ML21130A073

From kanterella
Jump to navigation Jump to search
0 to Updated Final Safety Analysis Report,Section XIII, Figures
ML21130A073
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/21/2021
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21130A114 List: ... further results
References
NLS2021013
Download: ML21130A073 (4)


Text

Board of Directors President & Chief Executive Officer Vice President -

-1 Nuclear and Chief Nuclear Officer I

General Manager of Plant Operations I

J Director of Engineering I

Director of Nuclear Safety Assurance I

I----,

Director of Nuclear Oversight and Strategic Asset Management

- Operations

- Design Eng.

- Emergency Preparedness

- Quality Assurance ____ _J

- Maintenance

- System Eng.

- Radiation Protection

- Eng. Programs and

- - Chemistry

- Production

- Industrial Safety

-SORC

- Nuclear Projects Components

- Reactor and Fuels Engineering

- Materials, Purchasing, Contracts Operations Organization

- Operations Manager

- Assistant Operations Manager -

Operating Shift

- Shift Managers

- Control Room Supervisors

- Operators

- Shift Technical Engineers

- Security

- Training

- Regulatory Affairs and Compliance Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)

Nuclear Power Group Management Organization Figure Xlll-2-2 11 /02/20

NPPD Site Representative Burns & Roe En ineerin Review Burrus & Roe Construction Management Project Management Reviffll Info Revi~

Manufacturers Operating De artment Approve Issue Tests PED --

Burns & Roe-Qi Coordinate GE-Site Mana er Qualit Assurance Operating De artment Operating Department Burns & Roe Engineering PE RMED ---

Project Management Bu~ & Roe Engineerin Manufacturers Burns & Roe - Con-struction Hana*lment Evaluate Data Acceptance or Re ection EVALUA'l'ED Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)

Construction Test Figure XJII-2-4 06/20/00

NPPD A,;>>iscance C.E. For NSS Sysc=

NPPO Site Re resentative llurns & Roe En 1neerin Burns, ltoe En ineerin

&R-Construction Contractor's Su ore Manufacturer

,\\s Required 0&R-Construction Mana ement C.E. On NSS S stelll5 Coordinate Burn* & Roe Engineering Pro ect Mana etnent liteview Approve lsaue Tests OEVEI:OPED Operating Fot"llard Results PE RMEO Project Management valuate Acceptance or Rejection EVALUATED Hanufaccurer Operating r

G.E.-On NSSS Aux. Interfaces C.E.* On Nuclear Manufacture Operating De artment Nebraska Public Power District COOPER NUCLEAR STATION UPDATED SAFETY ANALYSIS REPORT (USAR)

Pre-Op and Start-Up Test Figure XIJl-2-5 06/20/00

~

'l"J~

(iq* :::!

c:::, :::! 'i5 9\\..,

~ (I)

<ll'

~ t:S ~

2~~

vi..i:i I

._ (I)

~

d

~

M

~ (j :z

(/l O "'

>O~

""l "d I>>

M M "'

..., :,:I~

-< :z "d

>e=

z (j ~

> t"' ;:;*

t"' M "d

-< > 0

(/l :,:I ::;;

rn (/l ~

.:;..., ~

M > -*

"d..., ~

0 0 ;*

.:; :z -

'2

(/l >

~

0 co M

N 0

')\\...

er:

w

0.

~

w

~ 4 w

C:

0 u rTEST CONDITION NO:,

2A 2C 20 2E R00 PATTERN V

a*

a*

a a

i* PIJ!-1? SPEED 20*

O* "'41 1\\68 E.

,: PO'..fER 20-3011

'1.25 ~3,5 35-45* 45-.55*

,: CORE Fl,011

-w7 NC "'52

"-14*

11,19711 a Rod Pattern Obtained at Test Condition No. 2E b Rod'Pattern Obtained at Test Condition No. 3E c Rod Pattern Obtained at Test Condition No. 4E NC rtatural Circulation 2F a*

F*

"'52

'11114 V Varies

  • Asterisked values are set as initial test conditions; non-asterisked values are estimates 3A b*

0*

11,33 NC

  • 3C.

30 3E.

4A 4C 40 b

b b.

c*

C C

"'41 1\\68 E

0*

"'41 1\\.68 43-53* 55-65* 70-80* '1.45 50-70* 75-85*

1\\,52*

"'72*

1\\,104*

NC

'1.52*

-*,.,,70*

CONSTA~T PUM? S?EEO LINES A Nltural Circulation 4E 4F 5

C V

V E

F*

E*

95-100* 35-100* ?23*.

1\\,100*

'1.(107

.... no B 20% Pump.speed C Analytical lower limit of Ma~ter Flow Control ("'41% speed)

D Contractual lower limit of Flow Control ("'68% speed)

E 'Rnted Pump Speed (results 1n rated flow at rated power)

F Max Allowable Pump Speed (equipment limits other th~n core)