MONTHYEARML17284A8931999-10-0606 October 1999 Informs of Completion of Review of NRC Augmented Insp at WNP-2 (NRC Insp Rept 50-397/98-16) & Current WNP-2 Emergency Classification Procedures.Concluded That Sufficient Guidance in Place to Ensure Appropriate Emergency Classification ML17284A8781999-08-31031 August 1999 Notification of 990920 Meeting with Util in Rockville,Md to Discuss Energy Northwest Plans for General License to Store Spent Fuel at Onsite Independent Spent Fuel Storage Installation ML18066A6211999-08-17017 August 1999 Notification of 990913-14 Meeting with Util in Kansas City, Mo Re NRC & USA Joint Sponsorship of Licensing Workshop with Goals of Improving Quality of Licensing Submittals & Improving Licensing Interface Between Licensees & NRC ML16342A8471999-06-29029 June 1999 Notification of 990720 & 21 Meetings with Utils in Arlington,Tx to Discuss risk-informed Initiatives & Topics of Interest ML17292B6721999-05-26026 May 1999 Informs That Encl Questions Were Transmitted by Fax to Arbuckle of WNP-2,in Preparation for Upcoming Telephone Call ML17292B6711999-05-24024 May 1999 Forwards Questions Transmitted by Fax on 990506 to Arbuckle of WNP-2 to Prepare Util for Upcoming Telephone Call Re Licensee Amend Request for Change in Minimum Critical Power Ratio Safety Limits ML17292B6631999-05-13013 May 1999 Forwards Request for Addl Info Re Questions on Secondary Containment & Standby Gas Treatment Sys ML20196J5191999-05-12012 May 1999 Responds to 980828 Memo Requesting Assistance Re Tornado Missile Protection for turbine-driven Emergency Feedwater Pump Vent Stack & Steam Supply Piping at Waterford Steam Electric Station,Unit 3 ML17292B6411999-04-19019 April 1999 Forwards Questions Re Licensee Response to GL 88-20 on IPEEE to Prepare for Upcoming Telcon.Questions Transmitted by 990419 Fax to P Inserra of WPPSS ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 IR 05000397/19993011999-04-14014 April 1999 Forwards NRC Operator Licensing Exam Rept 50-397/99-301 (Including Completed & Graded Tests) for Tests Administered on 990308-11 at Washington Public Power Supply System Unit 1 ML17292B5841999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990401 to Discuss Results of Plant Performance Review 99-01 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML17292B5551999-02-0808 February 1999 Notification of Significant Licensee Meeting with Util on 990318 to Discuss Results of PPR 99-01 ML17284A8131998-11-20020 November 1998 Notification of 981209 Meeting with Util to Discuss Results of Corrective Actions Taken in Response to Operational Self- Assessment & Engineering Performance ML17284A7801998-10-0808 October 1998 Informs That TAC MA2508 Opened to Address Effort to Support Request for Enforcement Discretion Related to Testing of Diesel at Plant.Turned Out Neod Not Needed.Tac Officially Closed Out ML17284A7501998-09-0404 September 1998 Provides Documents Re Previous Oversight Panel to Docket File for WNP-2 & Pdr,As Described in to Wpss. Documents Attached ML17284A7401998-08-28028 August 1998 Informs That on 980807 Technical & Project Staff Supported Teleconferences W/Licensee Re Need for Testing of One of EDG Following Repairs That Had Been Done to Address Voltage Regulation Problem ML17284A6711998-06-30030 June 1998 Notification of Significant Licensee Meeting W/Util on 980708 Re Exit Meeting for Augmented Inspection Team Insp Associated w/980617,fire Main Break & ECCS Pump Room Flooding ML17284A6701998-06-30030 June 1998 Revised Notification of Meeting on 980702 W/Wppss in Arlington,Texas to Discuss Plant Restart Following 980617, Fire Main Break & ECCS Pump Room Flooding.Date & Time Changed from 980701 & List of Meeting Attendees Revised ML17284A6691998-06-26026 June 1998 Notification of 980701 Meeting W/Facility in Arlington,Tx to Discuss Plant Restart Following 980617,fire Main Break & ECCS Pump Room Flooding ML17284A6681998-06-25025 June 1998 Revised Notification of Predecisional Enforcement Conference on 980713 in Arlington,Texas to Discuss Apparent Implementation of Inappropriate License Limits for Min Critical Power Ratio ML16342E1431998-06-22022 June 1998 Notification of 980722-24 Meeting W/Utils in Arlington,Texas to Conduct