OR'GINAL UNITED STATES OF AMERICA NUC. LEAR REGULATORY COMMISSION
Title:
MEETING WITH COMMONWEALTH EDISON ~
Public Meeting Location: Rockville, Maryland .
Date: Tuesday, March 2,1999 Pages: 1 - 104 1
^
s . ,1
)
) ANN RILEY & ASSOCIATES, LTD.
- 5 Connecticut Ave.,N.W., Suite 1014 Washington, D.C.20036 (202) 842-0034 DR DO OSdOO 37 T PDR
4
(
S- 1
}. 1.
2 UNITED. STATES OF AMERICA <
l 3 NUCLEAR REGULATORY' COMMISSION.
' 4 '***- ,
5 OFFICE OF THE SECRETARY 4
6 ***
, 7 MEETING WITH COMMONWEALTH EDISON i 8 ***
9 PUBLIC MEETING i
i 10 ***
11 Nuclear Regulatory Commission 12 Room 1F-16, Building-1 l a
13 One White Flint North i 14 11555 Rockville' Pike ]
i i Rockville, Maryland 15
)
17 Tuesday, March 2, 1999 18 -The Commissio'n met in open session, pursuant to
-l 19 notice, at 9:33 a.m.,.the Honorable SHIRLEY A. JACKSON, 20 Chairman of the Commission, presiding.
- 21 22 23 24 j 25 ANN RILEY-&~ ASSOCIATES, LTD. l Court Reporters 1025 Connecticut; Avenue, NW, Suite 1014' ,
Washington,~ D.C.,.20036 i
(202) 842-0034
S- 2 1
2 NRC COMMISSIONERS PRESENT:
3 Nils J. Diaz, Commissioner 4 Greta J. Dicus, Commissioner 5 Jeffrey S. Merrifield, Commissioner 6 Edward McGaffigan, Jr.McGaffigan, Commissioner 7
8 INDUSTRY ATTENDEES PRESENT:
9 Oliver Kingsley, Commonwealth Edison 10 Christopher Crane, Commonwealth Edison 11 H. Gene Stanley, Commonwealth Edison 12 David Helwig, Commonwealth Edison 13 John Rowe, Unicom 14 NRC STAFF PRESENT:
15 William Travers, EDO 16 Roy Zimmerman, NRR 17 James Dyer, Region III 18 Geoffrey Grant, Division of Reactor Projects 19 l
20 ALSO PRESENT:
21 Annette Vietti-Cook, Secretary of the Commission .
22 Karen D. Cyr, General Counsel of the Commission 23 l
24 i 25 l
ANN RILEY & ASSOCIATES, LTD. I Court Reporters )
1025 Connecticut Avenue, NW, Suite 1014 l Washington, D.C. 20036 I (202) 842-0034
S- 3 1 PROCEEDINGS 2 [9 :33 a.m.]
3 CHAIRMAN JACKSON: Good morning, ladies and 4 gentlemen.
5 The purpose of today's meeting between the 6 Commission, among the Commission, Commonwealth Edison 7 Company and the NRC Staff, is to discuss the results today 8 of Com Ed's efforts to address the cyclic performance of its 9 nuclear facilities. Good morning, gentlemen.
10 And this is the -- it's not the fourth meeting 11 overall, but it's the fourth in a series of meetings the 12 Commission has held with the company to discuss progress and 13 results of their actions to improve performance and put an 14 end to cyclic up-and-down performance.
15 In January 1997, the NRC issued a formal request 16 for information pursuant to 10 CFR 50.54(f) requiring Com Ed 17 to explain why the NRC should have confidence in the 18 company's ability to operate its nuclear stations safely, 19 while sustaining performance improvements at each site. And 20 the letter also required the company to describe criteria l 4
. 21 which would be used to measure performance at all of its 22 nuclear stations.
23 Com Ed responded to that letter in March 1997, l 24 describing a combination of actions which it said would meet 25 the challenges before the company. l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
1 S- 4 )
l 1 In January 1998, the company transmitted to the 1
2 NRC its strategic priorities and management processes; that l l
3 is, strategic reform initiatives that were developed to 4 improve the nuclear program. These initiatives were 5 intended to support four overarching goals established by J
6 Com Ed: namely, operational and technical excellence;
~
7 material condition; organizational alignment; and work force 8 engagement and effective leadership and management.
9 The initiatives envelop the commitments made by 10 Com Ed in their March 1997 response to the 50.54 (f) letter.
11 Com Ed recently provided the Commission with a brief 12 assessment of the Quad Cities station.
13 During today's briefing, we hope to hear about 14 those areas where actions taken under the auspices of the 15 strategic reform initiatives have clearly addressed cyclic 16 performance issues and how success has been measured in this 17 area.
18 In addition, for areas where performance has not 19 met established expectations, we would be interested in an 20 honest discussion of the feedback mechanisms and management 21 tools that will allow the efforts to be refocused. .
22 After presentation by Com Ed, the NRC Staff will 23 present its assessment of the performance of the company's 24 nuclear plants, and I believe he is here -- we welcome Mr.
25 Jim Dyer for his first Commission meeting, as regional ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 5 ,
1 administrator for Region III. I ran into him this morning.
2 Anybody who would move to Chicago in the winter is a good 3 man.
4 [ Laughter.]
5 MR. KINGSLEY: That's right. Excuse me.
6 CHAIRMAN JACKSON: You know yourself.
- 7 So I understand that copies of the briefing 8 materials are available at the entrances to the room, and I 9 welcome the representatives of Commonwealth Edison this 10 morning, and unless my colleagues have any additional 11 comments, Mr. Rowe, happy to have you here, and you may 12 proceed.
13 MR. ROWE: Thank you very much, Chairman Jackson, 14 members of the Commission.
45 If Brother Kingsley's wife were present, she would 16 say that any man who moves to Chicago in the middle of the 17 winter must have a very tolerant and patient spouse, and 18 were she here, she could say that for herself, but I 19 wouldn't wish to leave her unrepresented. Or perhaps even 20 my own.
. 21 We are pleased to be here again. This is my 22 second in this series of meetings. Whereas in June we could 23 say that we had a few buds of progress in meeting the 24 challenges of our operation and the challenges set forth in 25 your 50.54 (f) letter, I believe we can now claim substantial ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 6 1 1 and tangible progress. Yet it is only a beginning, I think l l
j 2 now a very real beginning, but only a beginning, and-the i
- ^
3 first obligation that I have as CEO of the company is to
- 4 make it clear that I understand, that my board understands I
\
5 what you know, that Oliver Kingsley and his team understand, 6 and that is that this is a never-ending, continuous l l
~
7 improvement effort. The first day we come in and tell you j 8 that we have whipped all of these challenges is the day that
- 9 you will probably start finding a whole lot of new problems l 10 again. So we don't intend to let that day happen.
l 11 My own role in this -- and this is both as CEO and i
12 to some extent as a representative of the board of directors l
! 13 -- has been first to emphasize the need for consistency in i
j 14 our commitment to superior performance in our nuclear fleet.
- 15 It is very clear that some of Com Ed's past woes came from 16 inconsistency in management and direction, and we must make 17 it very clear that we will operate these units in a superior
- 18 fashion, by your standards, by NRC standards but, perhaps 19 most importantly of all, in a spirit of continuous f
20 improvement in our own house. I am doing my best to convey
- 21 that attitude, and my colleagues who are here today are even .
1 22 better at it. ;
23 The second thing I can do is to try to make f
24 certain that Oliver Kingsley is backed by a strong and
[ 25 developing management team which can inculcate the i
ANN RILEY & ASSOCIATES, LTD.
- Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 .
- . Washington, D.C. 20036 4'
(202) 842-0034
S- 7 1 commitment to excellence down into the roots of the company.
2 We have a long way yet to go in that regard, but the 3 progress is real, as you will see from the group of people
, 4 who are here with Oliver today.
5 We are making the commitments to have good people 4
6 in all jobs. We are continuing to make changes where we
- 7 have to, but we are trying to do that with people who have 8 been with us a while where we can, and we are constantly 9 holding people deeper and deeper to a higher sense of 10 clarity and consistency.
11 Finally, it is my job to make certain that the 12 flow of resources, both financial and managerial, is 13 consistent with the needs of the operation. I have tried to 14 balance my economic responsibility for the company with this 15 need for a commitment to operational excellence, by laying 16 down a broad standard of economic performance, which is 17 simply if the units cannot be operated in a superior fashion 18 at going-forward costs which are consistent with the market 19 value of their output, they will be shut down. I have made 20 that statement in virtually every set of remarks I make with I. 21 employees.
22 Now within that broad competitive umbrella, I have 23 made it very clear that our nuclear generation group will 24 get the resources it needs. They are making their budget 25 recommendations to us, and my finance people and I are i
t ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 8 1 accepting them. It is not going the other way around. They 2 are making it kind of easy because they are committed to 3 productivity in a way that is at least as skillful as anyone 4 else in our shop. But the important thing is that we have 5 learned the lesson that disrupting nuclear planning cycles 6 for annual budget requirements doesn't save you money, it 7 costs you money and, therefore, we are committed to 8 consistency in the flow of resources. .
9 I have attempted over the past year, and it is now 10 something like 50 weeks since I started at Com Ed, to add 11 what I can to the nuclear operation without getting in the 12 way, and sometimes a CEO has to pay a little attention to 13 the Hippocratic oath and know that your first duty is to try 14 to do no harm, since CEOs are usually having an impact 15 whether they like it or not.
16 I have visited each of our nuclear stations at 17 least twice, some three or four times. When I do, I meet 18 with both management and union employees. I have seen a 19 number of things getting better, parcicularly the commitment 20 to improving material condition, the commitment to 21 increasing attention to the operability of safety systems, .
22 and the operability of all plant systems, and in the detail 23 of professionalism in planning.
24 On the other hand, we still have a long way to go 25 in getting every employee, management and union, to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Wasb;ngton, D.C. 20036 (202) 842-0034
1 S- 9 l l' understand the importance of rigor all of the time. Oliver 2 is working on that.
3 Our performance in the past-eight months includes 4 very successful refueling outages at Braidwood, Quad Cities, 5 Byron and Dresden. It includes the successful start-up of 6 LaSalle 1 in August, and both Quad Cities units'in late May i
7 aLJ June. It includes significant improvements in the 8 indicators used by INPO and significant~ improvements in most 9 of the other tangible things we can look at, particularly 10 capacity factors. One that I know will be addressed here 11 today, because it properly troubled the Commission when we -
12 were here last June, is the reductions we have had in scrams 13 and in half-scram conditions, and my colleagues will 14 emphasize those.
15 It is very clear that meeting the challenge the 16 Commission laid out in the 50.54 (f) letter required nothing 17 less than a complete change in the management structure at 18 Com Ed. It required a CEO who would seek at most to do no 19 harm, at best to help. It required a new chief nuclear 1 20 officer, and Oliver Kingsley, who is here with me, has 21 filled that role superbly and without doubt deserves the l.
22 lion's share of the credit for the turnaround that I really i 23 believe is beginning and yet, of course, it requires a team I
24 that is much broader and deeper than any one person.
l 25 One of the things that Oliver hopes to show you l
ANN RILEY & ASSOCIATES, LTD. '
Court Reporters-1025 Connecticut ~ Avenue, NW,' Suite 1014 Washington, D.C. 20036 s
(202) 842-0034 t
- a --, ,- e r ,r
S- 10 1 today is that we are building a management that shares his 2 values, and that decreasingly this will be a one-man show.
3 It is terribly important that we get breadth and depth in
-4 all of this, and we are working on both.
5 Oliver is here with me to my right, as is David 6 Helwig, our senior vice president of nuclear' services, who 7 will discuss our 13 strategic performance initiatives.
8 Chris Crane, our relatively new vice president for BWR 9 operations, will review those units, and Gene Stanley, who 10 has been with the company a substantially longer period, 11 will discuss the PWR operations, and Oliver will close.
12 We also have with us today Steve Perry, Jeff 13 Benjamin, Rod Critch and Jennie Brown, each of whom is a 14 vice president on the nuclear team and will be available to 15 answer questions where needed.
16 We are fortunate that Bill Starr, who is president' 17 of the union that represents something like 9000 18 Commonwealth Edison employees, is here with us. Bill is 19 willing to answer questions already.
20 CHAIRMAN JACKSON: Why don't you raise your hand?
21 1 think we know a number of people. .
22 MR. ROWE: Bill is generally -- he's usually a 23 little taller than most folks in the room. So it's one of 24 his negotiating tactics, is to be very big.
25 CHAIRMAN JACKSON: I clearly failed then. l 1
I ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenuei NW, Suite 1014 I Washington, D.C. 20036 l (202) 842-0034. l l
l i
J
s S- 11 1 MR. ROWE: Me, too, but Bill is here to answer any 2 questions you may have about the issues between labor and 3 management in the company. Let me say that we do have 4 issues, everyone does. We have more than some folks do.
5 Dut Bill and his colleagues in the union leadership are 6 keenly aware of the importance of high performance at the 7 plants to the long-term jobs of their employees, and he and 8 Oliver, and David Helwig, and Gene Stanley are working 9 together more every month in an effort to find mutually 10 beneficial ways of addressing them.
11 Finally, for my own part, I continue to be focused 12 on setting high standards for sustained nuclear performance, 13 for making it clear that the plants are economically 14 accountable in the long run, but will not be jerked around 15 on day-to-day or year-to-year basis, for providing the 16 management talent that is needed, and for assuring stability 17 in the flow of resources. With that, I will defer to Oliver 18 unless the Commissioners have any questions of me at this 19 time.
20 MR. KINGSLEY: Thank you, John. Good morning,
. 21 Chairman Jackson, Commissioners.
22 May I have the first slide, please?
23 I want to share my perspective on what the Comed 24 team has accomplished since we were here last June. Let me 25 start by saying that we are a significantly improved nuclear ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l (202) 842-0034 I l
l l
S- 12 1 program compared to performance of the past. We are going 2 to show you a number of specific improvements that me 3 measure throughout our presentation. This improvement has 4 been achieved through focus on fundamentals and insistence 5 on high performance standards.
6 But at the same time, I want to make sure that 7 each of you clearly understands that we are not ready to 8 declare victory, by no means finished. Much additional work 9 remains to be done. We are going to outline this throughout 10 our presentation, where improvements are needed and how 11 these improvements are being made.
12 May I have the next slide?
13 COMMISSIONER MERRIFIELD: Chairman.
14 CHAIRMAN JACKSON: Yes, please.
15 COMMISSIONER MERRIFIELD: I have one question I 16 would like to start off with. And I think you may want to 17 follow through on this as you go through the presentation.
18 MR. KINGSLEY: Okay.
19 COMMISSIONER MERRIFIELD: You have a variety of 20 plants, some of which are vocy good performers and some of 21 which aren't. And one of the issues that you deal with, .
22 having that many plants, is making sure, as you say, to act 23 as a team so that you won't have a series of nuclear 24 islands. So, as you go through your discussion, I would be 25 interested in learning about the communication and ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 13 1 cooperation that you have been able to develop throughout 2 those plants, so that there is that crc 3s-learning between 3 the plants so that the lessons learned at your good 4 performers are filtering down, as they should, to your --
5 MR. KINGSLEY: Let me just deal a little bit with 6 that now. We have what we call peer teams, this would 7 represent areas such as maintenance, operations, chemistry, 8 rad con, work control, engineering, et cetera. There's 9 around 15 of these and we have an executive sponsor. They 10 meet monthly, they tackle issues.
11 We have a great deal of interactive communication 12 with our plants on both a general basis. We have a 7:30 13 morning call where.we go through in some detail performance 14 on the plants. One of the questions we always ask is 15 whether, if it is an issue at Dresden, is it an issue at 16 Quad? If it is an issue by Byron, what about Braidwood?
l 17 We also deal with specific issues, and we have had j l
18 several events which we are not satisfied with, even though l
19 not major, programmatic backdowns, and then we critique 20 those and take those across all five sites. And it is
. 21 encouraging to see the sites start to take these issues, and 22 without being prompted by Oliver Kingsley or Dav.id Helwig, 1
23 start addressing -- well, the people at Quad say we have )
24 already checked into that, Mr. Kingsley, when Dresden has an ;
i 25 issue.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1C14 Washington, D.C. 20036 (202) 842-0034
S- 14 1 And then we also have a very structured oversight 2 process out of our corporate office, and this is not just 3 nuclear oversight, it is all the functional areas that David 4 has and the area of training that Steve Perry has, where we 5 take these areas and the oversight insures consistency.
6 We are still working very hard on putting in a 7 number of fundamentals, I am going to talk to you about 8 that, where we take these fundamentals and, say, where they 9 are missing at a plant like Quad Cities, and ensure that 10 they are in place on Byron to Braidwood, but we spare no one 11 in this. So we will weave this in through our presentation 12 todey.
13 MR. ROWE: Oliver, if I could just add something.
14 One of the kind of root cause issues that has haunted the 15 Comed nuclear program in the past has been that successes 16 and good results have been largely the result of initiatives 17 at individual stations which were inconsistent.
18 MR. KINGSLEY: Right.
19 MR. ROWE: And there was not a sense of respect 20 for the nuclear generation group leadership and its 21 contribution that allowed successes at one station to be .
22 generalized, or , indeed, problems at one station to be 23 generalized and deelt with on an across the board basis.
24 It is very clear to everyone now that the center 25 of gravity in the nuclear management is the NGG group ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 15 1 leadership, Oliver, David Helwig, Gene Stanley, Chris Crane, 2 Steve Perry, and because these people have the standards and 3 the commitment to excellence and the personal force, both 4 through corporate authority and through genuine strength of 5 character themselves, you know, we are slowly making NGG a 6 real value added group in generalizing from these 7 experiences instead of corporate seagulls, or whatever those 8 kind of expressions are.
9 MR. KINGSLEY: Yeah, there are some more things 10 with common staff meetings, we have monthly, we have 11 quarterly business plan reviews. We have a common set of ;
12 metrics now in all the plants that I brought, where we track 13 the performance, so there are a number of things we are 14 doing, because it is quite important, the question you 15 asked.
16 I would like to have the next slide, please. And 17 review with you -- it is also in your handout, it is a 16 little difficult to see, the tangible results that we have 19 achieved since we were here in June. These are four of the 20 high level indicators that we track among many others. I
. 21 mentioned the overall performance tracking we do. Our 22 capacity factor is up to 71.2 percent, that is a full 22 23 percentage point improvement over 1997, a much higher 24 percent than that.
25 Our average INPO index, and you can remember that ANN RILEY & ASSOCIATES, LTD. l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 '
(202) 842-0034 l
l S- 16 i 1 being released in the notes that INPO released, is not 2 approximately '82. That is a weighted average of a number 3 of indicators, whether it be a capacity factor, unplanned 4 capability loss that track plant operations, safety system 5 reliability, personnel and radiation safety, and is a common 6 metric used on all the plants. We are at our best ever,
- 7 first time over 80 on these plants.
8 I am going to show you later, in fact, you can see s
9 it on there, where the top quartile performance is on all of 10 these, and the median.
11 CHAIRMAN JACKSON: Well, do you know, Mr.
12 Kingsley, what is holding you back, what is going to get you 13 that last?
14 MR. KINGSLEY: Oh, we got it, it is coming up 15 right here in the -- we have got gap analysis. We are going 1
16 to show you what the gaps are. I am going to take . .e 17 example and then we will deal with that later in the 18 presentation, Chairman Jackson.
1 19 CHAIRMAN JACKSON: Okay. And do you believe that j 20 improvements in material condition have 2ed to your -- are 21 linked to your improvements in capacity factor? .
22 MR. KINGSLEY: Yes, absolutely.
23 CHAIRMAN JACKSON: Okay.
24 MR. KINGSLEY: A big improvement, particularly in 25 the forced outage rate, which is on this chart. Unplanned ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 17 1 scrams, we talked about that at our last briefing. All of 2 you know the 1998 total, particularly in the first half of 3 the year, was not satisfactory. We have been actively 4 implementing scram reduction initiatives on all five of our 5 sites. We were behind the curve, but you can see that this 6 work has proven to be fruitful and the results are bearing 7 out. We have had one scram here in the last eight months.
8 COMMISSIONER McGAFFIGAN: Madame Chairman.
9 CHAIRMAN JACKSON: Yes, please.
10 COMMISSIONER McGAFFIGAN: Have you had manual 11 scrams during this period? Because, I mean as you probably 12 are aware, the performance indicator, the staff is 13 recommending it --
14 MR. KINGSLEY: We had one manual scram on LaSalle 15 Unit 1 during the startup test program. It involved a 16 feedwater event, one that we are in the checkout process.
17 The operators did exactly the right thing, and then we took 18 a number of corrective actions, particularly with 19 indication. But that is the only other scram that I am i 20 familiar with during that period of time. j l
. 21 COMMISSIONER McGAFFIGAN: Okay.
22 MR. KINGSLEY: Our forced outage rate that 23 Chairman Jackson mentioned is down considerably, 1.7 )
I 24 percent. That is below the median of the industry, below I 25 the average. It is a result of material condition ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
I I S- 18 l 1 improvements, and e number of improvements we made in general operating practices also, which has led to some of !
2.
3 this. t 4 Behind all this, we made specific improvements at 5 each site. Each station surpassed its capacity factor 6 goals. We completed the outages that John mentioned, and 7 did a very good job with that. And we made a number of 8 general improvements at each site. .
9 And we are going to talk to you in detail about 10 the plants. May I have the next slide?
11 Our assessment of the root causes of Comed's ,
12 cyclic performance show clearly that focusing.on the 13 fundamentals was essential and this was the basis of the 14 SRIs. In addition, our management team was weak. We 15 strengthened that management teata and I am going to talk to 16 you about that, We put a lot more talent in place.
17 Since I have come aboard we have hired in addition 18 to myself some 29 new managers -- 11 senior managers. Each l
19 one has turn-around experience, which is important. We 1
20 brought in 18 high level middle managers, the vast majority 21 of whom have turn-around experience. Overall we have added .
l i 22 well over 100 key people. This has resulted in much l '
L 23 stronger, more cohesive leadership being demonstrated, both 24 at the corporate office and even more importantly at the 25 sites.
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 ,
(202) 842-0034 !
i S- 19 l 1 We are clearly focused on problem resolution and 2 to resolve those problems we made a number of operating 3 practice improvements which was missing. We made 4 improvements in material condition. We have upgraded 5 engineering and other essential programs. We have worked 6 very hard on event investigation and associated corrective 7 action. The strategic performance initiatives have helped 8 us establish the fundamentals by defining standards and 9 expectations. It's also put a rigor in the organization of 10 having milestones -- we have to have this done by a certain 11 time -- and it has helped us put in these "how tos." Dave 12 is going to talk about that when he speaks later.
13 We have also worked very hard on standardizing 14 programs and processes. This was missing. It was one thing 15 at one plant, one at another. We did not have a best 16 practice system and we have made considerable progress on l
l 17 that.
18 Common themes in all these improvements are clear.
19 We defined standards and we set expectations with those 20 standards. Results -- we focas on results. We monitor l
. 21 performance. We check it very carefully. We have 22 accountability for results. I clearly tell the people well, 23 it's good, it's one thing to work hard but you have got to 24 get results. You have got to get to the bottom line here.
25 We have got strong leadership. Our corporate i
4 ANN RILEY & ASSOCIATES, LTD. l Court Reporters l 1025 Connecticut Avenue, NW, Suite 1014 l 2 84 - b34 1
S- 20 1 office now provides support, helps the plants solve 2 problems, and we have got correct oversight.
3 Collectively these actions effectively address the 4 issues that led to our previous cyclic performance and we s
5 will continue to support sustained performance going 6 forward.
~
7 May I have the next slide?
8 COMMISSIONER MERRIFIELD: Madam Chairman? .
9 CHAIRMAN JACKSON: Please.
10 COMMISSIONER MERRIFIELD: I am a new Commissioner 11 but I know that Comed has come in before the Commission a 12 number of times and frequently has talked about -- going 13 back to this slide -- more effective leadership, problem 14 resolution, performing strategic initiatives, process 15 improvements. I mean these are not new concepts that have 16 been discussed by Comed, so it would be useful for me to 17 understand how what you are doing in 1998 is truly different 18 and the extent to which we can be confident that you will be 19 able to follow through on this as the years move forward.
20 MR. KINGSLEY: Would you like me to talk about 21 that now?
- 22 CRAIRMAN JACKSON: I think it would be better to 23 allow them to talk about the results, because in the end 24 that is where the confidence has to lie.
25 MR. KINGSLEY: Right.
l l
l l ANN RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
l
S- 21 i
1 CHAIRMAN JACKSON: And you know that I-believe 2 that management is as management.does. -
3 MR. KINGSLEY: That's right, and if we don't
- 4~ produce, all the talk in the world is not worth anything. ,
5 CHAIRMAN JACKSON: Absolutely.
6 COMMISSIONER MERRIFIELD: I would be happy to ,
!* 7 withhold that but I would like you to address it later on.
8 MR. KINGSLEY: 'All right, we will.
} 9 MR. HELWIG: It will come up in my remarks as i 10 well. ,
11 MR. KINGSLEY: It is different and we would like 12 to explain that to you. The fact that we are talking about 13 improvement does not imply that we think we are there. We 14 are not close to declaring victory. We are not complacent ;
i 15 with our achievements. We are just simply not there.
16 We have to achieve and sustain long-lasting 1 1
I 17 improvement in many areas to reach top performance. One of 18 our top responsibilities has been for Comed to take 19 responsibility for its own performance. We were not doing 20 that.
. 21 We were not defining our own performance 22 standards. In other words, we were relying on the Institute 23 of Nuclear Power Operations and the ::RC to kind of instill 24 performance into an organization. That does not work.
25 We have discussed this with you many times before.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202)- 842-0034 l
, S- 22
{
1 We talked about it. I can remember vividly at the November 2 4, 1997 meeting I had to talk about this in some detail, but 1
l 3 I am now able to report specific progress on how we are ,
1 I
! 4 putting action into this utility responsibility or Comed a
3 5 responsibility.
1 j 6 We are focused on the rate of improven.ent. We l 7 call this Delta X anc Delta T. Commissioner Merrifield, you i
8 weren't here -- that's just a rate -- and we are also l
9 focusing on closing the performance gap.
10 CHAIRMAN JACKSON: Delta X -- and Delta X?
] 11 MR. KINGSLEY: That's right. That's that Delta X.
1 12 We are working hard on continuing this positive 13 ronte and we also have a definitive plan that we want to 14 talk to you about where we are going to meet and surpass 15 industry standards.
16 We continue to work on instilling standards 17 throughout the organization. We are doing this in a number 18 of ways -- through management oversight and support that I 19 have talked about, so we are making our first-line 20 supervisors more effective; through coaching and teaching at 21 all levels; through accountability for performance; through -
22 more effective communication with employees, and I am quite 23 proud of what we have been able to do here.
24 Bill Starr is here. We have worked very hard on 25 improving the relationship with the International l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) C42-0034
S- 23 1 Brotherhood of Electrical Workers and we are making 2 progress, forging an effective partnership with the IBEW and 3 achieving high performance. We cannot do it without having 4 a good partnership.
5 CHAIRMAN JACKSON: Are you going to talk a little 6 more about that, and are there site-to-site variations in 7 terms of union relationships?
8 MR. KINGSLEY: Yes, there are.
9 CHAIRMAN JACKSON: And are there any particular 10 hard spots?
11 MR. KINGSLEY: No , I don't know of any big hard 12 spots we've had lack of consistency. We had I'd say a huge 13 issue with lack of trust. We'd say one thing and do 14 another. We've had -- I mentioned consistency, which bodes 15 for problems. We'd do it one way at Dresden, we'd do 16 another at Quad Cities. We're working very hard right now 17 on an operations package that we're still negotiating of 18 putting some consistency in and having this be a win-win.
19 We have done an in-depth review of grievances, you know, 20 what's behind those. We've settled a number of grievances
. 21 such as at our Dresden plant. So we've put a number of 22 issues behind us, but we still have work to do here.
' ~
23 CHAIRMAN JACKSON: You know, there have been 24 reports in the trade press about, you know, there have been 25 complaints of high overtime usage --
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
i S- 24 j 1 MR. KINGSLEY: Right.
2 CHAIRMAN JACKSON: And contentions --
i 3 MR. KINGSLEY: Um-hum.
4 CHAIRMAN JACKSON: That this impacts the-5 operator's ability to operate safely. I mean, is there i
6 anything in your collective bargaining agreement that you'd j f 7 be looking at that relative to whether it's forcing some -- l 8 number of hours?
l 9 MR. KINGSLEY: .We are looking at it, and Gene j 10 Stanley is going to talk about it in detail. We are i
11 addressing some issues in the collective bargaining l 12 agreement. However, overall high overtime is down from
! 13 '98 -- from '97. We don't see that as a big issue, but 14 we're going to talk to you in detail about that.
i 15 CHAIRMAN JACKSON: But the real question I have is
- 16 do your employees appreciate that fatigue impacts fitness 17 for duty and that they can be excused if they're unfit due +
18 to fatigue?
l 19 MR. KINGSLEY: I think they do.
l-
! 20 CHAIRMAN JACKSON: Okay.
i 21 MR. KINGSLEY: Just a little bit on. priorities -
22 going forward. '
l We're going to work -- continue to work on
, 23 institutionalizing the fundamentals throughout the work 24 force. We've got work to do, make these improved practices 4
25 a way of life, continue to identify and correct problems and J -.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 '
Washington, D.C. 20036 L (202) 842-0034 1
5
S- 25 1 take each of our sites to the next level of performance.
2 May I have the next slide.
3 This is also in your handout. As I stated 4 earlier, we've got a lot of work to do, but we also know 5 what this work is. And let me explain our workdown process.
6 This slide is fairly busy, and I want to talk to 7 it in detail. There are some important concepts in it.
8 First is we have defined annual performance targets for 9 1999, 2000, and 2001 in our business plan. And we do have a 10 good business plan now. Each target has detailed action 11 plans for each year in this business plan. We will be at 12 top quartile performance or better by the year 2001. And.I 13 want to talk to you about how we're going to achieve that.
14 First step we've done is to benchmark ourselves l
15 against top industry performance, gap analysis. And the 16 slide gives a specific example in one area. This is what 17 we -- how we figure out what delta x is. We've talked about 18 that. You wanted us to come back and show you that.
19 We've got this agaf.nst the very best top quartile.
20 We've done it in all areas, capacity factor. We've broken
. 21 it down. INPO index, each nine elements. Cost, outage 22 performance, and it goes on. So we've done some very good
~
23 work there, but more importantly we've got action plans in 24 place to close these gaps, action plans, and we do follow up 25 and we do hold people accountable for implementing these l
ANN RILEY & ASSOCIATES, LTD. l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l Washington, D.C. 20036 (202) 842-0034 i
i i
S- 26-1 action 91ans.
2 CHAIRMAN JACKSON: Let me -- may I ask you a ,
3 question? Let me.ask.you a question. By source-term" 4' reduction, do you mean contamination cleanup or. cleanup from ,
5 previous spills -- ,
6 MR. KINGSLEY: Primarily in' source term it's'in- .i
~
7 decontamination, hot spots --
8 CHAIRMAN JACKSON: Right. i 9 MR. KINGSLEY: In piping, hot spots in the 10 reactor .
11 CHAIRMAN JACKSON: Right. ,
12 MR. KINGSLEY: We've got details today. We can i
13 talk about that 14 CHAIRMAN JACKSON: Um-hum. I 15 MR. KINGSLEY: -And we've also done a great deal
-16 with kind of recovering the plant. I think at one time Quad 17 Cities had 22 percent contaminated floor space. That means i 18 you just can't hardly go in areas. And we've got that down.
19 to less than 2 percent. In fact, I believe it's less than 1-20 right now. That's also in our indicators that we track.
21 CHAIRMAN JACKSON: Yes, because I remember once I- -
22 guess it was visiting Dresden, you know, I don't often get, 3 23 you know,.a net dose'from visiting nuclear plants.
24 MR. KINGSLEY: Um-hum. p 25 CHAIRMAN JACKSON: And I did -- ,
ANN RILEY & ASSOCIATES, LTD. i Court Reporters 1025 Connecticut Avenue, NW, Suite.1014 Washington, D.C. 20036
-(202) 842-0034 q
_ - _ _ _ . _ - _ _ _ ._ _ _ _ _ _ _ _ _ _ ___ m
, i
-S- 27 ,
1 MR. KINGSLEY: Um-hum.
2 CHAIRMAN JACKSON: Visiting Dresden.
3 MR. KINGSLEY: Um-hum.
4 CHAIRMAN JACKSON: And so it's been a particular ,
5 issue of mine.with Comed.
6- MR. KINGSLEY: -Well, we've been an outlier.
7 CHAIRMAN JACKSON: Right.
8 MR. KINGSLEY: The bottom of.the barrel. We are 9 making big improvements.
10_ CHAIRMAN JACKSON: And let me ask you one last 11 question. Have you explored what a risk-informed in-service 12 inspection might mean to collective radiation exposure for 13 your plants?
14 MR. HELWIG: Yes, ma'am, we have. We've been 15 following the pilots done on that at the other plants, and 16 we'll be pursuing that subject in our business plans here in 17 the next couple of years.
18 CHAIRMAN JACKSON: Okay. All right. Thank you.
19 101. KINGSLEY: I'd like to illustrate on this 20 chart real quickly. We just pick the INPO index. It is
. 21 charted. On the left-hand side it shows.the end of year 22 1998, and then it shows our target for the year 2001. This 23 is above the top quartile in the industry. We've got the 24 gaps broken down. And on the right-hand side we've picked 25 an example. Sounds like we picked the right one in ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025' Connecticut' Avenue, NW,' Suite 1014 Washington, D.C. 20036-
- (202) 842-0034
f S- 28 l 1 radiation exposure for Quad Cities. It's an outlier.
l 2 We've broken this down into every aspect above the i
3 top quartile, and then we've got specific plans in place ;
4 both on an annual basis, both on a refueling basis, both on 5 a mid-cycle source-term reduction. Refueling outage 6 duration. ISI program. And I won't go into all of those, f
7 but it's in there. And the sites are held accountable.
8 So I wanted to leave you with a message. We've 9 got specific plans in place, and we are going to take these
, 10 sites to the next level.
11 Now I'd like to have David Helwig, subject to any 12 questions, move on and talk about the strategic reform 1
13 initiatives. .
14 David?
15 MR. HELWIG: Thank you very much.
16 As the Chairman and Cliver mentioned, the 13 SRIs 17 were formulated to focus our efforts on breaking our 18 historic pattern of cyclical performance. They also proved 19 to provide an effective mechanism to communicate with our 20 work force and other consti:uencies about what our focus is 21 and what our priorities are. .
22 Collectively the 13 SRIs were designed to arrest 23 this cyclical performance by providing a focus on 24 performance and results throughout the entire organization; 25 by defining clear expectations and standards; by putting in ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
. _ __ _~
S- 29 1 place the basic processes and fundamentals essential for l 2 improved performance; by establishing clear roles and i 3 responsibilities throughout all facets of the organization, 4 and, lastly, ensuring more effective oversight.
5 The implementation of each specific action set 6 forth under these SRIs has now been completed, but in truth 7 we're really never done. These are really areas of 8 management focus, and we have really just merely succeeded
! 9 in laying the foundation for continuous improvement.
1 10 Next slide, please.
! 11 MR. KINGSLEY: This is one of the differences of l
12 what was not there and what's now in place that Commissioner 13 Merrifield asked about.
1 14 MR. HELWIG: Could I have the next slide, please?
15 Upon completion of the action plans under each of 16 these strategic reform initiatives, we have conducted what I 17 call targeted and focused effectiveness reviews. The SRI 18 owners, such as myself, were responsible to arrange for an 19 assessment of what had been accomplished, given the 20 variation in the topics that these SRIs covered, the means
. 21 of performing the effectiveness reviews varied accordingly, 22 but each represents a thorough self-assessment of what's 23 been accomplished and what remains to be accomplished, 24 In each case, we validated that the original 25 purpose of the SRI had been satisfied. In other words, the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
..-..- . .. - . - - . . ~ _ _ - - - . _.-.- - - . .. .. . .
S- 30 1 fundamental processes were defined, were put in place, an'd ,
2 were in.use. We also identified areas requiring further 3 improvement through these self-assessments.
4 CHAIRMAN JACKSON: What are some of the major 5 areas for improvement that have been identified common.to 6 all the sites? Can you -- ,
. . l 7 MR. HELWIG: Yes, ma'am, I've chosen two examples l 8 that I'll use in the next several slides --
9 CHAIR 4AN JACKSON: Oh , okay. Then I'll wait.
10 Fine.
11 M2 HELWIG: To illustrate that.
12 CHAIRMAN JACKSON: Fine. Um-hum.
13 MR. HELWIG: In addition to these targeted reviews 14 for each of the specific SRIs, we will be performing an 15 overall effectiveness review. We've now prepared an 16 assessment plan for that. We've assembled four teams, and 17 we'll be conducting this overall effectiveness review 18 starting the end of March, latter part of March, and 19 concluding in mid-April. Following the conclusion of that 20 review, the findings will be presented to our senior P
21 management team and we'll disposition all those findings as .
3 22 input to our continuous improvement processes. .
~
L 23 Can I have the next slide, please?
24 CHAIRMAN JACKSON: Where are your outside experts? ,
l j 25 MR. HEWLING: They've been' drawn from our nuclear i
r
- 1001 RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut. Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
..- . _ . _ ~ _ _ _ _ _ . ._. _ . . . . ._. _ ._ . _ _
P S-- 31
- 1 safety review boards that include outside participation --
4 2 Mr. Cain, Sylvia, Isanhan and Townsend -- all of whom are 3 outside members of our nuclear safety review boards,'which 4 gives them intimate _famil'iarity with our issues, our 5 performance,-and the areas-that require attention. ,
6 Other team members'have substantial experience, ;
7 evaluation type experience, through assignments at the 8 Institute of Nuclear Power Operations and assignments like 9 that, experiences such as that. So we have a diverse 10 background of people from within the organization, from the 11 sites, from our corporate organization and from outside of 12 the company. '
13 I have selected two of what I consider to be the l 14 most important and fundamental of the SRIs to illustrate the j
.i 15 results of our internal effectiveness reviews.
16 NGG-1 was our initiative'to strengthen performance 17 monitoring and management. Of course, it's absolutely 18 fundamental to have the right measures in place and to pay 19 attention to them as a management team and use them 20 effectively.
. 21 Beginning with the accomplishments, out of our 22 effectiveness review, we verified and validated that in fact 23 we had established a set of comprehensive, consistent and 24 integrated top-level and supporting performance ~ measures.
25 There are about 50. top-level performance indicators that we ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue,,NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I S- -32 1 use for all of the plants and compile them for an overall 2 view of performaner across all the sites within the NGG, and 3 about 120 additional lower level and supporting indicators 4 that are compiled behind this on a monthly basis for each 5 and every one of the sites. I didn't bother to bring all i 6 five of those books -- it makes quite a volume of material
~
7 when you line them up -- but it's a very valuable tool for 8 us. .
9 One of the things that I think has been 10 exceptional about what we have accomplished here compared to 11 what I've been able to be involved with elsewhere and 12 accomplish is that all of these performance measures are 13 lined up with our goals and the gap analysis and improvement 14 initiatives that Oliver was describing that are imbedded in 15 our business plan. So it's an integrated set of measures, 16 goals, improvement initiatives to get us to the performance 17 levels that we intend to get to over the next couple of l 18 years. ;
19 In fact, having set up our performance measures in 20 this way, we do not need to have a separate management i
21 process for their use and implementation. They're inherent .
22 in the way we manage. As a result, we've got an integrated
- 23 process where these are used for our day-to-day management, 24 in our monthly review meetings, in our staff meetings, in 25 our business plan performance review meetings to keep us 1
i
! ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington,.D.C. 20036
.(202) 842-0034
S- 33 1 constantly focused on what our actual performance is and 2 what progress we're making along our improvement initiatives 3 in each and every area.
4 In this example of this SRI, the remaining focus 5 area that we identified -- we called it focus area -- that 6 means where we're supposed to continue to improve -- we 7 identified that we were not as effective yet as we need to 8 be in the use of this information for trending and analysis, 9 requires at the moment -- it varies a bit from site to site, 10 but I would characterize it requires a great deal of 11 discussion to pursue the insights behind any measure that 12 you want to understand its trend. That is the key area that 13 we identified for further inprovement. I personally believe 14 that's a maturing process as we learn how to use these and 15 install that throughout the organization.
16 The second example I've chosen for discussion is 17 NGG-3, ensuring excellence in plant material condition, as .
18 you asked about earlier. I believe that our improvements in 19 this area have most definitely contributed to the improved 20 performance that we've been able to demonstrate within the
. 21 past year.
l 22 This material condition issue is absolutely ;
23 fundamental to plant reliability and, of course, to the 24 degree of challenge that the operators face during 25 day-to-ds.y operations or when faced with a transient.
i ANN RILEY & ASSOCIATES, LTD. l Court Reporters )
1025 Connecticut Avenue, NW, Suite 1014 ;
Washington, D.C. 20036 (202) 842-0034
- . - _ . . . ~ - . . _ . --.- . - . _ _ . . . - - - . . - . - . . - . . - . - . . _
I S- 34 i
! 1 In terms of accomplishments here, we have, number i
4 2 one,. adopted industry best practices for. work planning and
- 3 management. To your point, Commissioner Merrifield, there-4 . was very little done in terms of' standardization across all 5 of the sites. This is an area where we have done extensive 6 work in identifying best practices from elsewhere, bringing
~
7 them into the company and standardizing them across all of 8 the plants. .,
9 We've also put in place a coherent system for ,
a 10 measuring the health of our systems or the condition of our 11 station systems. This includes but is not limited to 12 maintenance rule considerations.
13 We have also developed a comprehensive model of 14 the processes that support material condition improvement-15 and have a complementary set of performance measures for all 16 the important aspects of those processes. This again has 17 been accomplished across all of the organization in a very 18 highly organized and standard way.
19 Finally, we have established standard methods for 20 reporting and communicating on our material-condition and 21 our progress on material condition improvements at each and -
3 22 every one of the sites.
23 To your question earlier on teamwork and 24 cooperation amongst the sites directly related to material 25 condition issues, as a matter of fact, on this morning's ANN RILEY & ASSOCIATES, LTD.
Court Reporters.
1025 Connecticut Avenue, NW, Suite'1014 Washington, D.C. 20036 (202) 842-0034
i j.
S- 35 l
1 conference call amongst all the sites going over issues and ,
. 2- comparing notes, our Dresden plant indicated that they were'
! 3 having a~ problem with the feedwater heater level' controls on l
4 4 a couple of feedwater heaters, and unprompted, the i 5 management from our LaSalle plant indicated that they would i
j 6 send over some of their engineers to that plant who had .i
! 7 recent experience troubleshooting and solving problems with 8 that very equipment.
i l 9 So I believe it is noteworthy and we are 4
10 definitely seeing on a day-to-day basis, as Oliver
- 11 indicated, unprompted -- much more frequently unprompted [
4 12 than it was even six months ago -- help and cooperation and a 13 teamwork on solving plant performance and material condition i 14 issues.
l 15 To your historic question, Commissioner ,
! 16 Merrifield, I would say that although there had been lots of
[
l 17 general talk about teamwork and cooperation amongst the
} 18 sites, in my observation, very.little had actually been l 19 accomplished before in putting in place the standards, the 20 consistent processes and then establishing the dialogue for 4
21 cooperation.
].
I 22 Turning to the focus areas under material !
~
i 23 condition or the areas for improvement, we identified that 24 we do need to improve the effectiveness of our work 25 management process. Now, this is a very complicated l ANN RILEY & ASSOCIATES, LTD.
Court Reporters i 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 :
(202) 842-0034 1
p
i S- 36- ,
1 process. It's really the means by which you focus the 2 entire organization, organize the whole site on what is 3 being done in what order at what time and with what.
4 priority. So under any circumstances, it requires
- 5 continuous management attention.
s i 6 For us, we're still growing into this, and in 7 fact, our sites are at I guess what I would call varying
} 8 degrees of proficiency at the management of their' work l
9 activities. There's a great deal of sharing amongst the 10 sites in this regard that is going on. In fact, we held a '
11 workshop almost all day on Saturday bringing together the 12 key site management from each of the sites and from Downers j 13 Grove, comparing notes, experiences, and techniques to 14 improve in this area.
15 We've been holding a number of -- this was the l 16 second in a series of planned workshops, and I think this j 17 was quite effective by way of sharing. In fact, we had the 18 different sites present different segments of the work i
! 19 management program to be the catalyst for discussion and the 20 sharing of experiences.
21 The second item that we identified for further -
22 improvement here was that we do need to refine our 23 long-term, multi-cycle improvement plans. These are the 24 plans that identify which major undertakings we intend to 25 accomplish over upcoming outages in upcoming years on the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036-(202) 842-0034
S- 37 I
1 plants. We did manage to put what would what would --
2 beyond rudimentary -- a pretty good long-term material 3 condition plan in place this year but we believe it needs to 4 be taken to a lower level of detail to further refine it.
5 Lastly, we also identified that we could use our 6 system health program, what we call our SHIP program --
7 SHIP, System Health Indicator Program, more effectively as a 8 leading indicator of conditions which warrant attention in 9 '
order to anticipate areas that need attention before they 10 consequentially reveal themselves.
11 CHAIRMAN JACKSON: Let me ask the gentleman from 12 the region -- I mean from the union if he would answer this 13 question. Do you agree that these accomplishments have been 14 made and that these are the right focus areas and do you 15 agree that having the work control planning process and the
- 16 System Health Indicator Program actually helps you to do a 17 better job in accomplishing the work and improving the plant 18 material condition? You can go to the microphone, please.
19 MR. STARR: Madam Chairman, while I am hardly an ;
20 expert on these subjects, or could I be expected to be, I
. 21 can tell you that I think there's a much more positive 22 attitude. I think there is a lot more confidence in Mr.
~
23 Kingsley as the leader of the Nuclear Division. I believe 24 that has shown through in recent times, but to speak to 25 those subjects I would have a difficult time, so that's kind ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 38 1 of where we're at.
2 CHAIRMAN JACKSON: Okay.
3 COMMISSIONER McGAFFIGAN: Madam Chairman?
4 CHAIRMAN JACKSON: Please.
5 COMMISSIONER McGAFFIGAN: One area that I think
)
6 you had performance indicators in, and I don't want you to 7 unveil the whole book, but --
8 (Laughter.]
9 COMMISSIONER McGAFFIGAN: -- but this had to do 10 with willingness of employees to raise safety issues and 11- timeliness in resolving issues.
12 How has that been going in recent months? Aren't 13 those indicators that are in your package of indicators?
14 MR. HELWIG: Yes. They are a little hard to 15 measure, but we do have -- we call them "workforce measures" 16 covering our training programs, covering what we call a 17 human resource activity index, which encompasses many of 18 those --
19 COMMISSIONER McGAFFIGAN: I have in mind more 20 the -- other licensees come in and talk about just employees 21 writing up slips in the plants and how many of those they -
22 use as an indicator.
23 MR. HELWIG: You are talking about our Problem 24 Identification Forms --
25 COMMISSIONER McGAFFIGAN: How many of those --
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
- .. ... - - -- . .- - ~ . . .. - .- - - - - . - - . -.
S- ~39 1 self-identification?-
2 MR. HELWIG: Yes. -
3 COMMISSIONER McGAFFIGAN: And then the timeliness 4 in resolving anything that gets self-identified by 5 employees. Are those indicators you.use or not?
6 MR. HELWIG: Yes,. we do have measures of.both the 7 identification of problems and self-identification. That's 8 a hard one to measure effectiveness on an absolute scale. I 9 believe in every instance at every plant our percentage of 10 self-identification has increased over the past year.
11 MR. KINGSLEY: The backlogs and the -- we call 12 them Problem Identification Forms has decreased markedly.
13 We made a number of changes in how top management is 14 involved in this process. We have simplified.this process.
15 It had become quite bureaucratic. It is now much more 16 workable.
17 COMMISSIONER McGAFFIGAN: It is a way, as I 18 understand it from other plants, of building confidence with 19 the workforce -- ,
20 MR. KINGSLEY: Right.
. 21 COMMISSIONER McGAFFIGAN: -- and communicating 22 between the workforce that you take the issues they find
~
23 seriously and you encourage them to raise them.
24 MR. KINGSLEY: Right.
25 MR. HELWIG: If we act on them in a timely manner.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.-20036 (202) 842-0034
,7 S- 40 1 'That's-Oliver's point, that there was a great deal of 2 process simplification to be done here. We have made 3 progress there and have more to do.
4 CHAIRMAN JACKSON: I would just make a ,
5 parenthetical remark, that an ultimate metric would be that 6- if you have a work control planning process ~and a system 7 health indicator program and a process model with reporting 8 that is meant to improve how the work actually gets done 9 that a metric is the extent'to which someone who works in 10 the plant is aware that such a thing exists.
11' MR. HELWIG: Yes, ma'am.
12 CHAIRMAN JACKSON: And that it actually has an 13 impact on his or her work, and so that is why I asked the 14 gentleman -- not to put him on the spot, but until-and 15 unless there is evidence that people understand this and 16 that it affects them where they live, then one could argue 17 that you haven't completely succeeded.
18 MR. HELWIG: Your point is well-taken. I think 19 given the breadth of Bill's responsibilities across the 20 entire corporation, he doesn't have the opportunity to be as
- 21 exposed to this as someone from the plant would be. -
) 22 At each of our plants the health indicators on the 23 system performance are very well known and very broadly 24 published as are the productivity numbers on what work is
- 25 being accomplished against the plan.
l t
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 -
(202) 842-0034
i ,
S- 41 l 1 CHAIRMAN' JACKSON: Okay. I accept that, so then
! 2 it would be helpful then.to hear that from someone who 1
i 3 actually. works in the' plant.
. 4 MR. HELWIG: Yes, ma'am. I think one of the real
- 5 tangible measures of the benefit of everything we have done i 6 in the material condition process areas is the amount of 1
i 7 work that we are able to do with the same workforce or i
8 actually a reduced workforce, which is much less dependent 9 upon contractors, within a period of time, whether it is a 10 week or a month, and our productivity in that regard is up.
i
! 11 substantially and maps directly to the material condition I
12 and plant reliability.
13 CHAIRMAN JACKSON: Okay.
l 1 1 j 14 MR. HELWIG: On a going-forward basis, I would 1
15 like to reiterate that through our SRI efforts we-have in l
. 16 fact been able to achieve tangible performance in each of 17 these areas. However, we do recognize that in order to l
4 l 18 improve our -- to continue our improvement trend and 5
19 ultimately to sustain the desired level of performance, 20 those require continued vigilance on our part. Nothing
. 21 works on automatic.
22 The SRIs have managed to serve as focuses for the l
!~ 23 key areas of performance that we need to be continually l
j 24 attentive to. We recognize that to ultimately be successful 25 the standards defined in these SRIs need to be embraced J
t ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
ewy v -e- - , . . . - . ,
S- 42 1 throughout the organization, just as you have indicated and 2 that we need to involve the whole team in the process of 3 continuous improvement.
4 We have nade a major step in this direction just 5 within the last several months by establishing an incentive 6 program that includes all NGG employees -- management and
~
7 hourly workforce -- in an incentive-based program based on 8 the accomplishments of our improvement goals and the- .
9 improvements in performance that we actually will achieve.
10 That is a significant accomplishment, we believe.
11 Nevertheless, we do recognize that there's much more to do.
12 We understand that workforce engagement and 13 continuous improvement must be a way of life, and we are 14 committed to making that happen.
15 COMMISSIONER DIAZ: Madam Chair?
16 CHAIRMAN JACKSON: Please.
17 COMMISSIONER DIAZ: Yes. In the last briefing you i
l 18 commented that in the recent years in reality you have been 19 trying to use or living up to NRC performance standards and 1
l 20 that you intended to take this activity and make it i
21 Commonwealth Edison's. .
22 MR. HELWIG: Right.
23 COMMISSIONER DIAZ: To what degree have you l
24 succeeded in -- because I think this is a good performance 25 indicator -- you stand on your own feet and do it.
l l
ANN RILEY & ASSOCIATES, L1D.
Court Reporters ;
1025 Connecticut Avenue, NW, Suite 1014 !
- Washington, D.C. 20036 l (202) 842-0034 w
4 S- 43 1 MR'. HELWIG: Right. It's a difficult one to 2 actually measure but a very fundamental issue. :
3 I personally believe that we have made a 4 substantial shift there. I think just the discussions that 5 we have with our management team -- I can't think of 6 occasions recently where issues are discussed in terms of 7 satisfying the NRC instead of satisfying us. If we have an 8 incident, if we have something that needs to be [
9 investigated, it is prompted by us. It is in fact pursued I !
10 think pretty effectively at this point in terms of the ,
i 11 learning opportunity that it represents for us to learn the 12 fundamental ist tes that underlie a problem that we- encounter 13 and then share it across the sites, so I really believe that j i
14 the feel of how things are conducted has changed 15 substantially in that regard.
16 I think we are setting the standards.
17 MR. KINGSLEY: Let me give you an example. We 18 have has some radiation protection deficiencies at LaSalle 19 County. We identified that. Our corporate oversight plan 20 identified the issues and I was talking to the Regional P
. 21 Administrator and he pointed that out. NRC also identified 22 it. We had already asked for a meeting with the NRC to come 23 in and explain what we were doing without being prompted in 24 .that area, so I think it is taking hold.
25 It still needs more work but we have made ;
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 ,
Washington, D.C. 20036 1 (202) 842-0034 !
. . - - - - . - - - - - - - .- . - . . . - -~ . .- - . . - -
S- 44 i ;
i i substantial progress in taking accountability for what these ,
i
! 2 standards are and actually saying that they are ours versus !
l
- 3 what someone else is imposing upon us, Commiscioner Diaz. '
4 COMMISSIONER DIAZ: So you are more in control of k
5 your destiny, is that how you --
^
6 MR. KINGSLEY: Yes, yes.
7 COMMISSIONER DIAZ: Thank you. !
t .
- 8 CHAIRMAN JACKSON
- Please.
i 9 MR. HELWIG: I will now turn the presentation over 10 to Chris Crane, who will discuss the BWRs. l 11 MR. CRANE: Thank you, David. Good morning. I am i 12 Chris Crane, the Vice President responsible for the BWRs and j 13 I will be reviewing their accomplishments and current l 14 performance. ,
i i 15 Each of the BWRs has taken significant steps ~ ;
i
- 16 forward in their performance but we do have a clear ,
! 17 recognition that there is more work to be performed to reach i 18 that top quartile performance.
j 19 First, I will start with Quad Cities. Throughout t
20 1998 and into 1999 Quad Cities continues to be engaged in .
21 systematic improvement efforts. We have addressed ,
22 long-standing material condition issues and we are also 23 improving work practices in raising the performance 24 standards. ,
l 25 The results have been measurable in the current 1
?
2 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036
.(202) 842-0034 '
J S- 45 1 performance improvements in comparison to the past station 2 performance.
3 Overall we believe that the decline in performance 4 at Quad Cities has been arrested and the performance 5 continues to improve. However, we do have challenges 1
6 remaining and our attention is on sustaining this improving 7 trend.
3 8 These charts that are up right now provide the 9 high level Quad Cities performance indicators. Since the 10 units restarted in June of '98, the capacity factor has been 11 at 87.2 percent. The INPO performance indicator has been 12 remaining steadily the same. Some of those are related to 13 the long-term shutdown. As it works off the two year 14 average the performance indicators will improve.
15 Clearly the number of automatic scrams is still 16 high. This reflects three scrams that occurred soon after 17 restart between June and September of '98. Like I 18 mentioned, they were soon after restart. We have since 19 implemented scram reduction efforts. These efforts have 20 been effective and we are expanding their scope.
. 21 Finally, the last -- on the bottom of the chart --
22 is the forced outage rate, which has steadily decreased in
~
23 an improving direction.
24 CHAIRMAN JACKSON: Let me ask you two questions.
25 Can you speak a little bit to the more recent draindown ,
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 46 1 event, inadvertent draindown?
2 MR. CRANE: Yes. I was going to talk to that. We 3 were last week performing a nine-day surveillance outage at 4 Quad Cities. In the evolution of the outage we did have a 5 lapse of performance in the operations area which is below 6 our standards, and it is below what we have seen in past 7 performance from Quad Cities. We took the opportunity to 8 capitalize on the event. We assembled from Downers Grove, 9 from the corporate organization, an event team that went in.
10 We had our support vice president, operations support. We 11 had other members from the corporate organization. And we 12 also took an SRO shift manager and event analysis 13 individuals from the other stations, and went in to start to 14 do the root cause analysis.
15 At this point, the final root cause analysis is 16 still underway and we expect that to be complete by Friday, 17 but some of the preliminary indicators and some of the 18 interim actions that we have taken are directly focused in 19 the execution and work management oversight in the 20 operations area. Some coordination of in control room rnd 21 in remote location field communications are needing to be .
22 strengthened to avoid these lapses. So we will continue to 23 evaluate the event and also be spreading these lessons 24 learned out to the other stations through the shift 25 supervisors and tne other team members that were evaluating ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 47 1 the event.
2 CHAIRMAN JACKSON: And what did you learn from the ,
3 December issue related to 3ssessing the risk significance of 4 the lack of availability of the station blackout diesel 5 generator?
6 MR. CRANE: Again, it ties into work management 7 and oversight. We are rolling the September scram from Quad 0 Cities in with the station blackout event, the diesel that 9 was taken out of service, in this recent event, and doing an 10 analysis on the aggregate. That specific event, we had the 11 programs and processes in place to perform the risk analysis 12 to take out multiple fire protection detection in tending 13 equipment systems.
14 There was a change in the scheduling process. ,
15 There was not the proper impact evaluation of that work 16 management window after the change had taken place.
17 Previously analyzed, understood what was going to come out 18 of service, was by the matrix, and allowed to be performed.
19 Emergent work came in and was not properly impact-reviewed 20 by the shift personnel.
. 21 CHAIRMAN JACKSON: Well, the question then for me 22 becomes if I go back to the earlier slides, which were more
~ '
23 generic, having to do with work control process, what does 24 this tell you in that regard?
25 MR. CRANE: It'G in the process of peeling back ,
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 48 1 the onion. First there was a process, a very good process l 2 put in place that controls the activities. There are cycle 3 plans that tell us what we have to do over the year; there's 4 12-week rolling windows that tell us what we are doing.
5 There are divisionalized or train set-up so we would not be 6 taking out redundant equipment at the same time. Each part 7 of that process or phase is being trained on and each of the 8 -- as we get into this event evaluation, we are finding that .
9 we need to strengthen the operations interface and 10 oversight, not in the pre-planning, but in the execution and 11 in some potential changes that can occur during the 12 execution. So it is continuing to drive down on the focus 13 on the implementation.
l 14 CHAIRMAN JACKSON: Okay. Yes. l l
15 COMMISSIONER McGAFFIGAN: Madam Chairman. The 16 event that you are talking about, the station blackout 17 diesel generator being out, one problem was that we found, 18 as I understand it, it was our inspector in the, you know, 19 the significant reactor finding that was written up about it 20 says initial licensee corrective actions were poor, problem 21 identification form was first closed as a data point without ,
22 identification of where the on-line risk assessment process
~
23 broke down, et cetera. It took a while, a couple days, as I 24 understand it, before the issue was finally understood, and 25 so there's -- it was an inspector from the NRC finally, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 49 1 which I am sure Mr. Kingsley does encourage, and then not 2 promptly figuring out that there was a significant risk 3 situation, that the inspector was basically right. And so I 4 don't know whether you want to comment about the slowness of 5 corrective action in that case -- or not -- of figuring out 6 what state you were in.
7 CHAIRMAN JACKSON: It raises two issues. One has 8 to do with work control, and the actual execution, and the 9 other has to do with having an overall, you know, effective 10 corrective action that's predicated on the awareness of the 11 risk significance of -- and since where we are going in our 12 regulatory program will give increased emphasis, you know, )
13 to these kinds of things, it is a significant issue from 14 that point of view. I i
15 MR. CRANE: We are continuing to evaluate, as I 16 said, in the aggregate some of the immediate recognition or 17 the immediate recognition that we have on this is there was i
18 a new planning process put in place, risk planning for the I 19 Appendix R and the fire protection issues. There was not 20 the sensitivity to that through self-identification or the I o 21 immediate evaluation, and there was prompting, which is well 22 below our standards. That is not acceptable. What I can 23 tell you is we have capitalized on the event, used it to
, 24 train and emphasize that there is some significance, and 25 this is the process that you follow.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
1 S- 50 1 The initial review was as it was identified, we 2 need to have some barriers in place to not let this happen.
3 The answer was very shallow, the barriers are in place and, 4 as I said, it is below our standards and we did learn from 5 the event.
6 MR. HELWIG: If I could add a comment or two on 7 this. We do have the standard methodology in use at all of 8 the sites to consider risk during on-line activities. The 9 only thing that is unique at Quad Cities is there are some 10 special considerations that have been put in place limiting 11 fire protection equipment. That standard methodology has 12 been serving us quite well at all of the sites, including 13 Com Ed -- including Quad Cities. In fact, we have received 14 recognition of the strengths of that program in evaluations 15 at LaSalle performed both by the NRC Staff and by INPO in 16 just recent months.
- 17 So the basic process, we believe, is quite strong, 1
- 18 is quite robust, is as good as any in the industry. As I 19 indicated, there was this uniqueness at Quad Cities and, as l
- 20 Chris indicated, the recognition of the deficiency in 21 implementation and its import to us was below our ,
22 expectations.
, 23 CHAIRMAN JACKSON: And ours.
24 MR. HELWIG: Yes, ma'am.
t
, 25 MR. CRANE: I understand.
i.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
4 I
S- 51 l 1 Since the restart in June '98, the station has ;
t 2 accomplished sustained dual unit operation. The station'did j 3 complete a well executed 28-day refueling outage on unit-1 1
4 with no significant events, and an improved material
< 5. condition of the plant.
6 As mentioned, we completed a short surveillance
Over the weekend we brought the 7 outage on unit 2 last week.
- 8 unit back up, taking the opportunity to again improve the 9 material condition while we are performing the required f 10 surveillances.
i 11 The oversight function performed by the onsite and i 12 the corporate organizations has been significantly i 4 j 13 strengthened. The station has implemented improvements to !
! l l 14 enhance the quality of the engineering products, including J
l 15 the calculations, plant modifications in the 50.59 16 evaluation, safety evaluations.
l 17 Engineering support of operations in technical i 1 j 18 programs has continued to improve. The backlog of our ;
19 engine? ring requests has been reduced by more than half.
l 20 " ext slide, please.
4 21 As I mentioned a moment ago, we are correcting ]
22 longstanding equipment issues at Quad Cities. A number of
~~
23 longstanding material condition issues were corrected in the,. ,
1 24 refueling outages and the shutdown in '97, '98. For i
25 example, there's the feedwater heater level control system 1 i j 1
k.
- ANN RILEY & ASSOCIATES, LTD. l Court Reporters !
1025 Connecticut Avenue, NW, Suite 1014 )
, Washington, D.C. 20036 j (202) 842-0034 H
S- 52 1 and the standby liquid control system. The operator 2 challenges have been reduced. For example, operator 3 work-arounds hcVe been reduced by about half, and control 4 room distractions have been reduced by more than a half. We 5 lowered the non-corrective maintenance backlog by about 65 6 percent.
7 Other accomplishments and results include thy fire 8 protection program improvements. We are map'mg -- we made 9 our commitments and we are meeting our dates. The 10 fire-related core damage frequency has been better defined 11 to be in line with other BWRs, and we have specific plans 12 for further improvements.
13 Significant human error events decreased by 88 14 percent from the first half of 1998 to the second half of 15 1998. Operator errors related to out-of-service has 16 improved, but we still continue to use that as a focus area 17 in the operations department.
18 The chemistry performance index is within the 19 industry's top quartile.
20 CHAIRMAN JACKSON: Let me ask you one question, 21 this is going back to the Unit 2 reactor vessel drain down 1 22 event. Is that considered a significant event vis-a-vis 23 INPO significant events?
24 MR. CRANE: We have not heard from the evaluation 25 of the screening from INPO. We were in contact with INPO ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 w
I S- 53 1 over the event. We actually had an INPO assist individual 2 that came up and worked on our evant investigation team. I 3 think it would be premature to j ~1ge that. Other instances 4 similar to this that we have reviewed as we are doing our 5 OPEX or operating experience through the INPO database where l 6 depicted as noteworthy, which is one threshold lower, but 2 ' 7 they were not significant events. But that will be up to 8 INPO, and we will be watching to see that come out.
j 9 CHAIRMAN JACKSON: Right, because the Quad Cities 10 performance assessment that you sent to us said there were
- 11 no INPO significant events for 1998.
12 MR. CRANE: Right.
13 CHAIRMAN JACKSON: And this occurred this year, 14 and I was just curious as to whether this would cross the 15 threshold of an INPO significant event. I mean it went down 16 by 40 inches and 6,000 gallons, right?
17 MR. CRANE: Right. In the OPEX database there are 18 more significant drain downs that would relate to 19 noteworthy. 1 1
j 20 CHAIRMAN JACKSON: Right. Okay. 1 4 3 21 MR. CRANE: Our focus areas, as I mentioned, the 22 declining trend in Quad Cities performance has been arrested 23 and performance is improving overall. Continued efforts in 24 a number of areas are necessary to achieve the top level of 25 performance. We have set our goals, specifically, i
l i
ANN RILEY & ASSOCIATES, LTD. I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 ,
(202) 842-0034
S- 54 1 operations, to continue in the ascension in the leadership 2 role. We will continue to focus on improving the human 3 performance, attaining the highest level of control room 4 performance standards and eliminating these configuration 5 control errors.
6 Management is supporting the improvements in the 7 work control process. The station plans and work schedules 8 include specific material condition improvement plans to 9 eliminate repetitive equipment failures, reduce operator 10 challenges and also enhance the equipment reliability.
11 We are focusing on reducing a number of 12 maintenance rule systems. We were at 60, we are currently 13 down to 25 and, by the end of the year, our plans have us at 14 eight. As Oliver previously described, we are taking 15 actions in the area of radiation exposure.
16 Therefore, in summary, the decline in the 17 performance has been arrested. The performance trend is 18 improving and our goal is to.custain this improving trend.
19 CHAIRMAN JACKSON: Should capacity factor be 20 relevant to us as regulators? What is the safety tie?
21 MR. CRANE: The capacity factor is an indicator of L 22 material condition and challenges to the operations 23 department. It has its business connotations, but as far as 24 our review in this context, it is how well the plan is 25 maintained and operated.
i I
ANN RILEY & ASSOCIATES, LTD.
l Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 !
Washington, D.C. 20036 !
(202) 842-0034 l
. . 1 S- 55 1 Without anything else, I will move on to LaSalle. I 2 Since the last update, we have restarted LaSalle.
3 MR. ROWE: Excuse me. I would just like to add 4 somt:bing to that response. Obviously, capacity factor 5 cannot be a prime focus of the Commission's attention, we 6 understand that. And, yet, it-seems to me that, i "
7 increasingly, operating, learning suggests that safety l
8 factors and productivity factors are more often part of a 9 mutually reinforcing web than they are tradeoffs. We all 1 l
10 worry about the situation where they can become a tradeoff.
. l 11 As you said on a number of occasions, you have no doubt i 12 about where your obligations are if that tradeoff exists.
13 But it seems to me that the chronic problems at 14 Comed, and I think this goes back a bit to Commissioner 15 Merrifield's question, you know., have shown up both in 16 performance under regulation and standards, they have shown 17 up in capacity factors. They have also, strangely enough, 18 shown up in the economics of the operation. And getting at 19 them from both a material condition level and from an 20 operating professionalism level turns out to be a unified
, 21 effort. I wouldn't contend that to you capacity factor is 22 anything more than a secondary indicator, but I don't think 23 it is a meaningless one.
24 CHAIRMAN JACKSON: No, I ask because in each of 25 the unit presentations, you lead with capacity factor. And, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
i S- 56 1 of course, I have a' background question for each of those
! 2 viewgraphs, which is, -- how does that improver..ent relate to 3 those things that are of significance to us as the ,
- 4 regulators, and.how do you tie the two together?
5 MR. HELWIG: In fact, as we have mapped out the-6 material condition processes, we consider the capacity
} 7 factor, scram frequency and unplanned capability loss factor
! 8 top level indicators of overall plant performance, based on
~
l j
9 the theory that they could not be achieved without superior l 10 material condition. So we have mapped out the underlying
- 11 processes, and we use that because it is overall 12 representative of what we believe to be a number of 13 supportive processes that need to be effective in order to 14 achieve those outcomes Your point is well taken, it is not l
+ 15 everything.
- 16 CHAIRMAN JACKSON
- Okay.
! 17 COMMISSIONER DIAZ: But, in fact, it is an 18 integral factor. I 19 MR. KINGSLEY: Absolutely.
20 COMMISSIONER DIAZ: It represents all of the 21 things that are happening in the plant. '
. 22 MR. KINGSLEY: It is also a very --
23 COMMISSIONER DIAZ: It might be a little gray or a
- 24 little blah, but it is an integral factor.
25 MR. KINGSLEY: I totally agree, it is an indicator
, ANN RILEY & ASSOCIATES, LTD.
, Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
S- 57 ,
1 of -- Are you doing it right? Do you put material 2 condition? Do you have scrams, operating events while you 3 are operating? Do you do your surveillances? Do you have 4 your act together? So it is a clear indicator of nuclear 5 safety to me. It is not the only one.
6 CHAIRMAN JACKSON: You have to lift the blanket to 7 be sure you understand to what extent it is an indicator of 8 nuclear safety, that is the only point I wanted to make.
9 MR. KINGSLEY: Absolutely. Yes, ma'am.
10 CHAIRMAN JACKSON: And if you don't lift the 11 blanket --
12 MR. KINGSLEY: And not be a steamer, you know, and 13 just operate your plant at all costs.
14 mIRMAN JACKSON: That is the point.
15 MR. KINGSLEY: We have told you -- right.
16 CHAIRMAN JACKSON: Because capacity factor can be i
17 high either way. And so if you don't life that blanket, you l 18 don't necessarily see that.
19 COMMISSIONER MERRIFIELD: Chairman?
20 CHAIRMAN JACKSON: Please.
- 21 COMMISSIONER MERRIFIELD: Following along that j 22 same line, and I am getting ahead of you, but if you look 23 at, for LaSalle, the difference between the capacity 1
24 factors, which are very high, and your average performance l
25 index, which is not where I think you want it to be, and l
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters l 1025 Connecticut Avenue, NW, Suite 1014 i Washington, D.C. 20036 l (202) 842-0034
S- 58 1 part of my problem in understanding this and being somewhat 2 new, I am not really clear of the inputs that go into that 3 performance index.
4 CHAIRMAN JACKSON: Right. And this is the 5 furthest away from that meeting, that INPO standard of all 6 the plants, and so that was --
7 MR. CRANE: I will be covering that.
8 MR. KINGSLEY: We are going to cover that. It is 9 a two year average. It takes -- all the shutdown is figured 10 in that, and so that is the reason those numbers are down.
11 COMMISSIONER MERRIFIELD: Okay.
12 MR. KINGSLEY: If it reinitialized when we 13 restarted on Unit 1 --
14 CHAIRMAN JACKSON: Yes, it is a lagging indicator, 15 is what you are saying.
16 MR. KINGSLEY: It is very lagging, right.
17 COMMISSIONER MERRIFIELD: It's two year. Okay.
18 MR. KINGSLEY: Chris.
19 MR. CRANE: Okay. The LaSalle Station, since the 20 last update, we have restarted Unit 1 at LaSalle. Startup 21 went very well. Subsequent operations have been solid. We 4 22 are transferring the lessons learned from that startup into 23 the recovery of Unit 2, and we expect Unit 2's restart to be 24 much smoother.
25 Proactive involvement in oversight by the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue,1NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
. .-. - -- .. - .- - - - . _ . - . - _. .. - .~. - - ._ .- -
S- 59 1 corporate organization has helped in addressing the issues i 2 that came up during the Unit 1 startup. We expect the l 3 corporate organization to continue to help the Unit 2 i
j 4 startup effort, but we now have a stronger team in place at S the site.
i
- 6 Looking at the Unit.1 performance since restart,
!' 7 the capacity factor is 91.5 percent. The INI?O index has I 8 steadily improved, but, as we discussed, the value will be 9 held down by the long rhutdown period till it rolls off.
10 There have been no automatic scrams or forced outages since 11 the retest program was completed.
l 12 And, finally, our mid-cycle outage was well 13 planned and executed, event-free, and we took the 3
- I j 14 opportunity to do some fine-tuning and calibracions on I
i 15 systems that were identified during the startup process. ,
! 16 Next slide, please.
I 17 COMMISSIONER MERRIFIELD: Let me -- Chairman, I 4
- 18 don't want to focus too much on the average performance 1 19 index, but just so I understand, do you think that will e
l 20 naturally without further changes reach the industry median, j- 21 or are there additional changes that you will need to make
- 22 from where that will naturally go to the point where you 23 need to be? I mean, I guess that's -- I understand the i
24 issue of two-year averaging, but if we come back in two 25 years, are you going to be at the median? And I guess
' ANN RILEY & ASSOCIATES, LTD.
- Court Reporters 4
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034'
~
l I
l S- 60 l l
1 1 that's -- are you doing what is necessary to be there? j 2 MR. CRANE: The goal is for top-level, 3 top-quartile performance by 2001. If you look at the 4 attributes of the index as mentioned there, lagging )
5 indicators, approximately 30 percent is based on if the 6 unit's running or not. So there is a major penalty factor 7 on that. Just operating a unit will take a jump in that 8 pe formance.
9 The other is implementing the processes and the 10 standards that are being incorporated at the other sites.
11 Reduction of radiation exposure, the plans for that.
12 Reduction of radwaste, the plans that are in place for that.
13 The human performance issues also have a strong 14 contribution. So there is a gap analysis that's laid out 15 for each of the attributes within the index and there are 16 plans in place to bring it to top-quartile performance.
17 MR. KINGSLEY: Yes. Let me -- I've got the direct 18 indicator right here. And there's nine of these. On all 19 the areas where we can count the data, and it's absent 20 capacity factor and unplanned capability loss factor, which 21 we get no points for those, we're a couple points off from '
22 the max values on those. So we're doing everything we can 22 on LaSalle 1 right now under our control. Then we have to 24 operate a little bit, and we're almost there on these. I 25 said a couple points off. So absent the -- we're moving ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
S- 61 l l
1 this history, we're going to not only come to the industry 2 meeting, we're going to surpass it. l l
3 COMMISSIONER MERRIFIELD: Thank you.
4 MR. CRANE: Okay. Accomplishments contributing to 5 the performance results have included the maturity, and as I 6 mentioned before, the strength of the management team that's !
7 in place. The team is working efficiently and effectively 8 together.
9 Together with the site management team we're 10 implementing the operating fundamentals within the site 11 organization such as improved troubleshooting techniques and 12 a heightened attention to critical and sensitive evolutions.
13 Since these accomplishments we've achieved 14 significant results which include material condition 15 improvements. The corrective maintenance backlog for Unit 1 16 has been reduced by 40 percent since restart.
17 The engineering request backlog for Unit 1 has 18 been reduced by 90 percent. All the backlogs are defined in 19 their being tracked and trending in the correct direction.
20 We also resolved a number of longstanding design issues
- 21 including the control-room ventilation system and the 22 feedwater heater drain system, allowing those systems to 23 operate in auto and perform as designed.
24 Next slide, please.
25 On to the next steps. The LaSalle Unit 2 restart l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l Washington, D.C. 20036 I (202) 842-0034 l
i l S-- 62 !
i
! 1 is on track. Our time frame for fuel load is in April, I i 2 scheduled for a May startup. But we are conducting all'the l 3 necessary reviews and challenges as was done for Unit 1 to l 4 ensure the readiness for Unit 2 restart and successful
$ 5 dual-unit operation, i
6 In this regard we have a thorough restart plan.
1 l,
7 The Unit 2 restart plan has been enhanced by the Unit 1
! 8 lessons learned. For example, we have bebter defined the .
- ~. i l 9 engineering work scope and completed the initial work scope 10 prior to the field work starting. ,
} 11 CHAIRMAN JACKSON: Are there major license i i 12 amendments that relate to that?
13 MR. CRANE: No, there are no major license -- I 14 think we had a couple ISI that are still outstanding, and ;
15 I'd have to go back to the project plan. We do review the T
16 project plan monthly, and there's no major issues 17 outstanding right now.
I 18 MR. HELWIG: Actually I don't think there are any, i 19 Commissioner. ,
20 CHAIRMAN JACKSON: Okay.
21 MR. CRANE: In addition the restart work scope is * !
t 22 defined and scheduled, the system readiness reviews have 23 taken place in the system testing, and turnover schedules 24 are being followed and are well under way.
r 25 Furthermore, in preparation for the dual-unit ANN RILEY & ASSOCIATES, LTD. !
Court: Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036
.(202) 842-0034
l S- 63 1 I
1 organization we've merged the two units' resources into one !
2 site organization. We established a single outage control 3 center and a single work control center. We've also put 4 back in place the Unit 2 control room supervisor for 5 overseeing the operations, and the crew training for 6 operations for the restart is scheduled to be completed in 7 April. We're in that training cycle currently.
8 Our readiness reviews and assessments are focused 9 on dual-unit operation. The reviews involve assessments by 10 all levels of management up to and including Mr. Kingsley, 11 our chief nuclear officer, as well as our independent 12 offsite safety review board.
13 Next slide, please.
14 On to our focus areas. In terms of continued ,
i 15 improvement across the station, we're focused on work 16 management, human performance, configuration control, 17 chemistry, and radiation protection.
18 With respect to the radiation protection, we 19 recognize we have issues to be addressed in this area. We 20 have discussed as previously mentioned these steps with the
. 21 regional personnel, and the corrective actions are well I I
22 under way. We have, however, achieved some improvements in
~
23 this area. For an example, we've reduced the contaminated 24 square footage in the unit by 35,000 square feet. Currently 25 we're at approximately 4 percent contaminated square footage ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
S- 64 1 with the outage activities going on. That will improve as 2 the Unit 2 is restarted.
3 In summary, we're working towards a solid, safe, 4 dual-unit operation at LaSalle Station.
5 No other questions on that, I'll turn to the 6 Dresden Station.
~
7 Dresden's a leader in many of our areas of 8 improvement at Comed. They include' work management 9 operation standards and outage management. The Dresden 10 plant performance has been strong. The capacity factor in 11 1998, 85.3 percent, was the best ever for the site. The 12 INPO performance index has improved to 87.2. The number of 13 automatic scrams is decreasing and the forced outage rates 14 is improving.
15 We did set a site record for dual-unit run. It 16 was 173 days, which ended when Unit 3 shut down in January 17 for its refueling outage.
18 Finally, the Unit 3 refueling outage was 19 completed, well executed, in a planned 26 days.
20 Next slide, please.
21 There are a number of factors contributing to this a 22 level of performance. As we told you in the last meeting, 23 we have implemented a number of the scram-reduction 24 initiatives, including some from the industry. We have 25 reviewed 24 risk-significant systems identified, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 65 1 prioritized, and are working through the plans. The actions
- 2 are incorporated into our one and three-year material 3 condition plans.
4 Some examples of the initiatives, the reduction of 5 time in half-scrams at the Dresden station, we went from a 6 previous 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> per month to 10 minutes per month, reducing 7 the frequency of entering into the half-scrams from 200 to
- 8 about 10 per month. Those same improvements have been 9 incorporated also at Quad Cities and Dresden -- LaSalle and 10 Dresden.
11 We also have substantially improved the site 12 material condition, which is evident by the reduction in the 13 backlogs. At Dresden the nonoutage corrective maintenance 14 backlog has been reduced by 60 percent, and the engineering 15 request backlog has been reduced by about 60 percent.
16 Operations also is better at Dresden. Not only 17 has operations management assumed the leadership role, but 18 the human performance has greatly improved. From the first 19 half of 1998 to the second half of 1998, the operational 20 human performance errors have been reduced by 55 percent.
l 21 We've had significant improvement in the effectiveness of 22 operations being supported by the engineering department.
23 And finally, we've reduced the radiation exposure at Dresden 24 by some 30 man-rem per person per unit.
25 CHAIRMAN JACKSON: Now late last year there seemed ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 66 1 to be'some issues, minitrend anyway, with respect to 2 operators not identifying applicable tech spec requirements.
3 Where do things stand in that regard, since you've mentioned 4 better operations?
5 MR. CRANE: In the latter part of the summer there 6 were multiple cases of that that occurred. The steps were 7 put in place. There was an assessment done, evaluation of 8 what the gaps were. There needed to be some more training 9 performed, a heightened awareness. We had some shift c
10 sponsors and mentors placed on shift with the operating 11 staff to coach them through, and since that time we've had 12 flawless performance. I believe it's on five months now 13 without an issue. .
14 Moving Dresden to the next level of performance 15 we'll bc continuing to focus on our material condition 16 improvement plans, further human error reduction 17 initiatives. We're also ongoing with our engineering 18 program improvements. Finally, we'll continue to reduce our i
! 19 radiation exposure.
20 In summary, Dresden has had solid, event-free 4
21 performance since we were last here. We've had a '
22 significant accomplishment, including the highest capacity
. 23 factors ever, the longest dual-unit run, and a significant I
l_ 24 backlog reduction,.and we're focused on sustaining these j 25 improvements, i
- 1001 RILEY & ASSOCIATES, LTD.
Court. Reporters 1025 Connecticut Avenue, NW,. Suite 1014 Washington, D.C. 20036 (202) 842-0034
~l S- 67 1 Without any other questions, I'll turn the 2 presentation over to Gene Stanley.
3 MR. STANLEY: Thank you. Chris, I am Gene 4 Stanley, the Vice President responsible for pressurized 5 water reactors. We are bringing a new, more rigorous level 6 of scrutiny to the PWR operations to ensure they maintain 7 and improve their performance.
8 Specifically, we are comparing ourselves to the O
9 best industry performance. We have identified some 10 low-level issues. As we do this, I am going to talk to you 11 about them today as well as our accomplishments. Next 12 slide, please. !
13 Byron Station -- Byron plant performance when 14 viewed by top-level measures has been good. The capacity 15 factor of 85.6 percent --
this includes part of steam 16 generator replacement outage and a Unit 2 refuelling outage.
17 The INPO performance index has continued to 18 improve -- to 92.3 -- the highest ever for the station. The 19 number of automatic scrams for the last 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br /> critical 20 is zero. The last scram was in October of 1997.
. 21 The forced outage rate for the ) ar of 1998 and 22 this year is zero.
~
23 This station has historically received high marks, 24 both form INPO and from the NRC. Byron continues to do many 25 things well. For example, the implementation of improved ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I 1
S- 68 l
1 tech specs, improvements in the out of service errors since 2 June of last year. In general, they do a good job of 3 problem-solving. They handle equipment problems well.
4 Overall Byron currently is at its highest level of 5 performance. Even with this good performance, however, we 6 have identified some low-level issues in need of improvement 7 to reach top level performance. These issues have revealed 8 themselves in the area of material condition, especially in 9 condenser tube leaks, which affects many things including 10 chemistry performance:
11 Radiation protection practices during the steam 12 generator replacement outage as well as refueling outages 13 were weak; 14 Human performance errors, some of which are 15 related to configuration control events and procedural 16 adherence issues; 17 Consistent application of the fundamentals needs 18 greater emphasis by the management team at Byron Station.
19 These issues, identified as a result of management 20 applying a higher level of rigor and intrusiveness, these 21 are longstanding, not new issues, at Byron Station.
- 22 We also are addressing the issue of overtime at 23 Byron Station. This has been a subject of management 24 attention since last fall. We have had and continue to have 25 adequate staffing. As far as the Operating Department is ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 69 1 concerned, from 1995 to 1998 the number of Operations 2 personnel at Byron Station has increased from 152 to 172 3 personnel. Therefore, this is not a resource issue.
4 With respect to the use of overtime, although we 5 are continuing to review the issue, our preliminary results 6 indicate that overtime is not being used excessively or 7 routinely at Byron Station. Between 1997 and 1998 we 8 reduced the use of overtime at Byron despite back-to-back 9 outages, the completion of the steam generator replacement 10 outage, and the refueling outage by some 16 percent.
11 Nevertheless, from our perspective the fact that 12 this issue is being raised is very important to us. We are 13 continuing to review the issue at all of our stations as 14 well as Byron.
