Application for Amend to CPPR-135 & CPPR-136 Requesting Partial Exemption from GDC 4,per 10CFR50,App A.Schedular Exemption Will Apply Until End of Second Refueling Outage or Rulemaking Changes to GDC 4 Made.Fee Paid
ML20209E849
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/10/1985
From: Derrickson W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SBN-840, NUDOCS 8507120316
Download: ML20209E849 (2)


Text

_ -

7 William B. Derrickson Senior Vice President Nuclear Energy 4

Put2c Service of New Hampshire July 10, 1985 NEW HAMPSHIRE YANKEE DIVISION SBN- 840 T.F. B6.1.10 NHY #850562 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. H. R. Denton

References:

(a) Construction Permit CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444.

(b) PSNH Letter, SBN-703 dated August 9, 1984,

" Alternate Pipe Break Design Criteria".

J. DeVincentis to G. W. Knighton.

(c) PSNH Letter, SBN-705 dated August 21, 1984,

" Safety Evaluation Report (SER) Outstanding Issue No. 5, ' Load Combinations, Design Tran-sients, and Stress Limits'", J. DeVincentis to G. W. Knighton.

(d) PSNH Letter, SBN-756 dated January 21, 1985

" Reactor Coolant Loop Pipe Break Elimination Benefits Summary", J. DeVincentis to G. W.

Knighton.

(e) USNRC Letter dated June 1985, " Exemption from 10CFR50, Appendix A. General Design Criterion 4 (GDC-4), G. W. Knighton to R. J. Harrison.

Subject:

Application for Amendment to Construction Permits; Exemption from 10CFR50, Appendix, General Design Criterion 4 (GDC-4)

Dear Sir:

Pursuant to Reference (c), Public Service Company of New llampshire et al, hereby modifies the prior request for partial exemption from the require-g ments of 10CFR50 Appendix A. General Design Criterion 4 (CDC-4) as provided

  1. m in References (c) and (d). Said request shall be modified from a permanent

'; @ exemption (for the lifetime of the plant) to a schedular exemption (pending '

oo rule making changes to GDC-4). We also request that this schedular exemption on apply until the end of the second refueling outage or completion of rule making 80 changes to CDC-4, whichever is later.

M eu no Public Service Company of New Hampshire, et al, as they are the Joint O@ Holders of, and Permittees under Construction Permits Nos. CPPR-135 and CPPR-136 y also hereby apply, pursuant to 10CFR Section 50.90, for an amendment to the above om numbered Construction Permits to reficct the above requested exemption from CDC-4.

$ 4- We request that pertinent parts of the Construction Permits be amended to read as follows. (Note: Wording added has been highlighted by means of underlining.)

y L A - t 1 2.1 6*y P.O. Box 300 f/@ 8 Seabrook,NH03874 Telephone (603)474-9521 qo

ir** Paga 2

, Attentient- Mr. H. R. Denton Construction Permit - Paragraph 3 This permit shall be deemed to contain and be subject to the con-ditions specified in Sections 50.54 and 50.55 of said regulations; is subject to all applicable provisions of the Act, and rules, re-gulations, and orders of the Commission now or hereaf ter in ef fect except to the extent applicants obligations thereunder may be modi-fled by duly authorized exemptions, and is subject to the conditions specified or incorporated below:

Construction Permit - Paragraph 3.C This construction permit authorizes the applicants to construct the '

facility described in the application and the hearing record, in ac-cordance with the principal architectural and engineering criteria

~(except to the extent modifications of such criteria may be duly authorized by exemption), and environmental protection commitments set forth therein.

In brief, if the amendment were granted, it would afford the Permittees partial exemption from 10CFR50, Appendix A, General Design Criterion 4 (GDC-

4) as it applies to the postulation of longitudinal and circumferential pipe breaks in the Reactor Coolant System primary loop piping (hot leg, cold leg, and crossover leg piping). The effect said amendment would have on plant de-sign (e.g. eliminate pipe whip restraints), the benefits and the technical foundation for Permittees' request has been discussed in detail in Reference (c) and (d) which are hereby incorporated by reference into this application.

In order that activities related to this issue (e.g. Class 1 piping functionality - SER Open Item #5) are not affected, we request written noti-fication, that our exemption request has been granted by July 31, 1985.

The application fee (150.00) required by 10CFR170.12(c) is remitted herein.

Very truly yours, William B. Derrickson cc: Atomic Safety and Licensing Board Service List State of New Hampshire, Seabrook Then personally appeared before me, W. B. Derrickson, who, being duly sworn, did state that he is a Senior Vice President of Public Service Company of New Hampshire, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Public Service Company of New Hampshire, and that the statements therein are true to the best of his knowledge and belief.

^

{Q Beverly E. Sittoway Notarg)Public N.

My Commission Expires March 6, 1990 L