Text
,.-
Enclosure I to IM98/811 l
l i
l l
1 l
l CRITICALITY SAFETY PROGRAM UPDATE l
SIXTH STATUS REPORT l
l March,1998 - September,1998 COMBUSTION ENGINEERING,INC.
September 25,1998 l
l l
9810050123 980925 PDR ADOCK 07000036 C
l
' to RA98/811 1
J.
INTRODUCTION This report is the sixth periodic status report on the progress made in implementation of the CSPU plan. The first quarterly progress report was submitted on December 20,1996, the second on March 27,1997, the third on June 27,1997, the fourth on September 30,1997, and the fifth on March 31, 1998. Since the milestones for the remainder of the program were less frequent, it was agreed that subsequent status reports be submitted semiannually.
II.
ADMINISTRATIVE UPDATE STATUS Status: Plan elements described under this heading are complete. Progress reports will continue to be submitted semi-annually.
i III.
CONFIGURATION CONTROL STATUS 4
1.
Revise Change Management Process The level of review required and the responsibilities concerning plant change management were to be specified. The required scope ofinput to a change request was to be defined. The various procedures governing change management were to be integrated into a more efficient and harmonious change program. Elements of the task were:
+
Form team
+
Establish requirements
+
Proceduralize -
+
Automate Change Management Process Status: Complete. A document management program was developed using the general infrastructure of the internal electronic mail system.
Plant specific software was developed for use in the change management process and is currently in use across the site. The combination of the
'l procedure and software provides a standardized method of work flow and authorization control. Although the software has been functional for many rnonths, a system of this type only perfects through continuous enhancement and refinement.
1
Enclosure I to RA98/811 2.
Centralize Document Control -
Document control has been centralized in Building 110 (the front office building) with continuous improvements underway to enhance the quality of records keeping. Additional documentation resulting from the CSPU will be added when generated and approved.
IV.
LICENSE UPDATE 1.
Revise chapter 4 of SNM-33 Chapter 4 of SNM-33, Nuclear Criticality Safety was revised to incorporate applicable portions of the CSPU. Typographical errors were corrected and license conditions reworded to clarify their meaning. An amended Chapter 4 was submitted to NRC Licensing on April 17,1997.
NRC responded with a request for additional information on November 3, 1997. The additional information, including responses to. questions and a further revised version of Chapter 4, was submitted on January 30,1998.
Status: The amendment request was approved by the NRC on July 23, i
1998. Additional revisions to Chapter 4 may be requested as the CSPU i
progresses, V.
TRAINING Continued training and retraining was provided to operators in the area of Nuclear Criticality Safety. The training included safe movement and storage of material, the requirements of the NRC license, and internal procedures. The program of short, topical criticality safety training has continued, however the
- regularity has been reduced from weekly or bi-weekly to an as needed basis.
The training subject is generally chosen from in-plant observations by regulatory personnel.
VI.
SELF ASSESSMENT PROGRAM Status: Plan elements described under this heading are complete.
2
Enclosure I to RA98/811 Vll.
ANALYSIS UPDATE i
i 1.
Recycle / Recovery The progress of the update program on the Recycle / Recovery area is behind schedule. Due to unforeseen issues in both the regulatory and business domains, the availability of the required personnel to work on the CSPU was limited during this period of the program.
Additional external resources have been employed to aid in expediting the analytical effort required for the recycle recovery area. ABB Combustion Engineering plans to accelerate the progress of the program over the next -
few months and to be back on schedule with the overall CSPU schedule prior to the next semi-annual progress report.
Status: We are currently behind schedule on the criticality safety program undate for the recycle recovery area.
Vill.
SUMMARY
Progress this period on the CSPU plan was behind schedule. The criticality safety documentation of the recycle recovery process was initiated and is in progress at this time. An electronic database was selected, developed and tested to track and control change management packages. Site wide implementation is essentially complete. Frequent on-shift training of operators continues. External resources have been employed to aid in returning t'.: CSPU to the existing schedule.
I 3
ID Task Name 1
CRITICALITY SAFETY PROGRAM UPDATE i
2 Administrative enharcements I
3 Present Plan to NP.C 4
Submit Reply to NOV 96-202 5
Submit CSPU plan and schedule to NRC 6
ouarteriy Progres Reports to NRC 23 Configuration controi 24 Revise Change Reagement Process
_ _..25 Form Team 1
26 Set Requirements g g gg 27 Proc 9duralize 28 Automate change management process g
~29 Train and impiemer.t
)
ggg 30 Centraliz Document controi 8/12 nw 1111 31 Surveinance Tests 8/12 l 8/12
~
32 PMS 33 Revise ISA schedule and submit to NRC 34 Complete wntten Criticality Safety Program (RAAP-109) 5 35 Cnticality Analysis Procedure (RAAP-108) 36 Revise Commitment / Corrective Action Trading (RAAP-102) 37 Abnormal Event / Occurrence reporting (RAAP-105) 38 NRC reporting procedure (RAAP-104) 39 Record Retention Procedure (RAAP-107) 40 Document cont 7ok ;mdure (RAAP-191) a- -
Task i '
Progress Summary Critical Task f////////d tAilestone h
Rolled Up Task l
1998 1999 2000 2001 2002 ~
Q1lQ2lQ3lQ4 Q1lQ2lQ3lQ4 Q1lO2lQ3lQ4 Q1lQ2lQ3lQ4 Q1lQ2lO3 l
l APERTURE I
I I
I I
I I!
