ML17292A949

From kanterella
Jump to navigation Jump to search
Revised Notification of 970731 Meeting W/Wppss in Arlington, Tx Re Regulatory Interface Workshop-Discussion of Common Themes & Case Study (Reactor Feedwater Pump Trip Test)
ML17292A949
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/29/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9707310258
Download: ML17292A949 (9)


Text

pR PK<< ~il~

REVISED REVISED uNITED STATEs NUCLEAR REGULATORY COMMISSION REG)ON IV 011 RYAN >LAZA DRIVE SUITE 400 AR L 1 VG TO'V T E X AS 7~01 1-8064 JUL 29 l997 REVISED REVISED REVISED REVISED REVISED Revised for changes to the purpose of the meeting.

There is also an additional licensee attendee.

Name of Licensee:

Name of Facility:

Docket:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

NOTICE OF LICENSEE MEETING Washington Public Power Supply System Washington Nuclear Plant 2 50-397 July 31, 1997 1 p.m. - 5 p.m.

NRC Region IV, Training Conference Room Arlington, Texas Regulatory Interface Workshop - Discussion of Common Themes and Case Study (Reactor Feedwater Pump Trip Test)

E. W. Merschoff, Regional Administrator R. P. Zimmerman, Associate Director for Projects, Office of Nuclear Reactor Regulation (NRR)

J. E. Dyer, Deputy Regional Administrator J. W. Roe, Director, Division of Reactor Projects III/IV,NRR T. P. Gwynn, Director, Division of Reactor Projects (DRP)

W. H. Bateman, Director, Project Directorate IV-2, NRR A. T. Howell, Director, Division of Reactor Safety H. J. Wong, Chief, Reactor Project Branch E, DRP T. G. Colburn, Project Manager, NRR G. D. Replogle, Resident Inspector, DRP Licensee Attendees:

J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President for Nuclear Operations R. L. Webring, Vice President for Operations Support J. H. Swailes, General Engineering Manager D. A. Swank, Manager, Regulatory Affairs P. J. Inserra, Manager, Licensing P. Berghausen, Consultant 97073i0258 970729 PDR ADQCK 05000397 P

PDR

Washington Public Power Supply System NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify H. J. Wong at (510) 975-0296 by COB on July 25, 1997.

Approv

)vision of React P o)ec s Thomas P. Gwyn, Di ect r

D CC:

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-31 72 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Washington Public Power Supply System Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

Winston 5. Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System Jtj 29 1997 E-Mail To:

FOR

(

)

PMNS JKR PAB FJM TTM RPZ OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CMS, CJG LAT, DLF, CAM3 CLG, LMB NLH, WSW LSO NRC Attendees Mtg Announcement Coordinator E. L. Jordan, DEDO H. L. Thompson, DEDR F. J. Miraglia, A/D/NRR T. T. Martin, Acting ADT/NRR R. P. Zimmerman, ADP/NRR J. Lieberman, D/OE L. J. Chandler, OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Secretaries DRS Secretaries DNMS Secretaries L. S. Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File WCFO File DOCUMENT NAME: R:i WN2iWN7-31MN.DRP To receive copy of docu ent, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No co y RIL/:C:ORP/E HJWong;df 7/28/97 (E) 0:WCFO KEPerk 7/

/97 AO RSLO NA NA BWHenderson CAHackney D:DRP TPGwynn 7/P

/97

t,

Washington Public Power Supply System

.4-JUL 29 l997 E-Mail To:

FOR

(

)

PMNS JKR PAB FJM TTM RPZ OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CMS, CJG LAT, DLF, CAM3 CLG, LMB NLH, WSW LSO NRC Attendees Mtg Announcement Coordinator E. L. Jordan, DEDO H. L. Thompson, DEDR F. J. Miraglia, A/D/NRR T. T. Martin, Acting ADT/NRR R. P. Zimmerman, ADP/NRR J. Lieberman, D/OE L. J. Chandler, OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Secretaries DRS Secretaries DNMS Secretaries L. S. Ousley CC:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File WCFO File DOCUMENT NAME: R:i WN2iWN7-31MN.DRP To receive copy of docu ent, indicate in box: "C" = Copy without enclosures "E" = Copy with enciosures "N" = No co y RIL/:C:DRP/E HJWong:df 7/28/97 (E) 0:WCFO KEPerk 7/

/97 AO RSLO BWHenderson CAHackney NA NA Y-I/

N 0:ORP TPGwynn 7/j. /97

0 f