Category:INSPECTION REPORT
MONTHYEARML20217B3271999-10-0606 October 1999 Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant Y2K Program,Including Mgt Planning,Implementation,Qa,Regulatory Considerations & Documentation,Per GL 98-03 ML20212K9301999-10-0404 October 1999 Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20212F1181999-09-22022 September 1999 Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security ML20212B6681999-09-15015 September 1999 Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted. Major Areas Inspected:Engineered Fire Protection Sys, Implementation of Administrative Fire Prevention Controls & Manual Fire Suppression Response Capabilities ML20211L8981999-09-0202 September 1999 Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted. Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20210P7671999-08-10010 August 1999 Insp Rept 70-7001/99-08 on 990529-0719.Violations Noted. Major Areas Inspected:Plant Operations,Engineering & Plant Support ML20209F0741999-07-0909 July 1999 Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted. Major Areas Inspected:Insp Noted That Operators Response to Small UF6 Release in Building C-337A Was Effective & Consistent with Guidance Provided in Alarm Response ML20196K1051999-07-0101 July 1999 Insp Rept 70-7001/99-07 on 990413-0528.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20206E6591999-04-29029 April 1999 Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted. Major Areas Inspected:Plant Staff Took Appropriate Actions to Trip Process Motors for Cell Involved with Motor Fire Due to Failed motor-to speed-increaser Coupling ML20205R8141999-04-20020 April 1999 Partially Withheld Insp Rept 70-7001/99-201 on 990322-26. Details Withheld ML20205J3091999-04-0202 April 1999 Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted. Major Areas Inspected:Compliance with Certificate Holder Approved Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance ML20207K3091999-03-11011 March 1999 Insp Rept 70-7001/99-01 on 990113-0223.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20203G4231999-02-0909 February 1999 Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted. Major Areas Inspected:Plant Support ML20198H8891998-12-21021 December 1998 Insp Rept 70-7001/98-17 on 981015-1130.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20154R1421998-10-22022 October 1998 Partially Withheld Insp Rept 70-7001/98-206 on 980928-1002. Details Withheld,Per 10CFR2.790 ML20155A4341998-10-22022 October 1998 Insp Rept 70-7001/98-205 on 980915-18.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant High Risk Chemical Release Possibilities That May Occur as Result of Seismic Initiating Event ML20154R8351998-10-21021 October 1998 Insp Rept 70-7001/98-16 on 980902-1014.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154P5181998-10-16016 October 1998 Insp Rept 70-7001/98-13 on 980721-0901.Violations Noted. Major Areas Inspected:Plant Operations,Main Surveillance, Engineering & Plant Support ML20154J7571998-10-0909 October 1998 Insp Rept 70-7001/98-15 on 980908-11.No Violations Noted. Major Areas Inspected:Maint & Surveillance & Plant Support ML20153B3451998-09-16016 September 1998 Insp Rept 70-7001/98-204 on 980831-0903.No Violations Noted. Major Areas Inspected:Ncs Related Open Items,Corrective Actions & Corrective Action Tracking,Criticality Safety & Plant Operations ML20237E6031998-08-27027 August 1998 Insp Rept 70-7001/98-14 on 980803-07.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20236Y1151998-08-0505 August 1998 Insp Rept 70-7001/98-11 on 980609-0720.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236R2261998-07-14014 July 1998 Insp Rept 70-7001/98-12 on 980622-26.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance & Plant Support ML20236F8241998-06-30030 June 1998 Insp Rept 70-7001/98-09 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20249B0681998-06-15015 June 1998 Insp Rept 70-7001/98-10 on 980518-22.Violation Noted. Major Areas Inspected:Maint & Plant Support ML20216B9231998-05-0707 May 1998 Insp Rept 70-7001/98-06 on 980310-0420.Violation Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support ML20217L8551998-04-28028 April 1998 Insp Rept 70-7001/98-203 on 980330-0403.No Violations Noted. Major Areas Inspected:Chemical Process Safety Insp of Paducah Gaseous Diffusion Plant,In Paducah,Ky on 980330-0403 ML20217D9071998-04-22022 April 1998 Insp Rept 70-7001/98-08 on 980331-0402.No Violations Noted. Major Areas Inspected:Evaluation of Certificatee Performance During Plant Biennial Exercise of Emergency Plan ML20216B0491998-04-0808 April 1998 Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted. Major Areas Inspected:Operations & Training ML20216B6671998-04-0606 April 1998 Insp Rept 70-7001/98-03 on 980120-0309.