MONTHYEARML21251A1732021-10-21021 October 2021 Enclosure 1 - Pilgrim Amendment No. 257 ISFSI Only Emergency Plan ML21203A0482021-08-24024 August 2021 License Amendment No. 256 ML21217A1752021-08-0505 August 2021 Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version ML21103A0562021-05-12012 May 2021 Amendment Pilgrim Ps -Alternative Measures Rev 20 ML20335A1832020-12-0101 December 2020 Amendment Pilgrim Ps ISFSI to Incorporate ISFSI II ML20328A2972020-12-0101 December 2020 Amendment No. 253 - Non-Safeguards Version ML19274C6742020-01-0202 January 2020 Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition ML19276C4202020-01-0202 January 2020 Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled Condition ML19275E4252019-10-28028 October 2019 Issuance of Amendment No. 250, Revise Technical Specifications to Permanently Defueled TS and Revise Facility License for Permanently Defueled Condition ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment ML19170A1012019-08-22022 August 2019 Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator ML18284A3752018-11-30030 November 2018 Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition ML18295A0252018-11-16016 November 2018 Correction to Remove Technical Specification Pages from Authority File Related to Amendment Nos. 169 and 177 ML17066A1302017-07-10010 July 2017 Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) ML16250A2232016-10-28028 October 2016 Issuance of Amendments Proposed Changes to Emergency Plan to Revise Training for the on - Shift Chemistry Technician ML16082A4602016-06-0606 June 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML15114A0212015-05-0606 May 2015 Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment Request ML14272A0702015-03-12012 March 2015 Issuance of Amendment 242 Re Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open Transient ML14336A6612014-12-11011 December 2014 Issuance of Amendment Regarding Cyber Security Plan Implementation Schedule Milestone 8 (Tac No. MF3482) ML14295A6852014-10-31031 October 2014 Issuance of Amendment Regarding Heavy Loads to Facilitate Dry Storage Handling Operations ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A1302012-11-13013 November 2012 Issuance of Amendments to Renewed Facility Operating License Changes in Cyber Security Plan Implementation Milestone ML1220100482012-08-0707 August 2012 Issuance of Amendment No. 237 Revision to Condensate Storage Tank Low Level Trip Setpoint ML0910404232012-05-29029 May 2012 Issuance of Renewed License for Pilgrim Nuclear Generating Station ML11152A0432011-07-22022 July 2011 License Amendment, Cyber Security Plan ML1106500092011-03-28028 March 2011 Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves ML0906402242009-03-26026 March 2009 License Amendment, Revised Technical Specifications (TS) Section 2.1.2, Safety Limit Minimum Critical Power Ratio (SLMCPR) for Two-Loop and Single-Loop Operation ML0815703662008-11-20020 November 2008 License Amendment, Issuance of Amendment Adoption of TSTF-448, Revision 3, Control Room Envelope Habitability ML0727503942007-11-0505 November 2007 License Amendment, Issuance of Amendment Control Rod Operability, Scram Insertion Time, and Control Rod Accumulator Requirements ML0723400092007-08-23023 August 2007 Revised License Pages of Facility Operating License DPR-35 B.5.b ML0708711652007-05-14014 May 2007 Issuance of Amendment Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers ML0707404192007-04-25025 April 2007 License Amendment, Issuance of Amendment Single Control Rod Withdrawal Allowances ML0705303842007-03-26026 March 2007 License Amendment, Issuance of Amendment Extension of Pressure-Temperature Limits Specified in Technical Specifications ML0705306462007-03-26026 March 2007 Issuance of License Amendment 226 Adoption of Technical Specification Task Force (TSTF) Change TSTF-484 Use of TS 3.10.1 for Scram Time Testing Activities. ML0624303372006-09-20020 September 2006 License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions ML0622803042006-09-14014 September 2006 Issuance of Amendment Relocation of Technical Specifications ML0617200682006-08-0909 August 2006 Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities ML0618400322006-08-0404 August 2006 Issuance of License Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature ML0606000402006-04-13013 April 2006 Issuance of Amendment Removal of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement ML0607402142006-04-13013 April 2006 License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances ML0601701192006-04-12012 April 2006 Issuance of Amendment Single Recirculation Loop Operation ML0531404332006-04-10010 April 2006 Issuance of Amendment Revised Applicability for Containment Oxygen and Differential Pressure Limits ML0518700032005-08-29029 August 2005 Issuance of License Amendment 217, Surveillance Frequency Improvements ML0518702572005-07-29029 July 2005 License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain Valves ML0501804932005-03-16016 March 2005 License Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements ML0500504862005-02-0202 February 2005 Issuance of Amendment Changes to Technical Specifications Table 3.2.C-1 ML0423001372005-01-0505 January 2005 License Amendment, Revision to the Reactor Pressure Vessel Material Surveillance Program ML0434902432004-12-27027 December 2004 Issuance of Amendment Engineering Evaluation Submitted Pursuant to Technical Specifications Section 3.6.D.3 and 3.6.D.4 ML0419704502004-08-17017 August 2004 License Amendment, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D ML0411000092004-07-22022 July 2004 License Amendment, Eliminate Requirements for Hydrogen Analyzers 2021-08-05
[Table view] |
Text
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC.
DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 254 License No. DPR-35
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for license amendment filed by the Holtec Decommissioning International LLC, Inc. (HDI or the licensee), dated April 2, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20141L057 Pkg.), as supplemented by letters dated April 22, 2020, (ADAMS Accession No. ML20122A055), June 25, 2020 (ML20188A061), July 21, 2020 (ML20213C031, nonpublic), July 22, 2020 (ML20213B743, nonpublic), and July 30, 2020 (ML20220A351 and ML20220A352, nonpublic), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and applicable portions of the Commissions regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I, and all required notifications to other agencies or bodies have been duly made; B. The facility will operate in conformity with the application, as supplemented, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security, or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, of the Commissions regulations and all applicable requirements have been satisfied.
- 2. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to 10 CFR 72.212(b)(9) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is titled: Pilgrim Nuclear Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Pilgrim ISFSI II Physical Security Plan, Revision 20," dated October 5, 2020 (Agencywide Documents Access and Management System [ADAMS] Accession No.
Main Library [ML] ML20283A292), as supplemented by letters December 10, 2020
2 (ADAMS Accession No. ML20346A047), February 25, 2021 (ADAMS Accession No.ML21063A104), and March 17, 2021 (ADAMS Accession No. ML21077A103, non-public OUO-Security Related Information).
- 3. This license amendment is effective immediately. The Physical Security Plan, Rev. 20 shall be implemented when the required physical security training to address changes from Rev. 19A to Rev. 20 is complete. Appendix D of the Physical Security Plan, Revision 20, shall not be implemented until after the required security training to address changes from Appendix D Rev. 19A to Appendix D Rev. 20 is complete and the licensee receives written verification from the NRC that the licensee has adequately demonstrated compliance with the additional security measure requirements (as applicable to ISFSI II) per Order EA-13-132.
FOR THE NUCLEAR REGULATORY COMMISSION Signed by Watson, Bruce on 05/12/21 Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards
Attachment:
Change to Facility Operating License No. DPR-35 Date of Issuance: May 12, 2020