ML17292A949
| ML17292A949 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/29/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9707310258 | |
| Download: ML17292A949 (9) | |
Text
pR PK<< ~il~
REVISED REVISED uNITED STATEs NUCLEAR REGULATORY COMMISSION REG)ON IV 011 RYAN >LAZA DRIVE SUITE 400 AR L 1 VG TO'V T E X AS 7~01 1-8064 JUL 29 l997 REVISED REVISED REVISED REVISED REVISED Revised for changes to the purpose of the meeting.
There is also an additional licensee attendee.
Name of Licensee:
Name of Facility:
Docket:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
NOTICE OF LICENSEE MEETING Washington Public Power Supply System Washington Nuclear Plant 2 50-397 July 31, 1997 1 p.m. - 5 p.m.
NRC Region IV, Training Conference Room Arlington, Texas Regulatory Interface Workshop - Discussion of Common Themes and Case Study (Reactor Feedwater Pump Trip Test)
E. W. Merschoff, Regional Administrator R. P. Zimmerman, Associate Director for Projects, Office of Nuclear Reactor Regulation (NRR)
J. E. Dyer, Deputy Regional Administrator J. W. Roe, Director, Division of Reactor Projects III/IV,NRR T. P. Gwynn, Director, Division of Reactor Projects (DRP)
W. H. Bateman, Director, Project Directorate IV-2, NRR A. T. Howell, Director, Division of Reactor Safety H. J. Wong, Chief, Reactor Project Branch E, DRP T. G. Colburn, Project Manager, NRR G. D. Replogle, Resident Inspector, DRP Licensee Attendees:
J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President for Nuclear Operations R. L. Webring, Vice President for Operations Support J. H. Swailes, General Engineering Manager D. A. Swank, Manager, Regulatory Affairs P. J. Inserra, Manager, Licensing P. Berghausen, Consultant 97073i0258 970729 PDR ADQCK 05000397 P
Washington Public Power Supply System NOTE:
(1)
This meeting is open to attendance by members of the general public.
(2)
NRC personnel, not listed above, that desire to attend this meeting should notify H. J. Wong at (510) 975-0296 by COB on July 25, 1997.
Approv
)vision of React P o)ec s Thomas P. Gwyn, Di ect r
D CC:
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-31 72 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
Washington Public Power Supply System Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.
Winston 5. Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System Jtj 29 1997 E-Mail To:
FOR
(
)
PMNS JKR PAB FJM TTM RPZ OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CMS, CJG LAT, DLF, CAM3 CLG, LMB NLH, WSW LSO NRC Attendees Mtg Announcement Coordinator E. L. Jordan, DEDO H. L. Thompson, DEDR F. J. Miraglia, A/D/NRR T. T. Martin, Acting ADT/NRR R. P. Zimmerman, ADP/NRR J. Lieberman, D/OE L. J. Chandler, OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Secretaries DRS Secretaries DNMS Secretaries L. S. Ousley cc:
DMB (IE 45)
OEDO RIV Coordinator (17G21)
Receptionist ORA File RIV File DRP File WCFO File DOCUMENT NAME: R:i WN2iWN7-31MN.DRP To receive copy of docu ent, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No co y RIL/:C:ORP/E HJWong;df 7/28/97 (E) 0:WCFO KEPerk 7/
/97 AO RSLO NA NA BWHenderson CAHackney D:DRP TPGwynn 7/P
/97
t,
Washington Public Power Supply System
.4-JUL 29 l997 E-Mail To:
FOR
(
)
PMNS JKR PAB FJM TTM RPZ OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CMS, CJG LAT, DLF, CAM3 CLG, LMB NLH, WSW LSO NRC Attendees Mtg Announcement Coordinator E. L. Jordan, DEDO H. L. Thompson, DEDR F. J. Miraglia, A/D/NRR T. T. Martin, Acting ADT/NRR R. P. Zimmerman, ADP/NRR J. Lieberman, D/OE L. J. Chandler, OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Secretaries DRS Secretaries DNMS Secretaries L. S. Ousley CC:
DMB (IE 45)
OEDO RIV Coordinator (17G21)
Receptionist ORA File RIV File DRP File WCFO File DOCUMENT NAME: R:i WN2iWN7-31MN.DRP To receive copy of docu ent, indicate in box: "C" = Copy without enclosures "E" = Copy with enciosures "N" = No co y RIL/:C:DRP/E HJWong:df 7/28/97 (E) 0:WCFO KEPerk 7/
/97 AO RSLO BWHenderson CAHackney NA NA Y-I/
N 0:ORP TPGwynn 7/j. /97
0 f