ML21298A005

From kanterella
Revision as of 17:24, 15 November 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Spent Fuel Load Campaign
ML21298A005
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/22/2021
From: Dullinger J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-21-031
Download: ML21298A005 (3)


Text

Joseph A. Dullinger Plant Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 4104955205 Office 7173092403 Mobile www.exeloncorp.com joseph.dullinger@exeloncorp.com 10 CFR 72.212 October 22, 2021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Initial Spent Fuel Load Campaign On November 1, 2021, Exelon Generation Company, LLC., is scheduled to begin initial loading at Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) of spent fuel under Calvert Cliffs general license.

Due to an administrative oversight, Calvert Cliffs failed to provide official notification 90 days prior to the start of the load campaign as required by 10CFR72.212(b)(1). However previous communications were made that has allowed the Nuclear Regulatory Commission to schedule its inspection of the upcoming load campaign.

The following information is provided in accordance with 10 CFR 72.212(b)(2):

Licensee Name: Exelon Generation Company, LLC Licensee Address: Calvert Cliffs Nuclear Power Plant Units 1 and 2 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Reactor License & Docket Numbers:

Unit 1: License #: DPR-53 Docket #:50-317 Unit 2: License #: DPR-69 Docket #:50-318 Site

Contact:

Larry Smith - Manager - Regulatory Assurance; larry.smith2@exeloncorp.com; (410) 495-5219

Document Control Desk October 22, 2021 Page 2 We apologize for the lateness of this letter. If you have any questions, please contact Mr. Larry Smith as indicated above.

Respectfully, Joseph A. Dullinger Plant Manager JAD/KLG/lmd cc:

Regional Administrator, Region 1, NRC Document Control Desk, NRC NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs

Document Control Desk October 22, 2021 Page 3 bcc: (Without Attachments)

T. P. Haaf J. A. Dullinger D. J. Hild L. D. Smith NRC 21-031