Examination Writing Workshop ML17292B4151998-06-19019 June 1998 Discusses Unusual Event on 980617,in Response to Extensive Flooding of 2 ECCS Pump Rooms in Reactor Bldg from Failed Fire Main Valve.J Shackelford Appointed as Leader of Ait. Sequence of Events Timeline Listed ML17284A6461998-06-0303 June 1998 Notification of 980625 Predecisional Enforcement Conference W/Licensee to Discuss Apparent Implementation of Inappropriate License Limits for MCPR ML17292B3391998-04-16016 April 1998 Notification of Significant Licensee Meeting W/Util on 980430 to Discuss Licensee self-assessment Program (Including Discussion of 980311 Reactor Scram) ML17292B2941998-03-26026 March 1998 Notification of 980408 Meeting W/Util in Richland,Wa Re NRC Special Insp Exit Meeting for MSIV Closure of 980311 ML17292B2901998-03-20020 March 1998 Notification of 980330 Meeting W/Util to Discuss Status of FSAR Upgrade Program for WNP-2 ML17292B0941997-10-23023 October 1997 Notification of Licensee Meeting W/Util on 971106 in Richland,Wa Re WNP-2 Oversight Panel Meeting ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML17292B0711997-10-0101 October 1997 Notification of 971014 Meeting W/Washington Public Power Supply System in Rockville,Md to Discuss Licensee & NRC Progress in Improving Communications Following 970731, Region IV Meeting on Communications ML17292B0691997-10-0101 October 1997 Notification of 971014 Meeting W/Washington Public Power Supply System in Rockville,Md to Discuss Licensee Dry Cask Storage Program ML17292B0371997-08-27027 August 1997 Notification of Significant Licensee Meeting W/Util on 970912 in Arlington,Tx to Discuss QA Program Overview & Introduction of QA Manager ML17292A9831997-08-20020 August 1997 Notification of 970827 Meeting W/Wpps in Rockville,Md to Discuss Licensee FSAR Upgrade Program & Review Status of Active Licensing Actions ML17292A9491997-07-29029 July 1997 Revised Notification of 970731 Meeting W/Wppss in Arlington, Tx Re Regulatory Interface Workshop-Discussion of Common Themes & Case Study (Reactor Feedwater Pump Trip Test) ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML17292A9051997-06-18018 June 1997 Notification of 970623 Meeting W/Washington Public Power Supply Sys in Rockville,Md to Discuss Addl Info Provided by Licensee to Support 970520 Minimum Critical Power Ratio License Amend TS Change Request ML16342D6551997-05-16016 May 1997 Notification of Licensee Meeting W/Util on 970529-30 to Conduct Workshop on Test Item & Exam Development to Meet Agency Expectations of Facility licensee-developed Initial Licensing Exam.Proposed Agenda Encl ML17292A8611997-05-0909 May 1997 Notification of Significant Licensee Meeting W/Util on 970530 to Discuss Reactor Scram from Loss of Feedwater Pump Test & Nuclear Safety Issues Program ML17292A8181997-04-22022 April 1997 Notification of 970429 Meeting W/Util in Rockville,Md to Discuss Licensee Plans & Schedule for Resolution of Thermo- Lag Issue at Plant ML17292A7501997-03-27027 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Licensees FSAR Upgrade Program ML17292A7551997-03-27027 March 1997 Notification of Significant Licensee Meeting W/Util on 970422 in Richland,Wa to Discuss SALP Rept ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML16343A6961997-02-18018 February 1997 Notification of Licensee Meeting W/Util on 970225 in Arlington,Tx to Discuss Results of Region IV Util Group Review of NRC Enforcement Policy & Nonescalated Enforcement Process ML16343A4771997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for TI2515/120 Insp to Be Performed ML17292A6741997-02-0303 February 1997 Notification of 970220 Meeting W/Util in Richland,Wa to Discuss Plant Performance W/Nrc Oversignt Panel ML17284A7631997-01-31031 January 1997 Informs of Temporary Delegation of Duties as Chairman of WNP-2 Oversight Panel to K Perkins ML17334A2101997-01-31031 January 1997 Forwards Response to TIA 96-005 Re Seismic Qualification Requirements for Plant Rcics ML17292A6651997-01-27027 January 1997 Notification of 970206 Licensee Meeting W/Util in Richland, Wa to Discuss Exit Meeting Re NRC Insp Rept 96-201 1999-08-31
