Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard Msiv'S ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 2023-04-20
[Table view] Category:Drawing
MONTHYEARML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4662023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard Msiv'S ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 2023-04-20
[Table view] |
Text
1 2 3 4 5 6 :..___.J....__ _ _ _ 1_ _ _ ____j__ _ _ _s_______L__ _ _ _9_ _ _ __L__ _ _ _ 1o _____j__ _ _ _ 11_ _ _ _..L__ _ _ _1_2_ _ _ ---,7 i
3/4"I-IY-15 I* t 1" 0
- 119A -3/.1 " 8. REFERENCE DRAWING 11506013 SH. I, 2 AN03 FOR INSTRUMENT RACK 25- 52.
- 3/4,"-so HY-I HY-IS 9, ALL VALVES ARE IN THE CONTROL ROD DRIVE (CRD)
{201Al Z37 SYSTEM UNLESS DESIGNATED OTHERWISE.
144 176 146 2-2 (10-R 107 10. THE START UP POSITION ASSUMES CRO-F-A IN SERVICE N 1.C, E-69-II 162 AND CRD-F-B IN STANDBY.
A @Jy ~ t;----------::--::----C,.(}---i f----{=]----,-----,r--=~.l.:l*"'C~RD!!;*:.,!1~19!!!.:-::,'l:!4_"_ _ _ _.!,3/4:!'4:.,"!;l-l~Y_:-'J_l:::S:__ _ _ _ _ _ _ _ _ ~ 11, DEVICES 3-134, 3-135,3-136 AND 3-137 ARE INTERNAL A
~'I; i TO THE HCU MANIFOLD CRD-HCU-M (XX-XX).
t FOR CONT. ~4"-51 CONTRACT E-69-11 f?
SEE DWG I HY-2 i ::
OJ
.ill
- m 12. DEVICE SHOWN THUS (x xx) DENOTES TOCOLDREFENCE--.:.LE;:G.:,:s_ _~_; 028, ZONE K 7 SEE DWG. 2027 SH.2 13 4'B (158)
FOR CO~TlNUATJONr SEE DWG.2026 SH.1, ZONE H-8 I "CR0-109 #
I
"""uI 2-2 2-2 2-2 (1I-R FOR CONT. SEE DWG. 2028 ZONE F-7 l 11 Rv)
_Jj
_ __:J ~ !!2 r;
\ ZONE F-2 s.::::J6f
~NE F-6 DWG. 2027 SH.1 a ;: INSTRUMENT LINE SNUBBER.
FOR CONT. SEE DWG, 2028 !ONE G-6 r"\i
\ 87 - 'SEE B \ ~ 201,.2.
'5\-1 I , ZONE C *4 1"
(187) 1" (188) ,_.!!!,~~3.;I:_ .3 - 1 NOTE: LCAVE WELD5 OPEN TIL ~
. ~ o 13. CONFIGURATION IS EITHER 2 ASCO VALVES
-_.,. !2 NC OR 1 AVCO VALVE l/2'!26<1ri S7'A4IHlf/ 1 CRD-17CV ' 1'!CRD-IIO
- ~ AFTER FLUSH/Hr;; AS /1,/DICATCD :;::J L ,. "
(159) I
. ; (3-15) ~OAJ71!A"-1; COWT;fl/&:T / -~, =~rr
~-,..---,-,IJ'--'--=---=~ / ;., &9--4 £ -t,,, - II 1/2,_"1Kl2)
TO FLOOR ORAIM
'ti,' (I031 -E-r<,9-4' Wt-I L--1 "' .5-IBS f-lYP/!AU< IC 345 346
~ _Pl:l;/ ~
FOR CON1: SE!'
~ (50MICRa41
, ,<tlT~ )
LJRIVIPVNP/4
( .1-J,;i}
.!IJ~ r., =C\l 336 '
riHV*'l.
