Forwards FPC Crystal River,Unit 3,Tendon Surveillance Program Engineering Evaluation of Sixth Tendon Surveillance
ML20217B159
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/16/1998
From: Baumstark J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217B163 List:
References
3F0498-04, 3F498-4, NUDOCS 9804220433
Download: ML20217B159 (1)


Text

% . e Fisrida Power fJ* RAJLoN o,.E"s*uM w.. opa-n April 16,1998 ,

3F0498-04 l U.S. Nuclear Regulatory Commission Attn: Document Control Desk )

Washington, DC 20555-0001 j

Subject:

SIXTH CONTAINMENT TENDON SURVEILLANCE

SUMMARY

References:

1. Special Report 97-07, FPC to NRC Letter Number 3F1297-06, dated December 6,1997
2. Special Report 97-09, FPC to NRC Letter Number 3F0198-07, dated January 8,1998
3. Special Report 98-01, FPC to NRC Letter Number 3F0398-21, dated March 10,1998

Dear Sir:

Florida Power Corporation (FPC) is hereby submitting the Crystal River Unit 3 (CR-3) Sixth Containment Tendon Surveillance summary report. The tendon surveillance was conducted I between October 20,1997, and January 16, 1998, in accordance with ASME,Section XI,1992  !

Edition.

FPC previously submitted three Special Reports identifying nonconforming conditions which were identified during the surveillence. This summary report provides the engineering evaluation of those nonconformances. There are no new regulatory commitments made in this submittal. l If you have any questions conceming this s:.bmittal, please contact Ms. Sherry Bernhoft, Manager, I Nuclear Licensing at (352) 563-4566.

Sincerely, d

/ r .

J. S. aumstark Director Nuclear Engineering and Projects e \;

JSB/pmp Enclosure .( d xc: Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager 9804220433 980416 PDR ADOCK 05000302 PDR CRYSTAL RIVER ENERGY COMPLEX: 16760 W. Power Line Street

  • Crystal River, Florida 34428 4708 . (352)7954486 A Florida Progress Company