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Surveillance & Engineering ML20217G7901998-03-27027 March 1998 Insp Rept 70-7001/98-04 on 980223-27.No Violations Noted. Major Areas Inspected:Provided follow-up on 970505-09 Security Insp Findings at Paducah Plant That Resulted in Escalated Enforcement & Review of Physical Security Plan ML20217G7331998-03-27027 March 1998 Insp Rept 70-7001/97-10 on 970919-980216.No Violations Noted.Major Areas Inspected:Operational Controls,Maint Programs,Engineering Design,Event Root Cause Evaluation & Classification & Reporting of Event ML20217F2261998-03-26026 March 1998 Partially Withheld Insp Rept 70-7001/98-202 (Ref 10CFR2.790) on 980302-06.No Violations Noted.Details Withheld ML20248L7871998-03-17017 March 1998 Insp Rept 70-7001/98-05 on 980223-27.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20197A7771998-02-27027 February 1998 Insp Rept 70-7001/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Compliance Plan Issue Closure,Plantwide Implementation of NCS Controls,Compliance W/Criticality Safety Commitments & Internal Self Assessment ML20248L9291998-02-26026 February 1998 Insp Rept 70-7001/98-02 on 980120-30.Violations Noted.Major Areas Inspected:Engineering,Maint & Surveillance,Plant Support,Training Program & QA Program ML20202G3181998-02-12012 February 1998 Insp Rept 70-7001/97-14 on 971125-980120.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20198R3231998-01-13013 January 1998 Paritally Withheld Insp Rept 70-7001/97-210 on 971215-19. Details Withheld Per 10CFR2.790 IR 07100008/20110241997-12-0909 December 1997 Insp Rept 70-7001/97-11 on 971008-1124.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20202E8821997-11-28028 November 1997 Insp Rept 70-7001/97-208 on 970915-19 & 1103-07.Violations Noted.Major Areas Inspected:Mgt & Administrative Practices for Nuclear Criticality Safety,Plant Operations,Operating Procedures & Criticality Alarm Monitoring Sys ML20199K3151997-11-26026 November 1997 Insp Rept 70-7001/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Engineering,Maintenance & Surveillance & Plant Support ML20199H6571997-11-20020 November 1997 Insp Rept 70-7001/97-08 on 970826-1007.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20212D1231997-10-29029 October 1997 Partially Withheld Insp Rept 70-7001/97-209 on 970929-1003. Violations Noted.Details Withheld,Per 10CFR2.790 ML20212D2831997-10-27027 October 1997 Predecisional Enforcement Conference Rept 70-7001/97-13 on 971009.Major Areas Discussed:Uncontrolled Classified Matter in Areas Outside Paducah Plant Control Access Area or Available Individuals W/O Q or L Access Authorization ML20211Q8111997-10-17017 October 1997 Insp Rept 70-7001/97-01 on 970908-12.Violations Noted.Major Areas Inspected:Qa Program ML20211C7341997-09-24024 September 1997 Insp Rept 70-7001/97-07 on 970715-0912.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Security & Environ Protection ML20211D3991997-09-17017 September 1997 Insp Rept 70-7001/97-207 on 970818-22.No Violations Noted. Major Areas Inspected:Training Program,Facility walk- Through,Tracking Sys,Sprinkler Sys Lines,Surveillance Requirements & Inspector follow-up Items ML20198G5011997-08-21021 August 1997 Insp Rept 70-7001/97-206 on 970721-25.No Violations Noted. Major Areas Inspected:Chemical Process Safety Program Requirements ML20198F7291997-08-0505 August 1997 Insp Rept 70-7001/97-04 on 970603-0714.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20149J4391997-07-23023 July 1997 Predecisional Enforcement Conference Rept 97-7001/97-05 on 970716.Major Areas Discussed:Five Apparent Violations Noted in Insp Rept.W/Viewgraphs 1999-09-22
[Table view] Category:NRC-GENERATED
MONTHYEARML20217B3271999-10-0606 October 1999 Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant Y2K Program,Including Mgt Planning,Implementation,Qa,Regulatory Considerations & Documentation,Per GL 98-03 ML20212K9301999-10-0404 October 1999 Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20212F1181999-09-22022 September 1999 Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security ML20212B6681999-09-15015 September 1999 Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted. Major Areas Inspected:Engineered Fire Protection Sys, Implementation of Administrative Fire Prevention Controls & Manual Fire Suppression Response Capabilities ML20211L8981999-09-0202 September 1999 Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted. Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20210P7671999-08-10010 August 1999 Insp Rept 70-7001/99-08 on 990529-0719.Violations Noted. Major Areas Inspected:Plant Operations,Engineering & Plant Support ML20209F0741999-07-0909 July 1999 Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted. Major Areas Inspected:Insp Noted That Operators Response to Small UF6 Release in Building C-337A Was Effective & Consistent with Guidance Provided in Alarm Response ML20196K1051999-07-0101 July 1999 Insp Rept 70-7001/99-07 on 990413-0528.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20206E6591999-04-29029 April 1999 Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted. Major Areas Inspected:Plant Staff Took Appropriate Actions to Trip Process Motors for Cell Involved with Motor Fire Due to Failed motor-to speed-increaser Coupling ML20205R8141999-04-20020 April 1999 Partially Withheld Insp Rept 70-7001/99-201 on 990322-26. Details Withheld ML20205J3091999-04-0202 April 1999 Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted. Major Areas Inspected:Compliance with Certificate Holder Approved Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance ML20207K3091999-03-11011 March 1999 Insp Rept 70-7001/99-01 on 990113-0223.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20203G4231999-02-0909 February 1999 Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted. Major Areas Inspected:Plant Support ML20198H8891998-12-21021 December 1998 Insp Rept 70-7001/98-17 on 981015-1130.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20154R1421998-10-22022 October 1998 Partially Withheld Insp Rept 70-7001/98-206 on 980928-1002. Details Withheld,Per 10CFR2.790 ML20155A4341998-10-22022 October 1998 Insp Rept 70-7001/98-205 on 980915-18.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant High Risk Chemical Release Possibilities That May Occur as Result of Seismic Initiating Event ML20154R8351998-10-21021 October 1998 Insp Rept 70-7001/98-16 on 980902-1014.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154P5181998-10-16016 October 1998 Insp Rept 70-7001/98-13 on 980721-0901.Violations Noted. Major Areas Inspected:Plant Operations,Main Surveillance, Engineering & Plant Support ML20154J7571998-10-0909 October 1998 Insp Rept 70-7001/98-15 on 980908-11.No Violations Noted. Major Areas Inspected:Maint & Surveillance & Plant Support ML20153B3451998-09-16016 September 1998 Insp Rept 70-7001/98-204 on 980831-0903.No Violations Noted. Major Areas Inspected:Ncs Related Open Items,Corrective Actions & Corrective Action Tracking,Criticality Safety & Plant Operations ML20237E6031998-08-27027 August 1998 Insp Rept 70-7001/98-14 on 980803-07.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20236Y1151998-08-0505 August 1998 Insp Rept 70-7001/98-11 on 980609-0720.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236R2261998-07-14014 July 1998 Insp Rept 70-7001/98-12 on 980622-26.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance & Plant Support ML20236F8241998-06-30030 June 1998 Insp Rept 70-7001/98-09 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20249B0681998-06-15015 June 1998 Insp Rept 70-7001/98-10 on 980518-22.Violation Noted. Major Areas Inspected:Maint & Plant Support ML20216B9231998-05-0707 May 1998 Insp Rept 70-7001/98-06 on 980310-0420.Violation Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support ML20217L8551998-04-28028 April 1998 Insp Rept 70-7001/98-203 on 980330-0403.No Violations Noted. Major Areas Inspected:Chemical Process Safety Insp of Paducah Gaseous Diffusion Plant,In Paducah,Ky on 980330-0403 ML20217D9071998-04-22022 April 1998 Insp Rept 70-7001/98-08 on 980331-0402.No Violations Noted. Major Areas Inspected:Evaluation of Certificatee Performance During Plant Biennial Exercise of Emergency Plan ML20216B0491998-04-0808 April 1998 Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted. Major Areas Inspected:Operations & Training ML20216B6671998-04-0606 April 1998 Insp Rept 70-7001/98-03 on 980120-0309.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Surveillance & Engineering ML20217G7901998-03-27027 March 1998 Insp Rept 70-7001/98-04 on 980223-27.No Violations Noted. Major Areas Inspected:Provided follow-up on 970505-09 Security Insp Findings at Paducah Plant That Resulted in Escalated Enforcement & Review of Physical Security Plan ML20217G7331998-03-27027 March 1998 Insp Rept 70-7001/97-10 on 970919-980216.No Violations Noted.Major Areas Inspected:Operational Controls,Maint Programs,Engineering Design,Event Root Cause Evaluation & Classification & Reporting of Event ML20217F2261998-03-26026 March 1998 Partially Withheld Insp Rept 70-7001/98-202 (Ref 10CFR2.790) on 980302-06.No Violations Noted.Details Withheld ML20248L7871998-03-17017 March 1998 Insp Rept 70-7001/98-05 on 980223-27.