' 343 344 DWG.202B ZONE G-6 / (14 *J 13RV}
3 153 39
. 1.-~,) "'
(223) 4 11-130 2" *11---i---*-*- 72 221 2*~17 rl><4:J---l
- i-....31-1 1-tM- IDS-4'~ CH-3 "' ,-' 342 CRD-F-C .3 COND SUPPLY \ ~ 1/2."-10""y. zzo :r B 1
'°' 219 B
0'.;;
FOR CON'T SEE I- * -* - Cr, .!lS _
DWG 2049 SH 4 - (A.', I 39 ) tllHI DP!
ZONE E-9 CI/-J FOR CONT SfE _'7 (202U
/'CJt--.3 DWG.2028 ZONE G-~,......___ ,
- [il) 4" -ll51 / t-"-..:r.?:'.--104 RVJ,' ,
,'m ~"(1051 J.' *,,,,,, ,,1 z*w--, "I' FOR CONT.
SEE OWG. fie4 185 '
~~
202B ZONE G-7 l H L 12018) 1-C.li! 0- I II- -
'], "I,/ -I "t- I 142 183 I
182
"- 181 HY-I ~-H'f-1!5 f,,
l - - - - - - ' f l40 157 _'f:._4'-.L~/,:::1-1:,:Y-,,;-.:;'s~M
,,,,:~";, A~M A t I !132 )
. I .11.,.,~J i'"" '54'
_, ..._ FOR CONT. SE£ <( _
a,;122 1*
y DWG. 2028 a: - FOR CONT. SEf SEE DETAI~ ~ T3 .l..::'.:!.) ~~
ZONE G* 7\ I- ,l, SEE DETA I L 'A' ~ _j " -~ [91 )
I z 'Al OWG. 2028 ZONE F-7 r - .__ ____ _ E-<.9-1 7'-
ti)
' "78 C ,....l60
....---1'---,'~~-F-\139~~~~,164~~165~3*~*-t~'.---'::._~8:'.j!w!....--I FROM "74 55 _J ; H~FI L j----==---. !lJ6) C EIS 3 - 3 0 9 t - - - - - - , 16 I~
1.141 ' 3 CRD-18CV OPEN :~ I I
161 132
{3-13)
INER HYDRAULIC DRIVE PUMP lB (3-16 l _.CH=-3-'-S~
HY-I LJ'zzs 229 11w*
L.-J FOR CONT. SEE Y:,"12661 CONTRACT E 69-4 CONTRACT E 69-11 U=
. a,'
- z. ,
TO COND.
11I 243
-~~-~---
11/2*1/Y-Js ~1 1
225 1/2" 22
'1'
,: 13'.l
...* FOR NO. OF HCU CONNECTED TO EACH BRANCH, SEE E-69-11 CONTRACTORS FLOW DIAG. CP-001 SH 2 DWG. 2028 ZONE G*7 if ~" :~1 ~ ~
STORAGE Tl<. 116 ~~
FOR CONT. SEE CING. 2049 ZONE F-8 SH;II 3 I~~
e~ )
FROM - - - - - - - - - < TO 314' 73 VALVE L- ~ :t4" (Bl)
EIS 3-309 T' - * !' "-38 I ----1 TO ~4 "74 VALVE rl4;>TAT:-,.:,J.,.C.'{\'ii15i3=-rl),17(j3.;"f'.!,:,;,.t.:f'r.;-,..-.,.,,-~.J ..!.
a I 92 )
D r-Tffl-1 - --
J-Zf$'6 294
- s-21s-,11
...d. I 't '
D 1
I P/*15 I I' 9-19 <J 3/4 * (BQj : FOR-CONT. SEE ~WG. 2026- SH.1, ZONE H-3 rln '
'1 54 j "'::""".'fl ~"1,;'";T 3"4" (83) J -C~0-104-1" n@j I' 9-* , ,.. /f!HI- IS 1.
TO FC-301
~"
~ 108 1/2,"J@
109 ~
~*IA*f.S
~" Ill ~ I -..,o:)
C'lf2* IA-174 (TYP)
@---+--@
l I "115 FOR NUMBER OF HCU CONNECTED E DRAIN BRANCH SEE CONTRACTORS E I " .5 I
I ' ) J FLOW DIAGRAM DWG CNS-CRD-13 NOTES' (cont.)
- 13. INSTRUMENT, SAMPLE, TEST, DRAIN eo ,--,~,;-*9eo / 1/2' IA-(246) 2 3 4 5 B
...ii.