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML17284A8931999-10-0606 October 1999 Informs of Completion of Review of NRC Augmented Insp at WNP-2 (NRC Insp Rept 50-397/98-16) & Current WNP-2 Emergency Classification Procedures.Concluded That Sufficient Guidance in Place to Ensure Appropriate Emergency Classification ML17284A8781999-08-31031 August 1999 Notification of 990920 Meeting with Util in Rockville,Md to Discuss Energy Northwest Plans for General License to Store Spent Fuel at Onsite Independent Spent Fuel Storage Installation ML18066A6211999-08-17017 August 1999 Notification of 990913-14 Meeting with Util in Kansas City, Mo Re NRC & USA Joint Sponsorship of Licensing Workshop with Goals of Improving Quality of Licensing Submittals & Improving Licensing Interface Between Licensees & NRC ML16342A8471999-06-29029 June 1999 Notification of 990720 & 21 Meetings with Utils in Arlington,Tx to Discuss risk-informed Initiatives & Topics of Interest ML17292B6721999-05-26026 May 1999 Informs That Encl Questions Were Transmitted by Fax to Arbuckle of WNP-2,in Preparation for Upcoming Telephone Call ML17292B6711999-05-24024 May 1999 Forwards Questions Transmitted by Fax on 990506 to Arbuckle of WNP-2 to Prepare Util for Upcoming Telephone Call Re Licensee Amend Request for Change in Minimum Critical Power Ratio Safety Limits ML17292B6631999-05-13013 May 1999 Forwards Request for Addl Info Re Questions on Secondary Containment & Standby Gas Treatment Sys ML20196J5191999-05-12012 May 1999 Responds to 980828 Memo Requesting Assistance Re Tornado Missile Protection for turbine-driven Emergency Feedwater Pump Vent Stack & Steam Supply Piping at Waterford Steam Electric Station,Unit 3 ML17292B6411999-04-19019 April 1999 Forwards Questions Re Licensee Response to GL 88-20 on IPEEE to Prepare for Upcoming Telcon.Questions Transmitted by 990419 Fax to P Inserra of WPPSS ML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 IR 05000397/19993011999-04-14014 April 1999 Forwards NRC Operator Licensing Exam Rept 50-397/99-301 (Including Completed & Graded Tests) for Tests Administered on 990308-11 at Washington Public Power Supply System Unit 1 ML17292B5841999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990401 to Discuss Results of Plant Performance Review 99-01 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML17292B5551999-02-0808 February 1999 Notification of Significant Licensee Meeting with Util on 990318 to Discuss Results of PPR 99-01 ML17284A8131998-11-20020 November 1998 Notification of 981209 Meeting with Util to Discuss Results of Corrective Actions Taken in Response to Operational Self- Assessment & Engineering Performance ML17284A7801998-10-0808 October 1998 Informs That TAC MA2508 Opened to Address Effort to Support Request for Enforcement Discretion Related to Testing of Diesel at Plant.Turned Out Neod Not Needed.Tac Officially Closed Out ML17284A7501998-09-0404 September 1998 Provides Documents Re Previous Oversight Panel to Docket File for WNP-2 & Pdr,As Described in to Wpss. Documents Attached ML17284A7401998-08-28028 August 1998 Informs That on 980807 Technical & Project Staff Supported Teleconferences W/Licensee Re Need for Testing of One of EDG Following Repairs That Had Been Done to Address Voltage Regulation Problem ML17284A6711998-06-30030 June 1998 Notification of Significant Licensee Meeting W/Util on 980708 Re Exit Meeting for Augmented Inspection Team Insp Associated w/980617,fire Main Break & ECCS Pump Room Flooding ML17284A6701998-06-30030 June 1998 Revised Notification of Meeting on 980702 W/Wppss in Arlington,Texas to Discuss Plant Restart Following 980617, Fire Main Break & ECCS Pump Room Flooding.Date & Time Changed from 980701 & List of Meeting Attendees Revised ML17284A6691998-06-26026 June 1998 Notification of 980701 Meeting W/Facility in Arlington,Tx to Discuss Plant Restart Following 980617,fire Main Break & ECCS Pump Room Flooding ML17284A6681998-06-25025 June 1998 Revised Notification of Predecisional Enforcement Conference on 980713 in Arlington,Texas to Discuss Apparent Implementation of Inappropriate License Limits for Min Critical Power Ratio ML16342E1431998-06-22022 June 1998 Notification of 980722-24 Meeting W/Utils in Arlington,Texas to Conduct Examination Writing Workshop ML17292B4151998-06-19019 