MONTHYEARML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML22251A3682022-09-0909 September 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000335 2022011, 05000389 2022011) and Request for Information (RFI) ML22077A3732022-03-22022 March 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000335/20170112017-04-18018 April 2017 Final Significance Determination of a White Finding; NRC Inspection Report 05000335/2017011 IR 05000335/20080072008-04-18018 April 2008 IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes IR 05000335/20074022007-07-26026 July 2007 Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed ML0708501102007-03-22022 March 2007 NRC Inspection Report No. 05000335,389/2007401 IR 05000335/20070012007-03-0101 March 2007 Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335, 389/2007001) IR 05000335/20064012007-01-18018 January 2007 NRC Inspection Report 05000335-06-401 and 05000389-06-401 IR 05000335/20060072006-11-24024 November 2006 IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed IR 05000033/20060032006-07-27027 July 2006 IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 ML0401608942003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401201012003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401200992003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0400902832003-12-22022 December 2003 Undated Inspection Post-Inspection Debrief to Region II DRS Managers Regarding St. Lucie Triennial Fire Protection Inspection ML0401201042003-04-0404 April 2003 Input for St Lucie Inspection Report 03-02 IR 05000335/20020052002-05-21021 May 2002 IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified ML0209508842002-04-0505 April 2002 IR 05000335/2002-006, St. Lucie Nuclear Power Plant, Inspection on 03/14/2002-04/03/2002 Related to Fire Protection Unresolved Item 50-335, 389/98-201-09 IR 05000335/20010072002-03-0707 March 2002 IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted IR 05000335/20010052002-01-28028 January 2002 IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted 2024-04-18
[Table view] Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] |
Text
March 22, 2022 Mr. Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company 700 Universe Blvd.
Mail Stop: EX/JB Juno Beach, FL 33408
SUBJECT:
ST. LUCIE NUCLEAR PLANT, UNIT 1 - REVIEW OF THE SPRING 2021 STEAM GENERATOR TUBE INSPECTION REPORT (EPID L-2021-LRO-0061)
Dear Mr. Coffey:
By letter dated November 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21305A868), Florida Power & Light Company (the licensee) submitted information summarizing the results of the spring 2021 steam generator (SG) inspections at St. Lucie Nuclear Plant (St. Lucie), Unit 1. These inspections were performed during refueling outage 30.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information referenced above and concludes that the licensee provided the information required by their technical specifications and that no additional follow-up is required at this time. The enclosure contains the NRC staffs review of the submittal.
If you have any questions, please contact me at (301) 415-7410, or via email at Natreon.Jordan@nrc.gov.
Sincerely, Digitally signed by Natreon J. Natreon J. Jordan Date: 2022.03.22 Jordan 17:24:38 -04'00' Natreon (Nate) J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
Review of Steam Generator Tube Inspection Report cc: Listserv
REVIEW OF THE SPRING 2021 STEAM GENERATOR TUBE INSPECTION REPORT FLORIDA POWER AND LIGHT COMPANY ST. LUCIE NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-335 By letter dated November 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21305A868), Florida Power & Light Company (the licensee) submitted information summarizing the results of the spring 2021 steam generator (SG) inspections at St. Lucie Nuclear Plant (St. Lucie), Unit 1 (St. Lucie Unit 1). These inspections were performed during refueling outage 30 (RFO 30).
St. Lucie Unit 1 has two replacement SGs designed and fabricated by Babcock and Wilcox International that were installed in 1997. Each SG has 8,523 thermally treated Alloy 690 tubes with a nominal outside diameter of 0.75 inches and a nominal wall thickness of 0.045 inches.
The tubes are arranged in a triangular pattern and were hydraulically expanded at each end for the full depth of the tubesheet. The tubes are supported by horizontal lattice grid tube supports over the straight length of the tubes. In the U-bend region, the tubes are supported by fan bar supports (FBS) and connector bar supports (CBS). All supports are fabricated from stainless steel. The U-bend region of the tubes in rows 1 through 20 was stress relieved after bending.
The tubes with the smallest U-bend radii are in Rows 2 and 3.
The inspection during RFO 30 was the seventh inservice inspection for the replacement SGs.
At the time of the inspection, the replacement SGs had accumulated approximately 246.0 effective full power months of operation. The licensee provided the scope, extent, methods, and results of the SG tube inspections in the document referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) that were taken in response to the inspection findings. Based on the review of the information provided, the NRC staff has made the following observations:
No tube wear exceeded the TS plugging limit of 40 percent through-wall. Five tubes with FBS wear in each SG were preventatively plugged to support the operational assessment until the next planned primary-side inspection.
Based on secondary-side visual inspection, the licensee reported discoloration and scouring on the outer surface of the bundle wrapper in SG-1B where feedwater discharges from the J-tubes. The licensee entered this condition into the corrective action program for monitoring during future SG inspections.
Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by their technical specifications. In addition, the staff concludes that there are no technical issues that warrant additional follow-up action at this time.
This is because the inspections appear to be consistent with the objective of detecting potential tube degradation, and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
Principal Contributor: G. Makar Enclosure
ML22077A373 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRR/DNRL/NCSG/BC NAME NJordan RButler SBloom DATE 03/17/2022 03/21/2022 03/17/2022 OFFICE DORL/LPL2-2/BC DORL/LPL2-2/PM NAME DWrona NJordan DATE 03/22/2022 03/22/2022