MONTHYEARML20117H7061996-02-0606 February 1996 Rev 15 of IST Program for Callaway Nuclear Plant ML20087F4021995-08-0303 August 1995 Refuel 7 ISI Summary Rept ML20071H6051994-06-16016 June 1994 Rev 14 to Inservice Testing Program for Callaway Nuclear Plant ML20063L0801994-02-11011 February 1994 Refuel 6 ISI Summary Rept ULNRC-03080, Eddy Current Exam Callaway Nuclear Power Station Unit 1 SG a & D1993-10-31031 October 1993 Eddy Current Exam Callaway Nuclear Power Station Unit 1 SG a & D ML20099G2131992-08-0606 August 1992 Form NIS-1 Owners Data Rept for Inservice Insps as Required by Provisions of ASME Code Rules ML20128F9471992-04-30030 April 1992 Eddy Current Exam,Ue Callaway Nuclear Power Station,Unit 1 SGs B & C ML20149J4581988-02-12012 February 1988 Refuel 2 Inservice Insp Rept for 860419-871115 ML20209J5101987-04-28028 April 1987 Submits Special Rept Re Number of Tubes Plugged During Second Steam Generator Tube Inservice Insp,Per Tech Spec 4.4.5.5.a.Tubes Plugged While Plant in Mode 5 Cold Shutdown for Planned Maint Outage 1996-02-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30
[Table view] |
Text
.w .. ~
Umov Etscraic s
Cataway Plant April 28, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-1503 Centlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 SPECIAL REPORT 87-03 l
NUMBER OF TUBES PLUGGED DURING SECOND STEAM GENERATOR TUBE INSERVICE INSPECTION This Special Report is being submitted in accordance with Technical j Specification (T/S) 4.4.5.5.a which states:
"Within 15 days following the complation of each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission in a Special Report pursuant to Specification j 6.9.2."
! The Second Steam Generator (S/G) Inservice Inspection was completed for S/G's 'B' and 'C' on 4/15/87 to meet the surveillance requirements of T/S 3/4.4.5, " Steam Generators." The plant was in Mode 5 - Cold Shutdown for a planned maintenance outage. Five tubes were plugged as a result of the inspection and are identified below:
S/G 'B' S/G 'C' Row Column Row Column l
33 11 44 102 41 18 42 104 38 108 l
! d 8705040301 870428 (p g PDR ADOCK 05000483 Q PDR
/ D. Blosser Manager, Callaway Plant
$U RDA/TPS/SEMe/dra Enclosure l ec: Distribution attached I
l Manng Adhess- P.O Box 620 ftttm MO 65251
cc distribution for ULNRC-1503 Mr. Paul O'Connor (2 copies) Manager, Electric Department Office of Nuclear Reactor Regulation Missouri Public Service Commission U.S. Nuclear Regulatory Commission P. O. Box 360 Mail Stop P-316 Jefferson City, MO 65102 7920 Norfolk Avenue Bethesda, MD 20014 Mr. O. Maynard Wolf Creek Nuclear Operating Corp.
Mr. A. Bert Davis P. O. Box 411 Regional Administrator Burlington, KS 66839 U. S. Nuclear Regulatory Commission Region III Mr. Merlin Williams 799 Roosevelt Road Supt. of Regulatory Quality &
Glen Ellyn, IL 60137 Administrative Services Wolf Creek Nuclear Operating Corp.
American Nuclear Insurers P. O. Box 411 c/o Dottie Sherman, Library Burlington, KS 66839 The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, CA 30339 NRC Resident Inspector D. F. Schnell (400)
R. J. Schukai (470)
G. L. Randolph J. F. McLaughlin J. E. Davis (Z40SR)
(Z40SR) (w/c)
D. W. Capone /R. P. Wendling (470)
F. D. Field (480)
A. P. Neuhalfen A. C. Passwater/D. E. Shafer/D. J. Walker (470)
G. A. Hughes Z40.03 (QA Record)
J. M. Price R. D. Affolter M. E. Taylor H. Wuertenbaecher, Jr. (100)
S. L. Auston (470)(NSRB)
S. J. Bellers/J. D. Schnack JDB Chrono 3456-0021.6 3456-0260 Z40ULNRC C56.37 N. Date (Sandra Auston) (470)