR FUEL - AMERICAS, L.L.C. - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023

Dear Mr. Nay:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Global Nuclear Fuel - Americas facility in calendar year 2023. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Joel Rivera at (404) 997-4825 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Leonard Pitts, Acting Branch Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07001113 License No. SNM-1097

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

D. Nay

SUBJECT:

GLOBAL NUCLEAR FUEL - AMERICAS, L.L.C. - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023 DISTRIBUTION:

A. Masters, RII/DFFI A. Rivera-Varona, NMSS/DFM J. Rivera-Ortiz, RII/DFFI J. Rowley, NMSS/DFM J. Rubenstone, NMSS/DFM J. Zimmerman, NMSS/DFM L. Cooke, RII/DFFI R. Williams, RII/DFFI

2023 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR GLOBAL NUCLEAR FUEL - AMERICAS, L.L.C.

Dates Number of Description/Inspection Procedures (IPs)

Inspectors January 30 - February 2 1 Nuclear Criticality Safety 1 (IP 88015)

March 20 - 23 2 Fire Protection (IP 88055)

May 22 - 25 2 Operational Safety 1 (IP 88020)

August 7 - 10 3 Plant Modifications - Triennial (IP 88072)

August 28 - 31 1 Nuclear Criticality Safety 2 (IP 88015)

November 27 - 30 2 Operational Safety 2 (IP 88020)

December 11 - 14 2 Material Control and Accounting (Various IPs)

To Be Determined 3 Evaluation of Exercises and Drills (IP 88051)

Enclosure