June 1998 Discusses Unusual Event on 980617,in Response to Extensive Flooding of 2 ECCS Pump Rooms in Reactor Bldg from Failed Fire Main Valve.J Shackelford Appointed as Leader of Ait. Sequence of Events Timeline Listed ML17284A6461998-06-0303 June 1998 Notification of 980625 Predecisional Enforcement Conference W/Licensee to Discuss Apparent Implementation of Inappropriate License Limits for MCPR ML17292B3391998-04-16016 April 1998 Notification of Significant Licensee Meeting W/Util on 980430 to Discuss Licensee self-assessment Program (Including Discussion of 980311 Reactor Scram) ML17292B2941998-03-26026 March 1998 Notification of 980408 Meeting W/Util in Richland,Wa Re NRC Special Insp Exit Meeting for MSIV Closure of 980311 ML17292B2901998-03-20020 March 1998 Notification of 980330 Meeting W/Util to Discuss Status of FSAR Upgrade Program for WNP-2 ML17292B0941997-10-23023 October 1997 Notification of Licensee Meeting W/Util on 971106 in Richland,Wa Re WNP-2 Oversight Panel Meeting ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML17292B0711997-10-0101 October 1997 Notification of 971014 Meeting W/Washington Public Power Supply System in Rockville,Md to Discuss Licensee & NRC Progress in Improving Communications Following 970731, Region IV Meeting on Communications ML17292B0691997-10-0101 October 1997 Notification of 971014 Meeting W/Washington Public Power Supply System in Rockville,Md to Discuss Licensee Dry Cask Storage Program ML17292B0371997-08-27027 August 1997 Notification of Significant Licensee Meeting W/Util on 970912 in Arlington,Tx to Discuss QA Program Overview & Introduction of QA Manager ML17292A9831997-08-20020 August 1997 Notification of 970827 Meeting W/Wpps in Rockville,Md to Discuss Licensee FSAR Upgrade Program & Review Status of Active Licensing Actions ML17292A9491997-07-29029 July 1997 Revised Notification of 970731 Meeting W/Wppss in Arlington, Tx Re Regulatory Interface Workshop-Discussion of Common Themes & Case Study (Reactor Feedwater Pump Trip Test) ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML17292A9051997-06-18018 June 1997 Notification of 970623 Meeting W/Washington Public Power Supply Sys in Rockville,Md to Discuss Addl Info Provided by Licensee to Support 970520 Minimum Critical Power Ratio License Amend TS Change Request ML16342D6551997-05-16016 May 1997 Notification of Licensee Meeting W/Util on 970529-30 to Conduct Workshop on Test Item & Exam Development to Meet Agency Expectations of Facility licensee-developed Initial Licensing Exam.Proposed Agenda Encl ML17292A8611997-05-0909 May 1997 Notification of Significant Licensee Meeting W/Util on 970530 to Discuss Reactor Scram from Loss of Feedwater Pump Test & Nuclear Safety Issues Program ML17292A8181997-04-22022 April 1997 Notification of 970429 Meeting W/Util in Rockville,Md to Discuss Licensee Plans & Schedule for Resolution of Thermo- Lag Issue at Plant ML17292A7501997-03-27027 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Licensees FSAR Upgrade Program ML17292A7551997-03-27027 March 1997 Notification of Significant Licensee Meeting W/Util on 970422 in Richland,Wa to Discuss SALP Rept ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML16343A6961997-02-18018 February 1997 Notification of Licensee Meeting W/Util on 970225 in Arlington,Tx to Discuss Results of Region IV Util Group Review of NRC Enforcement Policy & Nonescalated Enforcement Process ML16343A4771997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for TI2515/120 Insp to Be Performed ML17292A6741997-02-0303 February 1997 Notification of 970220 Meeting W/Util in Richland,Wa to Discuss Plant Performance W/Nrc Oversignt Panel ML17284A7631997-01-31031 January 1997 Informs of Temporary Delegation of Duties as Chairman of WNP-2 Oversight Panel to K Perkins ML17334A2101997-01-31031 January 1997 Forwards Response to TIA 96-005 Re Seismic Qualification Requirements for Plant Rcics ML17292A6651997-01-27027 January 1997 Notification of 970206 Licensee Meeting W/Util in Richland, Wa to Discuss Exit Meeting Re NRC Insp Rept 96-201 1999-08-31
[Table view] |
Text
- -
, j .J/ df liEliORAllDUI: FOR: Gregory li. Cook DISTRIBUTICL Public Affairs Officer Region V M
Lbeu heacing PRC Syster.
FR0h: balter F,. Lutler, Chief JBradfute Licensing Branch f.c. 2 EHylton Division of Licensing SUCCEll: FR0 POSED PUBLIC 110TICE Enciosed is e proposeo public nutice relating to an appliceticr for an arier.Cr:er.t to the operating license for the 1tshington huclear Project f.c. I.
~
dated liarch 13, 19E5.
Because of cr.igent circumstances, time does not allcr for normal publication ir the Federal Register.
It is requested ti.ct this announcement be released as sect, ds pcssible to the n.edia in the area of the facility and thEt & copy be sent to the State official ano licer. ice.
M 1081 8 slened by:
Falter R. Butler, Chief Licensing branch flo. 2 Division of Licensing Enclcsure :
Press releaase ccieneiosure FIngrara Tl;liovak JBradfutt HThcrpscr.
Paton, OELD EHylton LUp2/D.L/LA Qh LBe2/DL/Pli LB#2/DL/BC fk OELD O .
E!!biton JBradfute:lb !! Butler Pator, CC/.'j/b5 06//f/85 06/g85 06/;,4/85 l
es07o2o275 eso614 XR EF A>
i l we -
ADOCK 0500 { , 7 7
l / UNITED STATES
/- ~% NUCLEAR REGULATORY COMMISSION
,i wassinoTon. o. c. 20sss
$,,,..* JUN 171985 MEh0RANDUM FOR: Gregory N. Cook Public Affairs Officer Region V FROM: Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
SUBJECT:
PROPOSED PUBLIC NOTICE Enclosed is a proposed public notice relating to an application for an amendment to the operating license for the Washington Nuclear Project No. 2 dated March 13, 1985.
Because of exigent circumstances, time does not allow for normal publication in the Federal Register.
It is requested that this announcement be released as soon as possible to the media in the area of the facility and that a copy be sent to the State official and licensee.
Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
Press releaase l cc/ enclosure FIngram TMNovak s JBradfute HThompson Paton, OELD EHylton
PUBLIC fiCTICE NRC STAFF PROPOSES TO AltEllD OPERATiliG L?. CENSE AT WPPSS - UllP-2 The Nuclear Regulatory Commission staff has received an application dated March 13, 1985 from WPPSS for an amendment to the operating license for the WNP-2 located in Benton County, near Richland, Washington.
If approved, the amendment would amend the WNP-2 Technical Specifications by changing the trip setpoints and allowable values for some of the Isolation Actuation Instrumentation in portions of the Reactor Building. In addition the amendment, if approved, will change the delta temperature - high signal to a temperature - high signal for isolation actuation f rom the RHP, Heat Exchanger Area and correct an inconsistency in the quality assurance record retention requirements. The Supply System has requested HRC action on its request by June 20, 1985.
Following an initial review of this application, the staff has made a proposed (preliminary) determination that the requested amendment involves no significant hazards consideration. Under NRC regulations, this means that the proposed amendment does not involve a significant increase in the probability or consequences of an accident, would not create the possibility of a new or
- different kind of accident, or involve a significant reduction in a safety margin.
The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not:
- 1) Involve a significant increase in'the probability or consequences l
l of an accident previously evaluated because the updited temperature 1
setpoints are based on new analyses that include the effect of actual plant operating temperatures. The new values use the sane l
l
., ~
leakage criteria, and do not alter the valve closure times, so accident consequences are not increased; or
- 2) Create the possibility of a new or different kind of accident than previously evaluated because this change introduces no new accident types nor changes any criteria; or
- 3) Involve a significant reduction in a margin of safety because the same criteria for allowable leakage prior to high temperature trip has been used, so the margin of safety has been maintained.
Th e Connaission has determined that due to exigent circumstances, there is no time to publish for public conrnent before issuance of its usual notice in the Federal Register of the proposed action. The exigent circumstances result from the fact that,' while this amendment request was published in the Federal Register on June 4, 1985, insufficient time exists prior to startup to process the amendment in accordance with the normal procedures contemplated by 10 CFR 50.91(a)(2). Accordingly, the Supply System has requested that this amendment be processed on an exigent basis as contemplated in 10 CFR 50.91(a)(6).
i If the proposed determination becomes final, the staff will issue the amendment without first offering an opportunity for a public hearing. An opportunity for a hearing will be published in the Federal Register at a later l
! date and any hearing request will not delay the effective date of the amendment.
