Safeguards Evaluation Rept Supporting Amend to Allow Time Extension to Fundamental Nuclear Matl Control PlanML20203B342 |
Person / Time |
---|
Site: |
07000036 |
---|
Issue date: |
01/27/1999 |
---|
From: |
Horn M NRC |
---|
To: |
|
---|
Shared Package |
---|
ML20203B302 |
List: |
---|
References |
---|
NUDOCS 9902100279 |
Download: ML20203B342 (2) |
|
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217M1641999-10-19019 October 1999 Safeguards Evaluation Rept Accepting Amend 29 to License SNM-33 for Abb Combustion Engineering Nuclear Power,Inc ML20211B4431999-08-19019 August 1999 SER Accepting Amend 28 to License SNM-33 for Abb Combustion Engineering Nuclear Power,Inc ML20195D0281999-06-0202 June 1999 Safeguards Evaluation Rept Approving Request for Time Extension to Rept Results of Physical Inventory ML20196L2831999-05-10010 May 1999 Safety Evaluation Supporting Amend 25 to License SNM-33 ML20205P5591999-04-0909 April 1999 Safety Evaluation Rept Approving Amend Request Dtd 990312, Re Changes to Mailing Addresses ML20205M5241999-03-18018 March 1999 Safety Evaluation Supporting Amend 23 to License SNM-33 ML20203B3421999-01-27027 January 1999 Safeguards Evaluation Rept Supporting Amend to Allow Time Extension to Fundamental Nuclear Matl Control Plan ML20236V0381998-07-23023 July 1998 Safety Evaluation Supporting Amend 21 to License SNM-33 ML20199F9111998-01-26026 January 1998 SER Supporting Amend 18 to License SNM-33 ML20217R0041997-08-13013 August 1997 SER Recommending Approval of Amend Application ML20059G6481994-01-0707 January 1994 Safety Evaluation Supporting Amend 27 to License SNM-33 ML20059C1811993-12-22022 December 1993 SER Supporting Amend 26 to License SNM-33 ML20058N7971993-12-0707 December 1993 Safety Evaluation Supporting Amend 25 to License SNM-33 ML20248B5211989-07-28028 July 1989 SER Accepting 890322 Application for Amend to License SNM-33 Re Startup & Test of New Pellet Production Lines & Use of Addl Warehouse Space ML20246P1291989-05-10010 May 1989 SER Supporting 890210 Application for Amend to License SNM-33,modifying One of Three Conversion Reactors.Approval of Amend Application Recommended ML20206B3701988-11-0707 November 1988 SER Recommending Approval of 881010 Application for Amend to License SNM-33 ML20195D7821988-10-31031 October 1988 SER Re 881012 Amend Application Concerning Release of Bldgs 250 & 251 for Unrestricted Use & Concerning Const of Addl Mfg Space ML20204C7211988-10-13013 October 1988 SER Supporting 881011 Application for Amend to License SNM-33 Re Storage in Facility Addition (Bldg 256) ML20195J5571988-06-16016 June 1988 SER Supporting 880429 Revised License Amend Application & 880606 Suppl Re Processing U Containing Up to 5% U-235 ML20216J3071987-06-26026 June 1987 SER Supporting Amend 6 to License SNM-33 to Revise Handling Procedures ML20203E4221986-04-17017 April 1986 SER Supporting Amend 5 to License SNM-33,increasing Possession Limit for Source Matl to 50,000 Kg for Onsite Storage of UF6 in 10-ton Cylinders ML20054J4531982-06-0909 June 1982 Safety Evaluation Supporting Amend 8 to License SNM-0033 ML20054E8131982-06-0808 June 1982 Safety Evaluation Supporting Proposed Amend to License SNM-0033,incorporating Radiological Contingency Plan 1999-08-19
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217M1641999-10-19019 October 1999 Safeguards Evaluation Rept Accepting Amend 29 to License SNM-33 for Abb Combustion Engineering Nuclear Power,Inc ML20217F0561999-09-30030 September 1999 Criticality Safety Program Update Eighth Status Rept for 990401-990930 ML20211B4431999-08-19019 August 1999 SER Accepting Amend 28 to License SNM-33 for Abb Combustion Engineering Nuclear Power,Inc ML20195D0281999-06-0202 June 1999 Safeguards Evaluation Rept Approving Request for Time Extension to Rept Results of Physical Inventory ML20212H4941999-05-26026 May 1999 Second Sampling Event in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization ML20196L2831999-05-10010 May 1999 Safety Evaluation Supporting Amend 25 to License SNM-33 ML20205P5591999-04-0909 April 1999 Safety Evaluation Rept Approving Amend Request Dtd 990312, Re Changes to Mailing Addresses ML20205M1121999-03-31031 March 1999 Criticality Safety Program Update Seventh Status Rept, for Period 981031-990331 ML20205M5241999-03-18018 March 1999 Safety Evaluation Supporting Amend 23 to License SNM-33 ML20203B3421999-01-27027 January 1999 Safeguards Evaluation Rept Supporting Amend to Allow Time Extension to Fundamental Nuclear Matl Control Plan ML20154B1891998-09-30030 September 1998 Criticality Safety Program Update Sixth Status Rept, for Period Mar-Sept 1998 ML20236V0381998-07-23023 July 1998 Safety Evaluation Supporting Amend 21 to License SNM-33 ML20216C2391998-03-31031 March 1998 Criticality Safety Program Update Fifth Status Rept 971001- 980331 ML20207H3041998-03-0808 March 1998 Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Page/Figure 10 of Incoming Submittal Not Included ML20202B1001998-02-0606 February 1998 Integrated Safety Assessment Hf Absorber/Scrubber Sys ML20199F9111998-01-26026 January 1998 SER Supporting Amend 18 to License SNM-33 ML20217R0041997-08-13013 August 1997 SER Recommending Approval of Amend Application ML20059G6481994-01-0707 January 1994 Safety Evaluation Supporting Amend 27 to License SNM-33 ML20059C1811993-12-22022 December 1993 