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20197A7771998-02-27027 February 1998 Insp Rept 70-7001/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Compliance Plan Issue Closure,Plantwide Implementation of NCS Controls,Compliance W/Criticality Safety Commitments & Internal Self Assessment ML20248L9291998-02-26026 February 1998 Insp Rept 70-7001/98-02 on 980120-30.Violations Noted.Major Areas Inspected:Engineering,Maint & Surveillance,Plant Support,Training Program & QA Program ML20202G3181998-02-12012 February 1998 Insp Rept 70-7001/97-14 on 971125-980120.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20198R3231998-01-13013 January 1998 Paritally Withheld Insp Rept 70-7001/97-210 on 971215-19. Details Withheld Per 10CFR2.790 IR 07100008/20110241997-12-0909 December 1997 Insp Rept 70-7001/97-11 on 971008-1124.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20202E8821997-11-28028 November 1997 Insp Rept 70-7001/97-208 on 970915-19 & 1103-07.Violations Noted.Major Areas Inspected:Mgt & Administrative Practices for Nuclear Criticality Safety,Plant Operations,Operating Procedures & Criticality Alarm Monitoring Sys ML20199K3151997-11-26026 November 1997 Insp Rept 70-7001/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Engineering,Maintenance & Surveillance & Plant Support ML20199H6571997-11-20020 November 1997 Insp Rept 70-7001/97-08 on 970826-1007.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20212D1231997-10-29029 October 1997 Partially Withheld Insp Rept 70-7001/97-209 on 970929-1003. Violations Noted.Details Withheld,Per 10CFR2.790 ML20212D2831997-10-27027 October 1997 Predecisional Enforcement Conference Rept 70-7001/97-13 on 971009.Major Areas Discussed:Uncontrolled Classified Matter in Areas Outside Paducah Plant Control Access Area or Available Individuals W/O Q or L Access Authorization ML20211Q8111997-10-17017 October 1997 Insp Rept 70-7001/97-01 on 970908-12.Violations Noted.Major Areas Inspected:Qa Program ML20211C7341997-09-24024 September 1997 Insp Rept 70-7001/97-07 on 970715-0912.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Security & Environ Protection ML20211D3991997-09-17017 September 1997 Insp Rept 70-7001/97-207 on 970818-22.No Violations Noted. Major Areas Inspected:Training Program,Facility walk- Through,Tracking Sys,Sprinkler Sys Lines,Surveillance Requirements & Inspector follow-up Items ML20198G5011997-08-21021 August 1997 Insp Rept 70-7001/97-206 on 970721-25.No Violations Noted. Major Areas Inspected:Chemical Process Safety Program Requirements ML20198F7291997-08-0505 August 1997 Insp Rept 70-7001/97-04 on 970603-0714.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20149J4391997-07-23023 July 1997 Predecisional Enforcement Conference Rept 97-7001/97-05 on 970716.Major Areas Discussed:Five Apparent Violations Noted in Insp Rept.W/Viewgraphs 1999-09-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20217B3271999-10-0606 October 1999 Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant Y2K Program,Including Mgt Planning,Implementation,Qa,Regulatory Considerations & Documentation,Per GL 98-03 ML20212K9301999-10-0404 October 1999 Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20212K9161999-10-0404 October 1999 Notice of Violation from Insp on 990720-0907.Violation Noted:Between 990720 & 0907,plant Staff Granted Personnel Unescorted Access to Controlled Access Area That Had Not Received General Employee or site-specific Training ML20212F1181999-09-22022 September 1999 Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security ML20212B6681999-09-15015 September 1999 Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted. Major Areas Inspected:Engineered Fire Protection Sys, Implementation of Administrative Fire Prevention Controls & Manual Fire Suppression Response Capabilities ML20211L8981999-09-0202 September 1999 Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted. Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20210P7521999-08-10010 August 1999 Notice of Violation from Insp on 990529-0719.Violation Noted:Between 990510 & 0601,plant Staff Did Not Promptly Notify Plant Shift Superintendent of Identified Problems & Conditions Associated with Process Bldg Fire Protection Sys ML20210P7671999-08-10010 August 1999 Insp Rept 70-7001/99-08 on 990529-0719.Violations Noted. Major Areas Inspected:Plant Operations,Engineering & Plant Support ML20209F0741999-07-0909 July 1999 Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted. Major Areas Inspected:Insp Noted That Operators Response to Small UF6 Release in Building C-337A Was Effective & Consistent with Guidance Provided in Alarm Response ML20196K1051999-07-0101 July 1999 Insp Rept 70-7001/99-07 on 990413-0528.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20196K5851999-05-10010 May 1999 Notice of Violation from Insp on 990413-0528.Violation Noted:Corporation Did Not Report to NRC Operations Ctr, within 24 Hours After Discovery of Event in Which Process Gas Leak Detection Sys Failed to Function as Designed ML20206E6591999-04-29029 April 1999 Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted. Major Areas Inspected:Plant Staff Took Appropriate Actions to Trip Process Motors for Cell Involved with Motor Fire Due to Failed motor-to speed-increaser Coupling ML20205R8141999-04-20020 April 1999 Partially Withheld Insp Rept 70-7001/99-201 on 990322-26. Details Withheld ML20205J3091999-04-0202 April 1999 Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted. Major Areas Inspected:Compliance with Certificate Holder Approved Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance ML20207K3091999-03-11011 March 1999 Insp Rept 70-7001/99-01 on 990113-0223.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20207G2711999-03-0505 March 1999 Notice of Violation from Insp on 981201-990112.Violation Noted:Certificatee Permitted Individuals to Have Access to Document Revealing Confidential Restricted Data Without Having Q or L Access Authorization ML20203G4231999-02-0909 February 1999 Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted. Major Areas Inspected:Plant Support ML20198K9661998-12-28028 December 1998 Notice of Violation from Insp on 981015-1130.Violation Noted:Discharge Bellows Pressure for Number 1 Normetex Withdrawal Pump in Bldg C-315 Exceeded 45 Psia as Pump Transitioned from Mode 2 to Mode 3 ML20198H8891998-12-21021 December 1998 Insp Rept 70-7001/98-17 on 981015-1130.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20196C2311998-11-24024 November 1998 Notice of Violation from Insp on 980721-0901.Violation Noted:Discharge Bellows Pressure for 2 Normetex Withdrawal Pump in Bldg C-315 Exceeded 45 Psia as Pump Transitioned from Mode 2 Withdrawal to Mode 3 Standby ML20203B7561998-11-17017 November 1998 EN-98-066:informs Commission That Staff Intends to Exercise Enforcement Discretion by Refraining from Issuance of Proposed Civil Penalty to Us Enrichment Corp for Violation Involving Failure to Limit Discharge Below Pressure ML20154R1421998-10-22022 October 1998 Partially Withheld Insp Rept 70-7001/98-206 on 980928-1002. Details Withheld,Per 10CFR2.790 ML20155A4341998-10-22022 October 1998 Insp Rept 70-7001/98-205 on 980915-18.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant High Risk Chemical Release Possibilities That May Occur as Result of Seismic Initiating Event ML20154R8351998-10-21021 October 1998 Insp Rept 70-7001/98-16 on 980902-1014.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154P5181998-10-16016 October 1998 Insp Rept 70-7001/98-13 on 980721-0901.Violations Noted. Major Areas Inspected:Plant Operations,Main Surveillance, Engineering & Plant Support ML20154P5141998-10-16016 October 1998 Notice of Violations from Insp on 980721-0901.Violations Noted:Corporation Failed to Incorporate ASME NQA-1-1989 Supplemental Requirements Associated with Design Control & Measuring & Test Equipment Into QAP ML20195D4511998-10-16016 October 1998 EN-98-060B:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Decision Is Based On,Among Other Reasons,Certificate Holder Corrective Action ML20154J7571998-10-0909 October 1998 Insp Rept 70-7001/98-15 on 980908-11.No Violations Noted. Major Areas Inspected:Maint & Surveillance & Plant Support ML20195D2531998-09-23023 September 1998 EN-98-060A:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Staff Decided to Defer Issuing Action Until Action Verified ML20153B3451998-09-16016 September 1998 Insp Rept 70-7001/98-204 on 980831-0903.No Violations Noted. Major Areas Inspected:Ncs Related Open Items,Corrective Actions & Corrective Action Tracking,Criticality Safety & Plant Operations ML20195C6631998-09-11011 September 1998 EN-98-060:informing That on 980918 NRC Intends to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose CP for Severity Level III Problem Re Nonconservative Assumption in SAR ML20237E6031998-08-27027 August 1998 Insp Rept 70-7001/98-14 on 980803-07.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20236Y1151998-08-0505 August 1998 Insp Rept 70-7001/98-11 on 980609-0720.