ML20211J403
| ML20211J403 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/27/1999 |
| From: | NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20211J385 | List: |
| References | |
| NUDOCS 9909030136 | |
| Download: ML20211J403 (1) | |
Text
.. .
~*
DC Sourc;s - Oper: ting 3.8.4 i G SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies 2 300 amps at 18 months 2130 V for 2 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
NOTES
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
- 2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.
Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.
I (continued) I 1
1 l
- On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.
9909030136 990827 PDR ADOCK 05000445 P PDR COMANCHE PEAK - UNITS 1 AND 2 3.8-26 Amndment No. #, H, 66