Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
. - _ _ . . - _ . . _ - _ _ - - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ - - _ _ _ _ _ _ _ _ _ _ - _ - - - -
m.--.
North _~ North Atlantic Energy Service Corporation P.O. Box 300
'hy' . Atlantic seahreek.Nii0a874 h
(603) 474-9521 The Northeast Utilities System July 9,1998 Docket No. 50-443 NYN-98089 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Monthly Operating Reoort Enclosed please find Monthly Operating Report 98-06. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of June,1998 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further -information regarding this matter, please contact Mr. Terry L. Harpster, Director of Licensing Services, at (603) 773-7765.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
M;A&-
fA. DiProfio [
Station Director' t-l j_ CC:
l H. J. Miller, NRC Region I Administrator J. T. Harrison, NRC Project Manager, Project Directorate 1-3 i R. K. Lorson, NRC Senior Resident Inspector hh \
q
.J' 9907140038 980630 PDR "I
R ADOCK 05000443;, pop
OPERATING DATA REPORT DOCKET NO. 50453 UNIT Seabrook 1 DATE July 1,1998 COMPLETED BY P.E. Nardone TELEPHONE (603) 773 7074 OfERATING STAT 1]S
- 1. Umt Name: Seabrook Station Unit 1
- 2. Reporting Period: JUNE 1998
- 3. Licensed Thermal Power (MWt): 3411
- 4. Nameplate Rating (Gross MWe): 1197
- 5. Design Electncal Ratmg (Net MWe): 1148
- 6. Maximurn Dependable Capacity (Gross MWe): 1204 7, Maximum Dependable Capacity (Net MWe): 1158
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): None
- 10. Reasons For Restricuons, If Any: Not Applicable This Month Yr-to-Date Cumulative
- 11. Hours in Reportmg Period 720.0 4343.0 102600.0
- 12. Number of Hours Reactor Was Critical 246.0 3505.2 60168.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 953.3
- 14. Hours Generator On-Line 245.3 3474.8 57706.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross 'Ihermal Energy Generated (MWH) 823068 11798599 191256681
- 17. Gross Elec. Energy Generated (MWH) 290524 4165390 66806299
- 18. Net Electrical Energy Generated (MWH) 279557 4008540 64206194
- 19. Urut Service Factor 34.1 80.0 81.7 l
- 20. Unit Availability Factor 34.1 80.0 81.7
- 21, Urut Capacity Factor (Using MDC Net) 33.5 79.7 79.5
- 22. Unit Capacity Factor (Using DER Net) 33.8 80 4 79.8
- 23. Unit Forced Outage Rate 65 9 20.0 6.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, None Scheduled and Duranon of Each): !
- 25. If Shut Down At End Of Report Period, Esumated Date of July 06,1998 Startup:
' NOTE. " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began.
Increased MDC values (Items 6 & 7) starting 12/01/95.
1 of 4
.____.__________._o
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT Seabrook 1 DATE July 1,1998 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074
)
MONTH JUNE 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M'We-Net) (MWe-Net) 1 1161 17 0 2 1161 18 0 3 1161 19 0 l 4 1162 20 0 5 1161 21 0 6 1162 22 0 7 1162 23 0 8 1161 24 0 9 1161 25 0 10 1054 26 0 11 141 27 0 12 0 28 0 13 0 29 0 14 0 30 0
{
15 0 16 0 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l 2 of 4
~
Ofo m0 T 1 s 90 e9 a p
t o
4 eats 3 c o mse B
~
8 9
e m7 7
0 Ne Og a t
tu a e p
mou r a 5 f c I
k 9
1 dr 3 I
T P gwS ut A) nt d e
o o 1, a 7 7 C lpanhc B wo o o o 3
5 r N A l e C( d rr M 4 b .
- 3) to pT 3
a e
ly u E. 0 E E P eh or ir eo
( VC T I Tf gt e i s
T N R t
. n **dlpmmant a tn CE .
O. T E Y I
T B E
N E R %B e RR 01 me
l ad pek N N A D D RU o 92 ta lollef e r E O U B n ht o T HP t d t E T O C r nS a n or ri , gw K E E CE e r t fo 8
- C L L & R wAo o1 n) "' tem c M
9
/ nt 0 e
- O P E c
^Ccd8a 4 X 3b D M T E dp2 Awlo /
6 er S e sdeb e f O
C U
A c re ut r so te9 a n 0
f oA a
C d a e e # amiR t iEt e sB e e tn se n L ac R1 e( 1 r t I AC T
N E
S V #
N ETR E O E A X I E SP O N
/
8 4
T NE 9 C ER U C I
D L E
R h 0) t n =
R G o
mro t E N si W I R ua o r t
O T UT'O I
ieD v u P I I C mpn( r SA D FE 5 1 a
mrc ot m m )n c ia N OR a rS f r ul d p A DN c S tcd ex OW ai u eRE S
l l I
O : u a ua n nr (r N E I
TD o a tnaie d n s n e h
W hMM s
ACI oVtO M t e - - - - - -
O M1 2 3459 D s T ,
U I
S T
I A A
/
A t
a m
E N R m a
U E x
) e i
n s n
)
n a e i lp c a N) x i
lp OS E nL x T R I
0 7 ( t s o&g i
t E
A U
(
4 e r
e ic r 0 T r n R O o )
7 l 4 lu r t s ur r Ul ia o e r n D( F ec t
e R r yT iaaivEi t l a lp a
en n a gror r nx mnntel a t o i
t s eE (
pt el ai mta r e eupdr pt meh
- in ui f u g e r e
'E nqa o
P V
F F s a EMRROAOO e
T RABCDEFGI I 2
8 E
1 9
/
8 9
0 /
8 9 A 1 1 1
9 1
D /6 0 6
/
E d e
N d u l
U J
ed c e rh oc l . 1 2 FS i
T O 4 -
0 N N 8 9
8 9 : :
O F5 M I
j .
REFUELING INFORMATION REQUEST DOCKET NO. 50-443 UNIT Seabrook1 DATE July 1,1998 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074
- 1. Name of Facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Refueling Outage 6, 04/03/99 l
- 3. Scheduled date for restart following refueling: Refueling Outage 6, 05/12/99 [ 40 days ]
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A
- 5. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) 193 (b) 376 (*) (c) 0 (*)
(*) Four new fuel assemblies were moved to Spent Fuel Pool on 06/12/98.
These were originally Cycle 06 Feed Fuel Assemblies that now will be utilized in Cycle 07.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
4of4