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236Y1101998-08-0505 August 1998 Notice of Violation from Insp on 980609-0720.Violation Noted:As of 980627,Corporation Failed to Identify,Review & Translate Design Requirements,Associated W/Installation of Bldg C-710 Criticality Accident Alarm Sys ML20236R2261998-07-14014 July 1998 Insp Rept 70-7001/98-12 on 980622-26.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance & Plant Support ML20236F8241998-06-30030 June 1998 Insp Rept 70-7001/98-09 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20236F8221998-06-30030 June 1998 Notice of Violation from Insp on 980420-0608.Violation Noted:Between 980414 & 0513,Corporation Failed to Implement, as Soon as Practical,Interim Nuclear Criticality Safety Spacing Controls for Bldg C-333 Wet Air Pump Piping Elbows ML20249B0671998-06-15015 June 1998 Notice of Violation from Insp on 980518-22.Violation Noted: Design Analysis & Calculations Rept DAC-815-19938-0001,dtd 980120 Documented Existing Rail Stops on Levelator Would Not Prevent Rolling Scale Cart & Carried Cylinder Off End ML20249B0681998-06-15015 June 1998 Insp Rept 70-7001/98-10 on 980518-22.Violation Noted. Major Areas Inspected:Maint & Plant Support ML20216B9231998-05-0707 May 1998 Insp Rept 70-7001/98-06 on 980310-0420.Violation Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support PNO-III-98-029, on 980428,empty UF6 Cylinder Arrived from Starmet of Sc with Radioactive Contamination on Surface of Cylinder.Certificatee Decontaminated Cylinder1998-04-30030 April 1998 PNO-III-98-029:on 980428,empty UF6 Cylinder Arrived from Starmet of Sc with Radioactive Contamination on Surface of Cylinder.Certificatee Decontaminated Cylinder ML20217L8551998-04-28028 April 1998 Insp Rept 70-7001/98-203 on 980330-0403.No Violations Noted. Major Areas Inspected:Chemical Process Safety Insp of Paducah Gaseous Diffusion Plant,In Paducah,Ky on 980330-0403 ML20217D9071998-04-22022 April 1998 Insp Rept 70-7001/98-08 on 980331-0402.No Violations Noted. Major Areas Inspected:Evaluation of Certificatee Performance During Plant Biennial Exercise of Emergency Plan ML20216B0491998-04-0808 April 1998 Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted. Major Areas Inspected:Operations & Training ML20216B6591998-04-0606 April 1998 Notice of Violation from Insp on 980120-0309.Violation Noted:Plant Shift Superintendent Did Not Implement Requirements of Procedure UE2-TO NS1032 for Inoperable UF6 Detection Sys in Building C-333A W/Autoclaves ML20216B6671998-04-0606 April 1998 Insp Rept 70-7001/98-03 on 980120-0309.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Surveillance & Engineering ML20217G7901998-03-27027 March 1998 Insp Rept 70-7001/98-04 on 980223-27.No Violations Noted. Major Areas Inspected:Provided follow-up on 970505-09 Security Insp Findings at Paducah Plant That Resulted in Escalated Enforcement & Review of Physical Security Plan ML20217G7331998-03-27027 March 1998 Insp Rept 70-7001/97-10 on 970919-980216.No Violations Noted.Major Areas Inspected:Operational Controls,Maint Programs,Engineering Design,Event Root Cause Evaluation & Classification & Reporting of Event ML20217F2261998-03-26026 March 1998 Partially Withheld Insp Rept 70-7001/98-202 (Ref 10CFR2.790) on 980302-06.No Violations Noted.Details Withheld ML20217C0841998-03-24024 March 1998 Notice of Violation from NRC Review of Pgdp Certificate Amend Request - Update to Application SAR Dtd 970818. Violation Noted:On 970817,USEC Did Not Submit Amend to Certification Application Which Includes Listed Info 1999-09-22
[Table view] |
Text
. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ _ - _ - _ - - _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _
s T
U.S. NUCLEAR REGULATORY COMMISSION REGION ll1 l
1 Docket No: 70-7001 Certificate No: GDP-1 Report No: 70-7001/98014(DNMS) l l
Facility Operator: United States Enrichment Corporation i I
Facility Name: Paducah Gaseous Diffusion Plant Location: 5600 Hobbs Road i
P.O. Box 1410 I
Paducah, KY 42001 Dates: August 3 through 7,1998 l
Inspector: David J. Hartland, Portsmouth Senior Resident Inspector Approved By: Timothy D. Reidinger, Acting Chief Fuel Cycle Branch Division of Nuclear Materials Safety 9909010065 990927 PDR ADOCK 07007001 C PDR L _ _ _
EXECUTIVE
SUMMARY
United States Enrichment Corporation Paducah Gaseous Diffusion Plant NRC Inspection Report 70-7001/98014(DNMS)
Plant Operations
. The inspector determined that the plant staff properly implemented the Technical Safety Requirement-specified moderation controls for two cascade uranium deposits that were greater than sa'e mass.