I * , 1 IA-1596 AND VERT LINES ARE NOT ALWAYS THE SAME CLASS
/2 119 1 ..,.
- N N N N 246 f---f--1'-I VALVE l----!Xl---. J FOR NO. OF DRAIN I I I I AS THE MAIN LINE AND THESE BOUNDARIES ARE TOO NUMEROUS TO IDENTIFY IN THIS MANNER (SEE ISI 244 0 L__ _ _ _--" IA-245 BRANCHES REQ'D ~N~~~N ~~ PROGRAM BOUNDARY DESCRIPl'IONS FOR DETAILS!
240 SEE CONTRACTORS =~ .--- FOR NUMBER OF HCU CONNECTED
' . 14. THE REDUNDANT SEALS AND RESTRICTIVE FLOW AREAS THAT 0 1,z' IA-171 I!:D FLOW DIAGRAM TO EACH BRANCH SEE E-69-11 1,z"113 '12"114 DWG CNS-CRD-13 CONTRACTORS FLOW DIAGRAM ARE INHERENT TO THE CRD'S PROVIDE THE REQUIRED REDUN-DANT REACTOR COOLANT PRESSURE BOUNDARY ISOLATION.
<.J
!63A) !~s) 224 CP-001 SH 2 3/4, DETAIL 'A
- 15. VALVES 25CV &: 26CV ARE ESSENTIAL, CLASS IS.
FOR CONT. SEf DWG. 2028 ZONE F-3 B, ZONE F~6
' ..... r*~
(REFERENCE DC 89-285) AND THE CHECK VALVE ASSEMBLY IS RESTRAINED 222 TO SEISMIC CLASS IS CRITERIA .
1-Cli'O-lo2-2" 16. SIGHT GLASS ASSEMBLY MOUNTED ON EACH INSTRUMENT FROM /i' 1
1/-z" IA IA-6) 3/4'.'-57J VOLUME, AND ONLY CONNECTED DURING TESTING.
I--', EIS 3-309 t,2" 15 IVI'-/)
!17
- 118~
! 1---~ TO Fl 214 DETAIL 'B' i ~*1~1 L.:._...J9-1 3,, 9.5
,1 "
- -ZIA-IS FOR NUMBER OF HCU CONNECTED r TO EACH BRANCH SEE E-69-11 T0 3/4!"84 VALVE S-/874' [m) 1TD 83
/1--~-ttt"'
1-', ti) l2S CONTRACTORS FLOW DIAGRAM CP-001 SH 2 t
IA-V-985 * ~A *!7C A B D F L __ - - - ~ 7 VOt..UMES
!'i C~A..'T~cT ! CO,VT'RACT ~
C F 1/4" c *'--,-11 E-G '7-4 L
(50UTt-1)
~
L-----~-------------------,---~'--'-'-~-=--,-,------~~=.:.=..--__;~_ _ _ _ _ _
'-11:
1/fr'HY. IS i-CRD-103-11'&
0 thil~ I.$
___.!..~!...!.:.~---_:_----~h--4--,--~---4-Cir.tt-]
COOi.iA./¥ W"f!Z /-iOJZ ~ ~ ~ '-9-4" 58 233 -~ .. s__
_:i,,
l IVlf-4-)
231 232 ~
,t"',OM RGAt:7cR
'/2: r27 Pt</ t:7T£cT/QN s y,;n,J1 II 209) 71 173) BI..OCIC ~00 (TO\ (211) FROM REACTOR l,2" IA-I69
,..wJTHDJ..AWAL ....,. QH'I"*! PROTECTION SYS [1/(1 ) G DETAIL 'C' f SC t U + V - SOUTH FOR NO. OF HCU CONNECTED TO EACH BRANCH SEE E-69-11
(:,1 j~£D(T'!'P) CONTRACTORS FLOW DIAGRAM
+
~, .~t .~
!11<-1
.*I~
W X - NORTH G '
' IA- IA IA* IA*
CP-001 SH 2
~;-- "' II\ ~I G
}.. ";"
A4 IA-1601 578 'ST! 575 576 CAO- I 3/4"' DRAIN 27CV 3/4"JA-(244)