SER Supporting Amend 26 to License SNM-33 ML20058N7971993-12-0707 December 1993 Safety Evaluation Supporting Amend 25 to License SNM-33 ML20248B5211989-07-28028 July 1989 SER Accepting 890322 Application for Amend to License SNM-33 Re Startup & Test of New Pellet Production Lines & Use of Addl Warehouse Space ML20246P1291989-05-10010 May 1989 SER Supporting 890210 Application for Amend to License SNM-33,modifying One of Three Conversion Reactors.Approval of Amend Application Recommended ML20247R6811989-03-31031 March 1989 Supplemental Environ Impact Info Re Revitalization of Nuclear Fuel Mfg Facility ML20206B3701988-11-0707 November 1988 SER Recommending Approval of 881010 Application for Amend to License SNM-33 ML20195D7821988-10-31031 October 1988 SER Re 881012 Amend Application Concerning Release of Bldgs 250 & 251 for Unrestricted Use & Concerning Const of Addl Mfg Space ML20204C7211988-10-13013 October 1988 SER Supporting 881011 Application for Amend to License SNM-33 Re Storage in Facility Addition (Bldg 256) ML20195J5571988-06-16016 June 1988 SER Supporting 880429 Revised License Amend Application & 880606 Suppl Re Processing U Containing Up to 5% U-235 ML20216J3071987-06-26026 June 1987 SER Supporting Amend 6 to License SNM-33 to Revise Handling Procedures ML20212E3501986-12-31031 December 1986 Decontamination of Evaporation Ponds ML20203E4221986-04-17017 April 1986 SER Supporting Amend 5 to License SNM-33,increasing Possession Limit for Source Matl to 50,000 Kg for Onsite Storage of UF6 in 10-ton Cylinders ML20054J4531982-06-0909 June 1982 Safety Evaluation Supporting Amend 8 to License SNM-0033 ML20054E8131982-06-0808 June 1982 Safety Evaluation Supporting Proposed Amend to License SNM-0033,incorporating Radiological Contingency Plan 1999-09-30
[Table view] |
Text
,
l .
sog a
[" k UNITED STATES j . 'e j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
'% # January 27, 1999 DOCKET: 70-36 I LICENSEE: Combustion Engineering Inc. ,
Hematite, Missouri i
SUBJECT:
SAFEG' LARDS EVALUATION REPORT: SUBMITTAL DATED JANUARY 8, !
1999, REQUEST FOR TIME EXTENSION TO THE FUNDAMENTAL NUCLEAR l MATERIAL CONTROL PLAN COMMITMENTS BACKGROUND By cover letter dated January 8,1998, ABB Combustion Engineering (CE) requested a one- l time amendment authorizing a time extension, beyond the normal 30-day time frame, for i completing receipt measurements and distributing related Nuclear Material Transaction Report DOE /NRC Form 741 with regard to seven UF, cylinders received from Siemens in December 1998. This amendment request, which relieves CE from commitments in Section 4.3.1 of its FNMC Plan, was processed following the provisions of 10 CFR 70.34.
DISCUSSION The material consists of seven 2.5-ton UF, cylinders at 4.0-4.9% enrichment levels. The cylinders, which were originally filled at the Portsmouth Gaseous Diffusion Plant, were shipped l to CE by another licensed facility, Siemens Nuclear Division in Richland, Washington. CE confirmed that the cylinders arrived at its site in inviolate and tamper-safe condition but without representative samples (P-10 tube samples) for measurement verification purposes. The absence of the samples is due to subsequent transfer between facilities.
CE used an alternative method for measurement verification allowed in Section 4.3.1 of its approved FNMC Plan by completing net weight determination and nominal weight fraction for uranium element, but cannot determine the U-235 content because the NDA equipment and procedures are not currently in place. Alternatively, CE plans to determine the U-235 content by analyzing a UO2F, sample withdrawn during the hydrolysis stage of the UF, conversion process. However, because of the material planning and production schedule, CE could not meet the 30-day requirement specified in Section 4.3.1 of its FNMC Plan, which requires CE to complete all confirmatory receipt measurements and distribute DOE /NRC Form 741 within the required time frame. Therefore, a time extension up to April 1,1999, has been requested. This requested extension of time is necessary and appropriate in order for the licensee to schedule resources and activities to accommodate the required measurements, and in particular CE does not intend to depart from commitments of its measurement and measurement control program.
l
- 9902100279 990127 I l PDR ADOCK 07000036 !
l C PM ,
l-1 -
l l e
. 2 ENVIRONMENTAL REVIEW The staff has determined that the requested time extension involves safeguards plan and material accountability which are categorically excluded from the requirements to prepare a site-specific environmental assessment. Therefore, in accordance with 10 CFR 51.22(c)(12),
neither an environmental assessment nor an environmental impact statement is warranted for this action.
CONCLUSION The staff concludes that granting the licensee's time extension request for completing receipt measurements and distributing DOE /NRC Form 741 of received UF, cylinders is justified and warranted, and that it will not reduce the effectiveness of the licensee's safeguards program.
Therefore, a temporary (one-time) Safeguards Condition SG-1.8 is being issued which allows for the extension of time.
4 1
The Operations Branch (FCOB) inspection staff has no objection to this proposed action.
1 PRINCIPAL CONTRIBUTOR Thomas N. Pham g gj e //2 ?/f f l