MONTHYEARML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23129A3122023-05-0909 May 2023 NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23089A1252023-03-30030 March 2023 NRR E-mail Capture - Beaver Valley Upcoming Steam Generator Tube Inservice Inspection ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23079A1202023-03-20020 March 2023 NRR E-mail Capture - Acceptance Review for Beaver Valley 1 & 2 Exemption from Specific Provisions in 10 CFR 50 Appendix H ML23065A0782023-03-0303 March 2023 Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22321A2392022-11-17017 November 2022 NRR E-mail Capture - (External_Sender) Beaver Valley Power Station, Units 1&2 - Clarification on LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22273A1132022-09-30030 September 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action to Add Full Spectrum LOCA Methodology to COLR ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22277A5122022-09-19019 September 2022 NRR E-mail Capture - (External_Sender) Eh Response to Corrected SE Associated with Beaver Valley Amendments 315 and 205 Changes to the EPP ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22238A2812022-08-25025 August 2022 Request for Additional Information for Beaver Valley Unit 2 - 2R22 Steam Generator 180 Day Report ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22173A0402022-06-21021 June 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22147A0392022-05-27027 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22129A0122022-05-0606 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Unit 2 Amendment - Correct TS 3.1.7 Change Made by TSTF-547 ML22123A0232022-05-0202 May 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action for Beaver Valley Power Station, Units 1 and 2 - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22153A5212022-04-15015 April 2022 Email Error in Energy Harbor Submittal and Associated SE for Beaver Valley 1 & 2 - Containment Isolation Valve Relief Request ML22101A0122022-04-0808 April 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22087A1302022-03-28028 March 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Adopt TSTF-577 ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 2024-01-17
[Table view] |
Text
Vaidya, Bhalchandra From: Vaidya, Bhalchandra Sent: Monday, October 5, 2020 7:41 AM To: Lashley, Phil H Cc: Salgado, Nancy; Mitchell, Matthew; Gonzalez, Hipo
Subject:
Energy Harbor Fleet, Results Of Acceptance Review Re: Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI, EPID-l-2020-LLR-0132
SUBJECT:
Results Of Acceptance Review Re: Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI, EPIDl2020LLR0132 By letter dated September 28, 2020, Energy Harbor Nuclear Corp. (Energy Harbor, the Licensee) submitted a relief request for DavisBesse Nuclear Power Station, Unit No. 1 (DBNPS), Perry Nuclear Power Plant, Unit No. 1 (PNPP), and Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS). The purpose of this email is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review of this [amendment/relief] request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to complete. The NRC staff expects to complete this review in approximately 4 months, which is January 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Bhalchandra K. Vaidya US Nuclear Regulatory Commission 1
Office of Nuclear Reactor Regulation Division of Operatig Reactor Licensing LPL3 301-415-3308 Bhalchandra.vaidya@nrc.gov 2