ML20217J048

From kanterella
Revision as of 20:37, 1 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14
ML20217J048
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/05/1997
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML19317C583 List:
References
NUDOCS 9708130411
Download: ML20217J048 (2)


Text

. . _ . _ _ . _ _ . _ . . . _ . _ . _ . . _ _ . _ _ _ _ _ _ - _ _ _ . . _ . _ _ . . . _ _,_ _ _ _ . _

-.1 ,

e

.i ,

. r..

  • e *: c. -Attachment 3 Technical Specification Mark-Up ,

J.

r i

d, '

.d j.

l' f

4-i i

1 A

i 4

i i

9 h

1 4.-

I b'

I l-j...

l-t 4

i I

l l.

l l'

A 9708130411 970005 PDR c.

s P_

ADOCK 05000458 PDR t2st-=p Tre py- -yaf vf $ F' ius - y ,y- ry y-q-ay *-- M  % yg

-- ay re Jr

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.5 Reactor Core SLs

- 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be s 25% RTP.

2.1.1.2 With the reactor steam dome pressure a 785 psig and core flow a 10% oted core flow:

la/25 MCPR shall be a 1<fT for two recirculation loop operation or a 1,86'for single recirculation loop operation. /, /4/

2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be s 1325 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed:

2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.2.1 Restore compliance with all SLs; and 2.2.2.2 Insert all insertable control rods.

2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the plant manager and the corporate executive responsible for overall plant nuclear safety.

(continued) s RIVER BEND 2.0 1 Amendment No. 81

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ .