ML20197J423

From kanterella
Revision as of 19:37, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments
ML20197J423
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/04/1985
From: Johnston W
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML20197E062 List:
References
FOIA-86-280 NUDOCS 8504120021
Download: ML20197J423 (2)


Text

. _ _ _ _ _ _ .

1

.N l APR 41985 Docket No: 50-354 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM: William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology .

Division of Engineering j

SUBJECT:

GDC 51 COMPLIANCE REVIEW: PUBLIC SERVICE ELECTRIC AND GAS COMPANY - HOPE CREEK UNIT 1 Plant Name: Hope Creek Generating Station, Unit 1 Suppliers: General Electric, Bechtel Licensing Stage: OL --

Docket Number: 50-354 -

Responsible Branch & Project Manager: LB#2; D. Wagner Reviewer: B. Elliot '

Requested Completion Date: Open Description of Task: SER Re GDC 51 Compliance -

Review Status: Complete Based on the connitments by the applicant in a letter dated March 12, 1985, we have completed our review of Hope Creek Generating Station's compliance with GDC 51. Our supplementary input to the Hope Creek SER Section 6.2.7

/. -

is attached.

l I

William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering

Attachment:

As Stated cc: J. P. Knight DISTRIBUTION:

H. Thompson FMB - Docket Files i

E. Sullivan MTEB Reading Files S. Pawlicki MTEB Hope Creek Files B. D. Liaw.

A. Schwencer W. Hazelton R. Klecker B. Elliot ag r

" Of[Mh k h

. W A \,IVA:

. . . . . . _ _ _ . .DE:stFV  :

OFC :

.j,p _ ": A DE:MTEB DE- -

/::

. . . . .g., q_

DE{Ap:MC(f:

ME :B. Elliot:vt: W. Hazelton: B. D. Liaw : W. Johnston:  :  ::::

uATE : 4/3/85  : 4/)/85 : 4/ 13/85 : 4/ 85 :  :  :

i CF

s ATTACHMENT SUPPLEMENTARY SAFETY EVALUATION REPORT PUBLIC SERVICE ELECTRIC AND GAS COMPANY HOPE CREEK GENERATING STATION MATERIALS APPLICATION SECTION

- MATERIALS ENGINEERING BRANCH Section 6.2.7 Fracture Prevention of Containment Pressure Boundary In our previous input to this section of the Hope Creek SER, we indicated that all ferritic components in t.he Hope Creek containment pressure boundary, except for 24 in, check valves (1F074 A and B), have sufficient fracture .,

to,ughness to meet GDC-51. To provide reasonable assurance that these .

valu'es will comply with GDC-51, we indicated that the applicant must commit to an augmented ISI program. The SER indicated that the oute,r and inner

- valve body surface must be inspected at the first refueling outage and at C_;., other times when the valve is disassembled for maintenance. The applicant

! in a letter dated March 12, 1985 indicates that the inspection program will be implemented at the first refueling' outage and will include inspection of the entire surface of the valve bodies, both internal and external, by' surface or other examinations acceptable to the staff. A more detailed program would.

be p.rovided when the licensee submits its ISI Program for Hope Creek, which is scheduled for submittal for staff review six months after commercial operation. Based on these commitments ,we have concluded that there is reasonable assurance these valves will comply with the requirements of GDC 51.

e d

e