Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217B327 | 6 October 1999 | Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant Y2K Program,Including Mgt Planning,Implementation,Qa,Regulatory Considerations & Documentation,Per GL 98-03 | |
ML20212K930 | 4 October 1999 | Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support | Enforcement Discretion |
ML20212F118 | 22 September 1999 | Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security | |
ML20212B668 | 15 September 1999 | Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted. Major Areas Inspected:Engineered Fire Protection Sys, Implementation of Administrative Fire Prevention Controls & Manual Fire Suppression Response Capabilities | Hydrostatic Fire Protection Program Fire Watch |
ML20211L898 | 2 September 1999 | Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted. Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress | Job Performance Measure |
ML20210P767 | 10 August 1999 | Insp Rept 70-7001/99-08 on 990529-0719.Violations Noted. Major Areas Inspected:Plant Operations,Engineering & Plant Support | |
ML20209F074 | 9 July 1999 | Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted. Major Areas Inspected:Insp Noted That Operators Response to Small UF6 Release in Building C-337A Was Effective & Consistent with Guidance Provided in Alarm Response | |
ML20196K105 | 1 July 1999 | Insp Rept 70-7001/99-07 on 990413-0528.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Foreign Material Exclusion |
ML20206E659 | 29 April 1999 | Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted. Major Areas Inspected:Plant Staff Took Appropriate Actions to Trip Process Motors for Cell Involved with Motor Fire Due to Failed motor-to speed-increaser Coupling | |
ML20205R814 | 20 April 1999 | Partially Withheld Insp Rept 70-7001/99-201 on 990322-26. Details Withheld | |
ML20205J309 | 2 April 1999 | Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted. Major Areas Inspected:Compliance with Certificate Holder Approved Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance | |
ML20207K309 | 11 March 1999 | Insp Rept 70-7001/99-01 on 990113-0223.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Water Inventory Control Missed surveillance |
ML20203G423 | 9 February 1999 | Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted. Major Areas Inspected:Plant Support | |
ML20198H889 | 21 December 1998 | Insp Rept 70-7001/98-17 on 981015-1130.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Enforcement Discretion Condition Adverse to Quality |
ML20154R142 | 22 October 1998 | Partially Withheld Insp Rept 70-7001/98-206 on 980928-1002. Details Withheld,Per 10CFR2.790 | |
ML20155A434 | 22 October 1998 | Insp Rept 70-7001/98-205 on 980915-18.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant High Risk Chemical Release Possibilities That May Occur as Result of Seismic Initiating Event | Earthquake |
ML20154R835 | 21 October 1998 | Insp Rept 70-7001/98-16 on 980902-1014.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Earthquake |
ML20154P518 | 16 October 1998 | Insp Rept 70-7001/98-13 on 980721-0901.Violations Noted. Major Areas Inspected:Plant Operations,Main Surveillance, Engineering & Plant Support | Water Inventory Control Enforcement Discretion |
ML20154J757 | 9 October 1998 | Insp Rept 70-7001/98-15 on 980908-11.No Violations Noted. Major Areas Inspected:Maint & Surveillance & Plant Support | |
ML20153B345 | 16 September 1998 | Insp Rept 70-7001/98-204 on 980831-0903.No Violations Noted. Major Areas Inspected:Ncs Related Open Items,Corrective Actions & Corrective Action Tracking,Criticality Safety & Plant Operations | Condition Adverse to Quality |
ML20237E603 | 27 August 1998 | Insp Rept 70-7001/98-14 on 980803-07.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering | Temporary Modification Emergency Lighting |
ML20236Y115 | 5 August 1998 | Insp Rept 70-7001/98-11 on 980609-0720.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support | Water Inventory Control Missed surveillance |
ML20236R226 | 14 July 1998 | Insp Rept 70-7001/98-12 on 980622-26.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance & Plant Support | |
ML20236F824 | 30 June 1998 | Insp Rept 70-7001/98-09 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support | Condition Adverse to Quality |
ML20249B068 | 15 June 1998 | Insp Rept 70-7001/98-10 on 980518-22.Violation Noted. Major Areas Inspected:Maint & Plant Support | |
ML20216B923 | 7 May 1998 | Insp Rept 70-7001/98-06 on 980310-0420.Violation Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support | Hydrostatic Enforcement Discretion Design basis earthquake Earthquake |