/-IA-/Of- ;1. *"I4-l:5 ~ ~I
.(** (208 11/2" IA-I68
. "' I12? )
,(206)
SL_Of>fl:FT I N2-51 l fa*,., (202)
CRD-CV-28CV CRO-CV-29C (N2
SL.OPE'f1FT
' ~ ~ - - - - - - - '
~ ~
CRD-V-300 CRD-V-301 CRD-V-303 CRD-V-302 CRD-CV-32CV CRO-CV-33C @1A"' . \ w u V X RD-V-320
~
CRD-V-321 CRD-V-323
~
CRD-V-322 1'12-27"'):
1 1-N,~ Jl):5'-1/.&
>12" Al*IS N2*26 NZ-29 Il2~A)
CRD-RV-22RV (SEE NOTE 16) CRD-RV-23RV CRD-PRV-33 CV35 CV33 (218) (217) CV34 CV36 Ul CRD-PRV-34 j "~") N2*22
,- l 111 CRD-V-312 CRD-V-329 !:2:::: CRD-V-313 1
- Ul CRD-V-328 HOSES FOR =r HEAo ER V-4LV£ ((YI_P._:) ~..,t.---
H CRD-CV-40CV
- z L.
- J L.
- J z 2:;
CRD-CV-41CV
_,_ ACCUMULATOR S-165 }-..,,..2 H
,;. CYt 1ND~.r:( VAtVE 11"YP)- NOTE:
CRD-V-332 CONT. ON B&R CONT. ON B&R DWG.202B ZONE E-1 CRD-V-333 #- RcllE~ VIILVE{r'r'P.)-.:. ALL ITEMS MARKED THUS 0 ARE "AS-BUILT" INTEMS AND ARE NOT SHOWN ON PIPING DWG.2028 ZONE F-5 1/2" INST. AIR DRAWINGS.
CRD-~30CV CRD-V-317 CRD-V-316 RD- -31 B CRD- -319 CRD-~34CV CRD-Qi=-35CV REVISIONS TO THIS DRAWING CRD-V-325 CRD-V-324 NITROGEN CHARGING NITROGEN CHARGING REQUIRES A REVISION TO THE AS BUILT MANIFOLD SYS. 1 B MANIFOLD SYS. 1A CORRESPONDING ISOKEY.
454003632 IIN IS STATUS: Release IIN IS 280 IN/IS STATUS DATE: 06/13/2019 NO NO IN/IS 276 DS APPROVED: NEWERNE
, 1-'-F"ICILcsl------lll tr"'---==--'..:;c.--=. FC I VER: AF REV: 63 SIZE: F 279.,.__J .- CV32A CV328 ~ 275 j .- B"HY-3 277 SIGNIFICANT NUIIIBER DRAWN DATE j
281 IIN IS IN/IS IIN IS IN/IS I GROUP
' ' 4
' ' CHEO<ED DATE BURNS & ROE "'"'
282 R OPEN TO ATMOSPHERE T
278 NO.
VERSIONS/REVISIONS BY NPPD DESCRIPTION ORDER DFT DATE ENG FLOW DIAGRAM ~
FROM OTHER HYDRAULIC CONTROL ROD UNITS FOR AD 61 DR-2013-0598 FROW VERSION AB 6030460 DJB 10 18 1 KKKUKE CONTROL ROD DRIVE APPROVED DATE
~q_ip05SEDED N
0 s _ _ _ _ _ _ _ _ _-< ~u Q CONNECTIONS TO A. AE 62 DR-2013-0598 FROW VERSION AC 6030460 PAM 10 21 1 KKKUKE SEE O 1--_:c;=c__....1...
HYDRAULIC SYSTEM -
L _ - - - - - - - - - - - - - - - - - G I V E N SCRAM VOLUME __:__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __j C AF 63 DR-2018-0001 - DJB 6 13 1 EWERN 2039 HOR., SEE CONTRACTOR FILMED FLOW DIAGRAM CP-001 SH.2 COOPER NUCLEAR STATION ~
1 2 3 4 5 6 7 8 9 10 11 12