. The inspector determined that cascade operators properly postponed the performance of a Technical Safety Requirement freezer / sublimer surveillance and maintained the equipment in an htperable status based upon an absence of proper test conditions.
However, the staff did not immediately document the off normal condition for further management review.
Maintenance
. The inspector determined that a post-maintenance test of the Building C-310 Criticality Accident Alarm System was well controlled with a proper level of first line management oversight. In addition other work packages reviewed were noted to include appropriate procedures and drawings for the beyond " skill-of-the-craft" work activities.
Enaineerina
. The inspector identified a minor violation.in that the plant staff connected a portable charger to a cascade battery bank without first performing required safety reviews and approvals.
l t
2 L _ __ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ ___ _ _ _ _ _
Report Details
- 1. Operations 01 Conduct of Operations 01.1 Observation of Onaoina Operations
- a. Inspection Scope (88100)
The inspector conducted field reviews of ongoing operations to verify compliance with the Technical Safety Requirements (TSRs) and other requirements,
- b. Observations and Findinos Greater-Than-Safe-Mass Uranium Deposits On August 3, the plant staff identified a greater-than-safe-mass uranium deposit in the Building C-335, Number 2 Purge and Evacuation (P&E) Cooler during the conduct of routine non-destructive analyses. Following identification of the deposit, the inspector confirmed that the plant staff established a dry gas blanket at greater than 14 pounds force per square inch absolute (psla) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in accordance with TSR 2.4.4.4,
" Moderation Control," Action Statement B. The inspector also determined that the plant staff drained the cooler recirculating cooling water (RCW) as required by TSR 2.4.4.4, Action Statement C.
During review of the staff's actions, the inspector noted that another greater-than-safe-mass uranium deposit was previously identified in the Building C-335, Number 1 P&E Cooler. The inspector determined that the deposit was currently being maintained in a fluorinating environment in accordance with Action Statement A of TSR 2.4.4.4. The inspector also verified that the surveillance requirements of TSR 2.4.4.4 were properly
. incorporated in a new Procedure CP4-CO-ON3045," Handling And Tracking Uranium
' Deposits."
Freezer / Sublimer Surveillance On August 4, the inspector observed the plant staff conduct a routine surveillance associated with a Building C-331 cascade freezer / sublimer (F/S). Thesurveillance was conducted in accordance with Procedure CP4-CO-6040K, "TSR Surveillance-Freezer / Sublimer Safety System Hi-Hi Weight Trip Test." The inspector observed that the operators were unable to place the F/S in Mode 3 (Cold Standby), a prerequisite for initiating the testing. The operators investigated the situation and determined that the F/S could not be placed in Mode 3 due to a conflict between a prerequisite for the mode and the current building RCW status. Specifically, the F/S control system required the RCW system low temperature to be greater than 85 degrees Fahrenheit. However, the building staff were maintaining the RCW temperature below the low temperature t-ip setpoint in order to provide additional cooling to plant air compressors co-located in the building.
i l
3
-_-__-__-__-.__.m_ _ .
Based upon the results of the investigation, the plant staff postponed the surveillance and placed the F/S in Mode 6 (Out of Service) pending resolution of the conflict between the surveillance test prerequisite and the current plant conditions. Although the plant staff's actions appeared appropriate, the inspector noted that the plant staff did not initiate a plant nonconformance document, Action and Tracking Report, to document the issue for further management review and consideration of the potential generic impacts until several days after the event.
- c. Conclusions The inspector determined that the plant staff properly implemented the Technical Safety Requirement-specified moderation controls for two cascade uranium deposits that were greater than safe mass. The inspector also determined that cascade operators properly postponed the performance of a Technical Safety Requirement-related freezer / sublimer surveillance and maintainea the equipment in an inoperable status based upon an absence of proper test conditions. However, the staff did not immediately document the off-normal condition for further management review.
II. Maintenance M1 Conduct of Maintenance M1.1 Review of Maintenance Activities
- a. Inspection Scope (88025)
The inspector observed maintenance activities and reviewed s,everal work packages to verify compliance with procedural and other requirements,
- b. Observations and Findinas On August 5, the inspector observed testing of the Building C-310 Criticality Accident Alarm System per Paragraph 8.1 of Procedure CP4-GP-lM6209, " Criticality Accident Alarm System Functional Tests," following a cluster replacement. The inspector determined that the evolution was performed in accordance with the procedure, was ws!!
coordinated, and was conducted with a good level of oversight by the maintenance first line manager.