If the staff decides in its final determination that the amendment does involve a significant hazards consideration, a notice of opportunity for a prior hearing will be published in the Federal Register and, if a hearing is l
granted, it will be held beforc the amendment is issued.
p_ . . ;
Comments on the proposed determination nay be telephoned to Walter R. Butler, Chief of Licensing Branch No. 2, by collect call to (301) 492-7435. All comments received by June 19, 1985 will be considered in reaching a final determination.
A copy of the application may be examined at the NRC's local Public Document Room located at the Richland Public Library, Swift and Northgate Streets, Richland, Washington 99352, and at the Commission's Public Document Room, 1717 H. Street, N.W., Washington, D.C. 20555.
s f
. ~
.!UN 171935 V
MEMORANDUM FOR: Thomas M. Novak',. Assistant Director for Licensing, DL FROM: R. Wayne Houston, Assistant Director for Reactor Safety, DSI
SUBJECT:
OR ACTION: WNP-2 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR DRYWELL AVERAGE TEMPERATURE (TAC # 57547)
Plant Name: Washington Public Power Supply System (WNP-2)
Docket No.: 50-397 Region: V ,
Responsible Branch: LB#2 Project Manager: J. Bradfute Due Date: June 19, 1985 Review Status: Complete By a letter dated April 19, 1985, the Washington Public Power Supply System proposed certain changes to section 4.6.1.7 of the Technical Specifications for WNP-2.
The proposed changes were necessitated due to a design change of the drywell cooling system (a non-safety system) that was implemented during the last outage. This change provided an improved air flow pattern resulting in reduced temperature gradients in the drywell.
Specifically, the licensee requested a change to Surveillance Requirement 4.6.1.7 which identified the thermocouple locations used to determine the drywell average air temperature.
The proposed TS change in Surveillance Requirement 4.6.1.7 changes the elevation and azimuth location of the thermocouples as originally specified to inlet locations of the air coolers.
To improve the temperature profile in the drywell, the licensee modified the air flow patterns of the drywell unit coolers. This was accomplished by ducting the hot air in the annulus region, between the reactor pressure vessel and the sacrificial shield wall, through the unit coolers located in the lower portion of the drywell, rather than the upper portion in the original design.
Had the licensee used the same thermocouples specified in Surveillance Requirement 4.6.1.7, the resulting drywell average temperature would be greater than the expected drywell average temperature due to the impingement of the annulus hot air on the thermocouples.
CONTACT: F. Eltawila, CSB:DSI X29488
'? h 35k"IS8bk55S$b597 p PDR I
l
Thomas M. Novak Therefore, the licensee proposed thermocouple locations at the inlet of the unit coolers where the inlet air temperature would be more representative for determining the drywell average temperature. The licensee indicated that the temperature readings from the new thermocouple locations are neither influenced by the annulus hot air or the drywell unit cooler discharged air and, therefore, will yield more correct values for computing the bulk average drywell air temperature.
Based on our assessment of tne proposed technical specification change, we recommend its approval since the original intent of the LCO is being maintained.
Enclosed is our SALP input for this review.
Original eig.ciby B. Eeyes n oar.. a R. Wayne Houston, Assistant Director for Reactor Safety, DSI
Enclosure:
As Stated cc: R. Bernero H. Thompson W. Butler J. Bradfute CSB R/F FEltawila AD/RS/RF DSI:CSB V FEltawfi DSI JKudnj b DSI: CSB.-
RWHouston 06/ l1 /85 06/jeg/85 06/ - /85 0FFICIAL RECORD COPY
1
. , ' ;l ,
tl p i na er ve ev .
l e es .
r d .
ee h r ti u
f q oe r
t
' ss oi mh T
s k
c .
aw l e i
, v .
een s
uro i sht i ga um h sor c i ro n n h of a o th n ti r i t g B p nay s i i r m r dt a rcs e c aus t s gd e s e enc y D roe S cn e
2 t v l aoe n i t tth E e t t R m a id U P n r men S L i r bdi O A a a uea L S t 2 N set C n - nb H o P e o E C N en e W soo nit h et;
. t cart y
i l rc mo b oe
- efl .
d h ne e tit r
a p
e i r
P y
r o
g e 3 t
a C
t n a n o i e i y
r m t s r ,
e e ue ,
t v l u o s i l os t s
t n
r o ss C v eI s i e n R s l l v n I l e E o oa n t n e i t t c e
' t n i v e l a e hn i m b g g u m ch s e a n n i
ei ac n c t
i i l
t i t I -
1 p Docket llo. 50-397 6; liEh0kAkDUM FOR: Walter R. Butier Chicf Licensing Branch Fc. 7 Division of Licensing FR0ll: John 0. Bredfute, Project Manager Licensing Branch lio. i, Division of Licensing SUCJECT: IllFORMATION f1EETIfiG !!ITH THE SUPPLY SYSTEM (WNP-2)
FORTHCCliIf;G REFUELIfiG DATE & TIME: Thursday, June 27, ISES 1:00 p.n..
