NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e
ML20239A794
Person / Time
Site: Beaver Valley, Davis Besse
Issue date: 08/25/2020
From: Bhalchandra Vaidya
NRC/NRR/DORL/LPL3
To: Lashley P
Energy Harbor Nuclear Corp
References
L-2020-LLA-0169
Download: ML20239A794 (3)


Text

From: Vaidya, Bhalchandra Sent: Tuesday, August 25, 2020 7:48 AM To: Lashley, Phil H (EH Cc: Salgado, Nancy; Park, Dong; Vazquez, Justin; Ashley, Clinton; Kavanagh, Kerri; Cowdrey, Christian; Cusumano, Victor; Green, Brian

Subject:

ENERGY HARBOR FLEET, BEAVER VALLEY UNITS 1 AND 2 AND DAVIS-BESSEL UNIT 1- ACCEPTANCE OF LICENSE AMENDMENT REQUEST RE:

INCORPORATION OF APPLICABLE STANDARD IN TS 5.2.2.e

SUBJECT:

ENERGY HARBOR FLEET, BEAVER VALLEY UNITS 1 AND 2 AND DAVIS-BESSE UNIT 1- ACCEPTANCE OF LICENSE AMENDMENT REQUEST RE: INCORPORATION OF APPLICABLE STANDARD IN TS 5.2.2.e Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 EPID-L-2020-LLA-0169 By letter dated July 27, 2020 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML20209A540), pursuant to 10 CFR 50.90, Energy Harbor Nuclear Corp (the Licensee). submitted a request for amendment of the Renewed Operating Licenses DPR-66, NPF-73, and NPF-3 for the Beaver Valley Power Station, Unit Nos. 1 and 2, and Davis-Besse Nuclear Power Station, Unit No. 1, respectively. The proposed changes will also revise the current facility Technical Specification 5.2.2.e to reflect the applicable facility Standard Technical Specifications. Additionally, a position title change will be made to reflect a more generic position title.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this [amendment/relief] request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 96 man-hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is July 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL3 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 753 Mail Envelope Properties (DM6PR09MB44169BF0B3515D9A9D0C93C08D570)

Subject:

ENERGY HARBOR FLEET, BEAVER VALLEY UNITS 1 AND 2 AND DAVIS-BESSEL UNIT 1- ACCEPTANCE OF LICENSE AMENDMENT REQUEST RE:

INCORPORATION OF APPLICABLE STANDARD IN TS 5.2.2.e Sent Date: 8/25/2020 7:47:45 AM Received Date: 8/25/2020 7:47:45 AM From: Vaidya, Bhalchandra Created By: Bhalchandra.Vaidya@nrc.gov Recipients:

"Salgado, Nancy" <Nancy.Salgado@nrc.gov>

Tracking Status: None "Park, Dong" <Dong.Park@nrc.gov>

Tracking Status: None "Vazquez, Justin" <Justin.Vazquez@nrc.gov>

Tracking Status: None "Ashley, Clinton" <Clinton.Ashley@nrc.gov>

Tracking Status: None "Kavanagh, Kerri" <Kerri.Kavanagh@nrc.gov>

Tracking Status: None "Cowdrey, Christian" <Christian.Cowdrey@nrc.gov>

Tracking Status: None "Cusumano, Victor" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Green, Brian" <Brian.Green@nrc.gov>

Tracking Status: None "Lashley, Phil H (EH" <phlashley@energyharbor.com>

Tracking Status: None Post Office: DM6PR09MB4416.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3605 8/25/2020 7:47:45 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: