ML21130A073
Text
Board of Directors President & Chief Executive Officer Vice President -
-1 Nuclear and Chief Nuclear Officer I
General Manager of Plant Operations I
J Director of Engineering I
Director of Nuclear Safety Assurance I
I----,
Director of Nuclear Oversight and Strategic Asset Management
- Operations
- Design Eng.
- Quality Assurance ____ _J
- Maintenance
- System Eng.
- Radiation Protection
- Eng. Programs and
- - Chemistry
- Production
- Industrial Safety
-SORC
- Nuclear Projects Components
- Reactor and Fuels Engineering
- Materials, Purchasing, Contracts Operations Organization
- Operations Manager
- Assistant Operations Manager -
Operating Shift
- Shift Managers
- Control Room Supervisors
- Operators
- Shift Technical Engineers
- Security
- Training
- Regulatory Affairs and Compliance Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)
Nuclear Power Group Management Organization Figure Xlll-2-2 11 /02/20
NPPD Site Representative Burns & Roe En ineerin Review Burrus & Roe Construction Management Project Management Reviffll Info Revi~
Manufacturers Operating De artment Approve Issue Tests PED --
Burns & Roe-Qi Coordinate GE-Site Mana er Qualit Assurance Operating De artment Operating Department Burns & Roe Engineering PE RMED ---
Project Management Bu~ & Roe Engineerin Manufacturers Burns & Roe - Con-struction Hana*lment Evaluate Data Acceptance or Re ection EVALUA'l'ED Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)
Construction Test Figure XJII-2-4 06/20/00
NPPD A,;>>iscance C.E. For NSS Sysc=
NPPO Site Re resentative llurns & Roe En 1neerin Burns, ltoe En ineerin
&R-Construction Contractor's Su ore Manufacturer
,\\s Required 0&R-Construction Mana ement C.E. On NSS S stelll5 Coordinate Burn* & Roe Engineering Pro ect Mana etnent liteview Approve lsaue Tests OEVEI:OPED Operating Fot"llard Results PE RMEO Project Management valuate Acceptance or Rejection EVALUATED Hanufaccurer Operating r
G.E.-On NSSS Aux. Interfaces C.E.* On Nuclear Manufacture Operating De artment Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)
Pre-Op and Start-Up Test Figure XIJl-2-5 06/20/00
~
'l"J~
(iq* :::!
c:::, :::! 'i5 9\\..,
~ (I)
<ll'
~ t:S ~
2~~
vi..i:i I
._ (I)
~
d
~
M
~ (j :z
(/l O "'
>O~
""l "d I>>
M M "'
..., :,:I~
-< :z "d
>e=
- z (j ~
> t"' ;:;*
t"' M "d
-< > 0
(/l :,:I ::;;
rn (/l ~
- .:;..., ~
M > -*
"d..., ~
0 0 ;*
- .:; :z -
'2
(/l >
~
0 co M
N 0
')\\...
er:
w
- 0.
~
w
~ 4 w
C:
0 u rTEST CONDITION NO:,
2A 2C 20 2E R00 PATTERN V
a*
a*
a a
i* PIJ!-1? SPEED 20*
O* "'41 1\\68 E.
,: PO'..fER 20-3011
'1.25 ~3,5 35-45* 45-.55*
,: CORE Fl,011
-w7 NC "'52
"-14*
11,19711 a Rod Pattern Obtained at Test Condition No. 2E b Rod'Pattern Obtained at Test Condition No. 3E c Rod Pattern Obtained at Test Condition No. 4E NC rtatural Circulation 2F a*
F*
"'52
'11114 V Varies
- Asterisked values are set as initial test conditions; non-asterisked values are estimates 3A b*
0*
11,33 NC
- 3C.
30 3E.
4A 4C 40 b
b b.
c*
C C
"'41 1\\68 E
0*
"'41 1\\.68 43-53* 55-65* 70-80* '1.45 50-70* 75-85*
1\\,52*
"'72*
1\\,104*
NC
'1.52*
-*,.,,70*
CONSTA~T PUM? S?EEO LINES A Nltural Circulation 4E 4F 5
C V
V E
F*
E*
95-100* 35-100* ?23*.
1\\,100*
'1.(107
.... no B 20% Pump.speed C Analytical lower limit of Ma~ter Flow Control ("'41% speed)
D Contractual lower limit of Flow Control ("'68% speed)
E 'Rnted Pump Speed (results 1n rated flow at rated power)
F Max Allowable Pump Speed (equipment limits other th~n core)