I I
l CARD Also Available on q
f ADerture Car x
l X
i l
l t
t 3/31 l
l l
t 1
I
] 1/30 l
l i
i i
l i
I
- Cr oo5cjlp3 G t 1
Rolled Up Cntical Task l l Rolled Up Progress L._
i
- [i Rolled Up Milestone O
M Q4 ID Task Namo Q1 02 41 ucense change procedure (RAAP-112) 3'/
42 Safety 'Ed documents procedure (RA^r-113;
' 'l9h4/8 4/9 l /29 43 Safety related positions document (RAAP 116) 44 Organization and Responsibildes Procedure (RAAP-121) 45 Stop Work Authonty procedure (RAAP-106) g 46 Update Emergency Plan (EPIP manual) 47 Desenption and operation of NCS Alarm System 48 Revise Chapter 4 of SNM 33 49 Submit chapter 4 amendment to NRC j
50 NRC revew chapter 4 amendment 51 NRC approve Chapter 4 amendment 52 Delete part 11 of SNM-33 (DELETE TASK) 53 Training 54 Update Training Program (RAAP-119) 55 Man gement, supervisors, Engineers g
g 60 Operators g, g g
g g
75 Self Assessment Program 76 Intemal audits / inspections procedure (RAAP-110) g 77 CamCAUTY ANALYSIS UPDATE 78 CONVERSION 79 Plant Configuration 80 PUD
- 10/25 gj1g 81 Drawings 10/28 k1/6 82 Dasts document Task Progress Summary Critical Task f////j(///d Milestone k
Rolled Up Task
'ww
1998 1999 2000 2001 M 002 a1lo2lo3lo4 01lo2lo3lo4 01lo2lo3lo4 a1lo2lo3lo4 01lo2lo3 I
i i
l l
ppdBTonE l
l CfARD t
l pjs0 AJaewon i
a rd l
l i
AF M37/22
[7f23 !
l i
t i
i l
l I
I I
I I
I l
l ;l 1
[
s i
I g
t t
970050 93-02 l
Rolled Up Critical Task l l Rotted Up Progress 1
.1 Rolled Up Milestone O L
1996 1997
$D Task Name W
83 An8'y5i$
1/21 l 2/24 84 Evaluation 5
2 85 Complete ISA 4/29 4/9-86 RECYCLE / RECOVERY 87 Plant Configuration 88 P&l0 89 Dr8*in95 7/8 90 sasis document 91 Evaluation 92 Analysis update 93 ISA 94 PELLET PLANT FRONT END 95 Plant Configuration l
9tj P&lD 97 Drawings gfj Basis document 99 Evaluation 100 Anavsm update i
101 ISA 102 STORAGE UNITS 103 Plant Configuration 104 P&lD 105 Drawings 106 B85is doc ament Progress Summary Task Critical Task f////////d Milestone k
Rolled Up Task
- ~ ^ -
1998 1999 2000 2001
- 2002-Q1lO2lQ3lQ4 Q1lQ2lO3lQ4 Q1lQ2lQ3lQ4 Q1lQ2lQ3lQ4 Q1lQ2lQ3
' 4 j
l i
i t
I i
f l 2/51 P
\\\\e.
- 00 5l l 1/30 Yh*
g6 O
413
~
4/6 k7/10 7/13
-fi/30 5NM gm 4
6 7/6 7/7 h#///J12/30 12/31 f1 31 1/4l 2/26'
'~
3J1 p/23 l
pI26 h/30,
g
' h.
l m
n
~
12/31 k//////)]7/1 7/2 k/////d12/12 h I' 6OTO l23-O2 12/23 (12/2 3
Rolled Up Critical Task l l Rolled Up Progress i
i
,[)
Rolled Up Milestone O
ID Task Name Q2lQ3lQ4, W To3 107 Evaluaten 108 Analysis update l
109 ISA Task
~'
Progress Summary Critical Task f////////d Milestone k
Rolled Up Task w %e h __
~
1998 1999 2000 2001
-2002
- Q1 Q2 l Q3 l Q4 Q1 l Q2 l Q3 l Q4 Q1lQ2 Q3lO4 Q1lQ2lQ3lQ4 Q1lQ2lQ3 12/24 $ 3/24 3/27 5/19 5/22 9/26
,se s
4Mooso 33-od Rolled Up Critical Task l l Rolled Up Progress F-i Rolled Up Milestone O
__