LOCATI0li: Air Richts Building Room 5033 Bethesda , I'.crylanc FURPOSE: To identify end clarify Preliminary requirenents for the first refueling of WhP-2.
PARTICIPAf:TS*: flRC ifNP-2 EXX0ft k'. Mcdges '.J Aeschliman J. Morgan L. Phillips D. Larkin R. Collinghani R. Lobel 11. Wolkenhauer; D. Freno W. Brccks H. Richings G. Schwenk
- 11. Cwpagnone J. Bradfute John O. Bradfute, Prcject flanager Licensing Branch tio. 2 Division of Licensing cc: See next page
- fieetings between !!RC technical staff and applicants for licenses are open for interested members of the rutlic, petitioners, intervenors, or other parties to attu% as cbservers pursuant to "Open f:cctire Statement of flRC Staff Policy",
43 F M 31,Rpcister 28058, 6/26/~ib.
L 6C JLradfute:1b 1] g
(;[jyp jp"c V6/26/85 9""^^2i 95^5" 4 PDR P
ADOCK 05000397 #
)h PDR l i
_ ~ _ . .
> lir. G. C. Sorenser., hanager hPPSS Nuclear Protect t'c.. ?
Washington Pubi.ic Pcutr Supply System (WNP-2) cc:
Nicholas Reyrcld. Escuire Regional Administrator, hegion V Lishcp, Cook, Liberman, U.S. Nucleer Ecgulatory Commission Forcell & Reynolds 1450 Ueria Lcr.e, Suite 210
]?00 Seycnteenth Street,fl. b. balnut Lrtel, California 94596 Washington, D. C. 20036 l'.r. G. E. Lcupe, Esquire Washingten Public Powc r Supply Systen P. O. Box 968 3000 George Washington Way Richland, Vashington 99532 Mr. Curtis Eschel' , Chairman Energy Facility Site Evaluaticn Council Mail Stop PY-11 Olympia, Washingtcr. 50004 P. L. Powell, Licensino Manager '
Washington Fublic Fewer Supply System P. O. Box 960,f.D 9562 lhchland, Washington 99352 hr. k. b. Conn Burns ar.d Roe, Incorporated c/o Washington Public Power Suppiy Systen P. O. Box 968, lid 994E Richland, Washincter. 9035:
R. B. Glasscock, Lirector Licersir.g ario Assurance Washington Public Power Supply System P. O. Box 968, MD 260 Richland, Ueshington 99352 lir. C.11. Powers i WhF-2 Flant Manager Washington Public Pev.er Supply System P. O. Ucy.l.D 5'Z7h Richland, Washington 993L2 l
- - - - r - - - -_- . - - -m
c Meeting Notices Internal NRC Participants Docket File W. Hoages NRC PDR L. Phillips Local PDR R. Lobel PRC System D. Freno NSIC W. Brooks LB#2 Reading H. Richings HDenton/DEisenhut G. Schwenk HThompson/FMiraglia M. Campagnone TNovak J. Bradfute BYoungblood WButler GKnighton EAdensam JZwolinski -
CGrimes bec: Applicant & Service List GHolahan CThomas Glainas SVarga DVassallo JMiller JStolz JKnight, Acting Dir., DE WJohnston RBosnak, Acting, AD/CSE, DE RBernero LRubenstein l WHouston l DMuller l TSpeis FSchroeder FRowsome l
TWRussell, Acting Dir., DHFS ACRS-16 OELD, Attorney Paton
- JPartlow '
l ~
BGrimes EJordan FIngram, PA Receptionist (Only if meeting is held in Bethesda) l Project Manager a. Readfut.