ML20217L855 | 28 April 1998 | Insp Rept 70-7001/98-203 on 980330-0403.No Violations Noted. Major Areas Inspected:Chemical Process Safety Insp of Paducah Gaseous Diffusion Plant,In Paducah,Ky on 980330-0403 | |
ML20217D907 | 22 April 1998 | Insp Rept 70-7001/98-08 on 980331-0402.No Violations Noted. Major Areas Inspected:Evaluation of Certificatee Performance During Plant Biennial Exercise of Emergency Plan | |
ML20216B049 | 8 April 1998 | Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted. Major Areas Inspected:Operations & Training | |
ML20216B667 | 6 April 1998 | Insp Rept 70-7001/98-03 on 980120-0309.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Surveillance & Engineering | Enforcement Discretion |
ML20217G790 | 27 March 1998 | Insp Rept 70-7001/98-04 on 980223-27.No Violations Noted. Major Areas Inspected:Provided follow-up on 970505-09 Security Insp Findings at Paducah Plant That Resulted in Escalated Enforcement & Review of Physical Security Plan | |
ML20217G733 | 27 March 1998 | Insp Rept 70-7001/97-10 on 970919-980216.No Violations Noted.Major Areas Inspected:Operational Controls,Maint Programs,Engineering Design,Event Root Cause Evaluation & Classification & Reporting of Event | |
ML20217F226 | 26 March 1998 | Partially Withheld Insp Rept 70-7001/98-202 (Ref 10CFR2.790) on 980302-06.No Violations Noted.Details Withheld | |
ML20248L787 | 17 March 1998 | Insp Rept 70-7001/98-05 on 980223-27.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Foreign Material Exclusion |
ML20197A777 | 27 February 1998 | Insp Rept 70-7001/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Compliance Plan Issue Closure,Plantwide Implementation of NCS Controls,Compliance W/Criticality Safety Commitments & Internal Self Assessment | |
ML20248L929 | 26 February 1998 | Insp Rept 70-7001/98-02 on 980120-30.Violations Noted.Major Areas Inspected:Engineering,Maint & Surveillance,Plant Support,Training Program & QA Program | Condition Adverse to Quality |
ML20202G318 | 12 February 1998 | Insp Rept 70-7001/97-14 on 971125-980120.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Unanalyzed Condition |
ML20198R323 | 13 January 1998 | Paritally Withheld Insp Rept 70-7001/97-210 on 971215-19. Details Withheld Per 10CFR2.790 | |
IR 07100008/2011024 | 9 December 1997 | Insp Rept 70-7001/97-11 on 971008-1124.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | Time of Discovery Uranium Hexafluoride |
ML20202E882 | 28 November 1997 | Insp Rept 70-7001/97-208 on 970915-19 & 1103-07.Violations Noted.Major Areas Inspected:Mgt & Administrative Practices for Nuclear Criticality Safety,Plant Operations,Operating Procedures & Criticality Alarm Monitoring Sys | Emergency Lighting Condition Adverse to Quality |
ML20199K315 | 26 November 1997 | Insp Rept 70-7001/97-12 on 971006-10.Violations Noted. Major Areas Inspected:Engineering,Maintenance & Surveillance & Plant Support | |
ML20199H657 | 20 November 1997 | Insp Rept 70-7001/97-08 on 970826-1007.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support | Time of Discovery |
ML20212D123 | 29 October 1997 | Partially Withheld Insp Rept 70-7001/97-209 on 970929-1003. Violations Noted.Details Withheld,Per 10CFR2.790 | |
ML20212D283 | 27 October 1997 | Predecisional Enforcement Conference Rept 70-7001/97-13 on 971009.Major Areas Discussed:Uncontrolled Classified Matter in Areas Outside Paducah Plant Control Access Area or Available Individuals W/O Q or L Access Authorization | Condition Adverse to Quality |
ML20211Q811 | 17 October 1997 | Insp Rept 70-7001/97-01 on 970908-12.Violations Noted.Major Areas Inspected:Qa Program | |
ML20211C734 | 24 September 1997 | Insp Rept 70-7001/97-07 on 970715-0912.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Security & Environ Protection | |
ML20211D399 | 17 September 1997 | Insp Rept 70-7001/97-207 on 970818-22.No Violations Noted. Major Areas Inspected:Training Program,Facility walk- Through,Tracking Sys,Sprinkler Sys Lines,Surveillance Requirements & Inspector follow-up Items | Hydrostatic Fire Watch |
ML20198G501 | 21 August 1997 | Insp Rept 70-7001/97-206 on 970721-25.No Violations Noted. Major Areas Inspected:Chemical Process Safety Program Requirements | Grace period |
ML20198F729 | 5 August 1997 | Insp Rept 70-7001/97-04 on 970603-0714.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support | |
ML20149J439 | 23 July 1997 | Predecisional Enforcement Conference Rept 97-7001/97-05 on 970716.Major Areas Discussed:Five Apparent Violations Noted in Insp Rept.W/Viewgraphs |