The inspector also reviewed several safety-related, "Q" work packages associated with work in Buildings C-333A and C-360. The inspector noted that complex activities, requiring instructions beyond " skill-of-the-craft," appropriately referenced approved drawings and procedures. The inspector verified that signatures and other data were properly documented in the packages.
- c. Conclusions The inspector determined that a post-maintenance test of the Building C-310 Criticality Accident Alarm System was well controlled with a proper level of first line management oversight. In addition, other work packages reviewed were noted to include appropriate procedures and drawings for the beyond " skill-of-the-craft" work activities.
4
111. Enaineerina E2 Engineering Support of Facilities and Equipment E2.1 Installation of a Portable Charaer in Buildina C-333
- a. Inspection Scope (88101)
The inspector reviewed the resolution of technicalissues to verify compliance with the design basis.
- b. Observations and Findinas On August 4, the inspector observed that the plant staff had connected a portable charger to a Building C-333 Unit 3 Battery. The Unit 3 Battery had previously been cross-tied to the Unit 2 Battery following a failure of the Unit 2 Battery rectifier.
The plant staff installed the portable charger because 125 VDC loads, transferred from the rectifier to the battery following the rectifier failure, were supplied through the center tap of the 250 VDC battery. The load alignment resulted in an imbalance between the two sections of the battery bank. As a result, the battery discharged to a condition where one section had higher than normal voltage and the other half section had lower than normal voltage. The portable charger was used in parallel with the main charger to supply the load being drawn at the center tap and equalize the current required by the discharged cells. In addition to the normal building emergency lighting load, the battery supplied power for the area control room process gas leak detection system alarms a safety-related load.
' The inspector noted that the portable battery charger was installed using a maintenance work package. The package referenced Engineering Notice EN-C-822-97-095, Revision 0, to provide detailed instructions for charger operations. The inspector determined that the work instructions and engineering notice did not receive a 10 CFR 76.68 safety review. The inspector concluded that the installation of the portable charger to supply load for and maintain a charge on the battery constituted a temporary modification that required the safety reviews and approvals.
As immediate corrective action, operations management issued a long-term order that placed a hold the further installation of portable chargers until the required reviews and approvals were completed in addition, engineering management issued a memo to the work control organization to re-enforce a standing prohibition against the use of engineering notices as work instructions in lieu of procedures.
Title 10 of the Code of Federal Regulations, Part 76.68, requires, in part, that changes made to the plant shall be evaluated to ensure that the changes are consistent with the current safety basis and shall be reviewed by plant management. The failure to perform required safety reviews and approvals for the installation of the battery charger is a violation 10 CFR 76.68. However, since the violation did not result in a significant safety consequence, and because the plant staff took immediate action to resolve both the immediate and genedc aspects of the violation, the failure is being treated as a Violation of Minor Significance not subject to formal enforcement action, consistent with Section IV of the NRC Enforcement Policy (NUREG-1600, Revision 1). (NCV 70-l 7001/98014-01).
5
c. Conclusion
The inspector identified a minor violation in that the plant staff made a temporary modification through the installation of a portable battery charger in Building C-333 without first performing required safety evaluations and management reviews.
V. Manaaement Meetinas X1 Exit Meeting Summary The inspector presented the inspection results to members of the plant staff and management at the conclusion of the inspections on August 7,1998. Plant staff acknowledged the findings presented at the meeting. The inspector asked the plant staff whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
6 l
t
l PARTIAL LIST OF PERSONS CONTACTED United States Enrichment Corporation J. Labarraque, Safety, Safeguards and Quality Manager 1
Lockheed Martin Utility Services l
K. Ahem, Engineering Manager I M. Buckner, Operations Manager l L Jackson, Nuclear Regulatory Affairs Manager l S. Penrod, Enrichment Plant Manager l
H. Pulley, General Manager i 1
INSPECTION PROCEDURES USED IP 88025: Maintenance and Surveillance Testing l lP 88100:' Plant Operations IP 88101: Configuration Control ITEMS OPENED, CLOSED AND DISCUSSED Opened l 1
None l l
Closed 70-7002/98014-01 NCV Failure To Perform 10 CFR 76.68 Review Prior To Installing Portable Battery Charger l
' Discussed .
=None l
l l
i I
7
)