E. Hylton Region 5 9
l
p * * * %,
[\ i, , < s' 's NUCLE AR REGULATORY COMMISSION
- p ' p ..., / j WASHINGTON O C. 20555 [
. .[',
JWi. 3 1985 d b4M Docket No. 50-400 & MTC MEMORANDUM FOR: George W. Knighton, Chief Licensing Branch No. 3 w aw. I Division of Licensing FROM: B. C. Buckley, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
NOTICE OF MEETING WITH CAROLINA POWER & LIGHT (CP&L) COMPANY IN REGARD TO SHEAR 0N HARRIS, UNIT I DATE & TIME: July , 1985 10:00 am LOCATION: Phillips Building Room P.-iWMP P -1IO Bethesda, Maryland PURPOSE: To discuss superheat consideration during postulated main-steam line break. There will also be a discussion of CPL's response to NRC questions 410.28 and 410.50 which addresses associated circuits and electrical isolation in transfer switches from a fire protection perspective (The discussion on questions 410.28 and 410.50 will be held in room P-204A, Phillips Building at 11:00 am.)
PARTICIPANTS: NRC G. Knighton, J. Knight, O. Parr, B. Buckley, 0. Chopra CP&L EBASCO A. Cutter, S. Zimmerman, D. McCarthy V. Cornell, et al.
b b bab 9 B. C. Buckley, Project Manager Licensing Branch No. 3 Division of Licensing cc: See next page _
NOTE: NRC meetings are open to be observed by the public. Anyone who wishes to attend must contact B. C. Buckley on (301)492-28379 before July 11, 1985.
? i.
9507210000 050700 - %M s
PDR ADOCK 05000400 Q A PDR
Mr. E. E. Utley Caroline Power & Light Company Shearon Harris cc:
George F. Trowbridge, Esq. Mr. George Jackson, Secretary Shaw, Pittman, Potts & Trowbridge Environmental Law Project 1800 M Street, NW School of Law, 064-A Washington, DC 20036 Univeristy of North Carolina Chapel Hill, North Carolina 27514 Richard E. Jones, Esq.
Associate General Counsel Mr. Travis Payne, Esq.
Carolina Power & Light Company 723 W. Johnson Street 411 Fayetteville Street Mall Post Office Box 12643 Raleigh, North Carolina 27602 Raleigh, North Carolina 27605 M. David Gordon, Esq. Mr. Daniel F. Read Associate Attorney General CHANGE State of North Carolina Post Office Box 2151 Post Office Box 629 Raleigh, North Carolina 27602 Raleigh, North Carolina 27602 Bradley W. Jones, Esq.
Thomas S. Erwin, Esq. U.S. Nuclear Regulatory Comm, 115 W. Morgan Street Region II Raleigh, North Carolina 27602 101 Marietta Street Atlanta, Georgia 30303 Resident Inspector / Harris NPS .
Richard D. Wilson, M. D.
c/o U.S. Nuclear Regulatory Commission 725 Hunter Street Route 1, Box 315B Apex, North Carolina 27502 New Hill, North Carolina 27562 Regional Administrator, Region II Charles D. Barham, Jr. , Esq. U.S. Nuclear Regulatory Commission Vice President & Senior Counsel 101 Marietta Street Carolina Power & Light Company Suite 2900 Post Office Box 1551 Atlanta, Georgia 30303 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Mr. John Runkle, Executive Coordinator Executive Director Conservation Council of North Carolina Public Staff - NCUC 307 Granville Road Post Office Box 991 Chapel Mill, North Carolina 27514 Raleigh, North Carolina 27602 Mr. Wells Eddleman 718-A Iredell Street Durham, North Carolina 27705
MEETING NOTICE DISTRIBUTION:
d[ NRC PARTICIPANTS NRC PDR al MR G. Knighton J. Knight NSIC 0. Parr PRC System B. Buckley LB3 Reading 0. Chopra H. Denton/D. Eisenhut H. Thompson /F. Miraglia T. Novak J. Ycungblood W. Butler E. Adensam M. Virgilio D. Crutchfield C. Grimes ,
G. Holahan C. Thomas G. Lainas S. Varga D. Vassalb J. Miller J. Stolz F. Rowsome W. Johnston J. P. Knight, Acting Dir., DE R. Bernero R. Bonsak, Acting, AD/CSE, DE L. Rubenstein W. Houstor.
D. Muller T. Speis F. Schroeder W. T. Russell, Acting Dir., DHFS ACRS (16)
Attorney, OELD J. Partlow B. Grimes E. L. Jordan F. Ingram, PA Receptionist (Only if meeting is held in Bethesda)
Project Manager B. Bucklev J. Lee
! bec: Applicant & Service List