15 CHAIRMAN JACKSON: Mr. Stanley, given what you 16 have said in terms of the actual statistics --
17 MR. STANLEY: Right --
18 CHAIRMAN JACKSON: -- what then from what you can 19 discern is the genesis of the complaint?
20 MR. STANLEY: As probably Mr. Starr would tell
. 21 you, we have people that want to work all the overtime that 22 they can possibly get, and we have people that want to work 23 no overtime, and we do work overtime at the stations to 24 support refueling outages and on times when people are 25 absent on vacation, et cetera.
1 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 ,
(202) 842-0034 1 1
S- 70 1 I think there's a very small number of individuals 2 that have a concern about the amount of overtime and we are ,
l 3 concerned about the amount of overtime. ,
l 4 CHAIRMAN JACKSON: Well, I guess -- I mean I want 5 to understand it because, you know, this is the kind of 6 thing that down the line ends up becoming allegations --
7 MR. STANLEY: Yes.
8 CHAIRMAN JACKSON: -- coming to us, and so I need 9 to really understand precisely how you are getting at the 4
10 root of the issue.
11 MR. STANLEY: I understand. It is an issue that 12 is in front of us now relative to allegation space.
13 CHAIRMAN JACKSON: So what more can you tell me?
14 MR. STANLEY: I think we need to make sure that 15 when these issues are raised at the stations they are 16 addressed and addressed responsively and doing that quickly 17 back to the individual, so that the individual understands 18 that we are concerned also and we are taking action.
I 19 COMMISSIONER McGAFFIGAN: Madam Chairman, could I k 20 just get some factual data?
21 Overall overtime went down, but there are these -
22 tech spec limits that come out of TMI experience that are in 23 everybody's tech specs and there are exceptional 24 circumstances, exceptions, where you can go beyond those 25 limits.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW , Sui te 1014 Washington, D.C. 20036 (202) 842-0034
S- 71 1 Do you go beyond those limits and -- you know, the i l
2 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per week, the no more than, what is it, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or )
I 3 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a day -- I forget -- they are in the Dingell 1 4 letter, but what are tha, how often do you exceed these 5 limits? Is it routine or is it very, very --
l 6 MR. STANLEY: There was in the Operations !
7 Department during 1998 there was 45 deviations from those 8 limits filled out during the year, so we went outside of 9 those limits 45 times.
10 The issue then becomes most of which of all of the 11 deviations focus around outage time. During this timeframe 12 we spent 105 days in outage during 1998.
13 COMMISSIONER MERRIFIELD: Just to clarify, when 14 you say 45 deviations, do you mean that there were 45 i 15 individuals whose hourc deviated --
16 MR. STANLEY: No.
17 COMMISSIONER MERRIFIELD: Explain what -- does ;
l 18 deviation --
19 MR. STANLEY: When you exceed any of the criteria 20 that is identified in 82.12 then you are required to
- 21 pre-approve in a deviation format. That occurred 45 times d
22 .during 1998.
~
23 CHAIRMAN JACKSON: It doesn't necessarily track to 24 number of individuals?
25 MR. STANLEY: Right.
i I
ANN RILEY & ASSOCIATES, LTD. !
Court Reporters l 1025 Connecticut Avenue, NW, Suite 1014 i Washington, D.C. 20036 I (202) 842-0034 l
~S- 72 1 CHAIRMAN JACKSON: It's instances.
4 2 MR. KINGSLEY: 45 times, 45 approvals of time 3 prior to use is what it means. It doesn't.necessarily tie -
4 to an individual. It is an individual occurrence against i
5 those --
6 D,P11ISSIONER McGAFFIGAN: So it could be multiple
~
7 individuals on each recurrence?
8 CHAIRMAN JACKSON: Right. -
9 MR. KINGSLEY: No. Not true at all.
t 10 COMMISSIONER McGAFFIGAN: No?
11 MR. STANLEY: That's what the --
12 COMMISSIONER McGAFFIGAN: -- my question was. ;
13 MR. STANLEY: -- the Commissioner's question was.
14 No -- not.
l 15 MR. KINGSLEY: Single. Single occurrence.
16 COMMISSIONER MERRIFIELD: So it is per individual -
- 17 they're referring to.
! 18 CHAIRMAN JACKSON: It doesn't necessarily equal 45 i
19 individuals --
l
- 20 MR. STANLEY
- No.
I 21 CHAIRMAN JACKSON: It could be one individual more - !
22 than once.
23 MR. STANLEY: Right.
. +
24 MR. KINGSLEY: Absolutely.
25 COMMISSIONER MERRIFIELD: Okay I was ;
l i.
ANN RILEY & ASSOCIATES, LTD.
- Court Reporters 1025' Connecticut Avenue, NW, Suite 1014 3 l
Washington, D.C. 20036- i (202) 842-0034- ;
l i
S- 73 1 inarticulate. I meant 45 individual excedences. Okay, that 2 explains it.
3 COMMISSIONER McGAFFIGAN: In some of the limits I 4 have now in front of me from 82.12 the 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> pariod --
6 CHAIRMAN JACKSON: Right.
7 COMMISSIONER McGAFFIGAN: -- is one that -- 24 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period and no more than 72 in a week --
9 of all of those, the 72 in a week might be the one that 10 raises the least safety concerns because a lot of people do 11 that in their lives, but the not more than 16 in the 24-hour
- 12 period, you know, that's sort of like the medical profession 13 where they do that to themselves, but I'd hate to be treated 14 in the 23rd hour of somebody's shift --
15 (Laughter.] ;
\
16 COMMISSIONER McGAFFIGAN: So of the 45, do you 4
17 know how they broke down between the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit --
18 MR. STANLEY: The majority were in the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I
19 limit. l 20 COMMISSIONER McGAFFIGAN: Okay. !
- 21 CHAIRMAN JACKSON: Does the gentleman from the 1
22 union have any comment to make? !
23 MR. STARR: Madam Chairman, I guess I would have l
24 to concur with what Mr. Stanley said. To my knowledge, my 25 members have direct access to me through e-mail, all the I ANN RILEY & ASSOCIATES, LTD.
Court Reporters 3025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
L !
! 'S- 74 1 normal means. I have not been personally contacted by a j.
I 2 represented member of. Byron to complain directly about 3 overtime. That's not to say that someone has not talked to 4 the management in person.
5 CHAIRMAN JACKSON: Okay.
6 COMMISSIONER McGAFFIGAN: Just again, in '97 do 7 you have the data --
8 CHAIRMAN JACKSON: Thank you.
9 COMMISSIONER McGAFFIGAN: -- as to how many of 10 these exceptions were asked for?
11 MR. STANLEY: No. i 12 COMMISSIONER McGAFFIGAN: You don't know? You 13 will probably end up generating all that.
14 CHAIRMAN JACKSON: Right.
15 MR. STANLEY: We'll continue to investigate.
16 CHAIRMAN JACKSON: Okay.
17 MR. STANLEY: In addressing these low-level issues 18 and the pre-existing situation that allowed them to persist, 19 we are applying the same level of management intrusiveness 20 to Byron as we are at all of our stations.
21 More intrusive management oversight includes -
22 weekly management meetings conducted by myself and the 23 management team at Byron Station. We are holding site 24 personnel to high standards across all levels, t
25 We are holding the individuals accountable for the A
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l H i
I 1
S- 75 ;
1 results, instilling a more intense drive in the work force 2 to meet the expectations. This is how we avoid cyclical 1 3 performance.
4 In summary, Byron Station has performed very well, I
5 even though there is need to emphasize the fundamentals. I 6 Solid performance, when viewed at top level measures, we are !
7 correcting the low level issues. We are continuing to 8 institutionalize the fundamentals. We are striving to move 9 Byron Station to a higher level of performance.
10 Braidwood Station. Next slide, please.
11 Overall good sustained performance, the capacity 12 factor of 89 and 1/2 percent, this is the best ever for the l
! 13 station. I l
l I
14 The INPO performance index has continued to i 1
15 increase to 94.8. It is in the industry's top quartile, and 16 the best ever for the station.
17 Braidwood had one scram in 1998, that was in j 18 January, on unit 2. The forced outage rate is 1.6 percent.
19 The only contributors is the scram I mentioned and a 20 three-day heater drain tank rupture disk repair. This was
. 21 an embarrassing incident for Braidwood Station. We 22 continued to learn from this incident, and we shared with 23 the remaining four stations on the lessons learned.
l 24 Next slide, please.
25 Some key accomplishments and results achieved at 1
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 )
Washington, D.C. 20036 )
(202) 842-0034 l 1
S- 76 1 Braidwood. Material condition has improved. The non-outage 2 corrective backlog was reduced by about 40 percent. A 3 breaker-to-breaker operation of some 467 days for unit 1.
4 Reduction in maintenance for A-1 systems and reduction in 5 operator work-arounds from 42 to 5 during 1998.
6 Braidwood established a world record, 70-day steam 7 generator replacement outage.
8 Engineering improvements include the engineering 9 request backlog has been reduced by about 90 percent. We 10 had an excellent architect-engineer and maintenance rule 11 inspection by your agency.
12 The engineering work management process has been 13 put in place and it's in its initial stages of 14 implementation. However, we are self-critical and, as a 1
15 result, have found that we still need to improve the 16 standards to reach top level performance.
17 For example, we are working to further improve 18 human performance and refine the work management process.
19 We have the tools needed to detect any performance decline, 20 and we will address any deficiencies identified.
21 In summary -- -
22 CHAIRMAN JACKSON: Please go ahead.
23 MR. STANLEY: Continue strong plant performance.
24 Nevertheless, we continue to strive to achieve consistent 25 high level performance across the board and to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
_ _ _ _ _ _. . ~ . . _ _ . _ . _ . _ _ _ . _ . _ . _ _ _ _ . _ . . _ _ . _ _.___
1 S- 77 ,
1 institutionalize the fundamentals. We are applying the same 4 2 level of intrusiveness to Braidwood as we do all of our 3 plants, to ensure all potential issues are identified and 4 corrected.
j 5 I will now turn the presentation back to Oliver.
- 1
- 6 MR. KINGSLEY
- The Chairman has a question.
1 j 7 CHAIRMAN JACKSON: Before you.go, tell me what i
1 8 long term and short term benefits you hope to derive from
!~
l 9 the conversion to the improved standard tech specs for Byrcn l 10 and Braidwood.
I i 11 MR. STANLEY: I think in many situations it I
12 simplifies the tech specs in general. In the long term, it ,
13 prevents you from doing I'll say unneeded or unnecessary 14 surveillances. It's sort of like having a good PM program.
15 It's constantly fed by the system itself and improves as you I
16 go on. And I believe the improved tech specs will help in 17 both areas.
18 CHAIRMAN JACKSON: All right. Because, you know, 19 in some sense you could argue that ycur operational 20 performance is such that -- you know. So I'm just wondering
- 21 from your point of view what you think the benefit is.
22 MR. STANLEY: In this time frame there was a 23 tremendous number of tech spec requirements and i
24 surveillances that was put in place for this time frame 3 25 units.
ANN RILEY & ASSOCIATES, LTD.
. Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
S- 78 1 CHAIRMAN JACKSON: Okay.
- 2. MR. HELWIG: I might add that we.are also very :
3 interested in pursuing some further improvements in the tech 4 spec arena, making them risk-informed, if you;will.
I 5 CHAIRMAN JACKSON: Sure. So am I .
6 [ Laughter.]
~~
7 MR. KINGSLEY: I'll tell you what else we got out 8 of this, too. You asked about Dresden and some of the 9 missed surveillances. We had implemented kind of a 10 quasi-proof tech specs not very well. You go back on Quad 11 Cities, we had done a very poor job -- this was at the nexus 12 also, and we put an absolute process in that we are going to i
13 do this right, and so knock on wood, so far they have done 14 an outstanding job with putting this in, and it took a-lot .
15 more than everyone thought. We, in fact, even had to delay 16 it to make sure we did it right. So we have gotten a lot l 17 out of this. Plus the LCO extensions that we did. l 18 MR. HELWIG: It's been tremendous.
i l 19 CHAIRMAN JACKSON: Okay.
l i I
20 MR. KINGSLEY: Thank you, Gene.
i 21 I'd like to have the last slide here and wrap up. -
i 22 I am confident that the results we are achieving l 23 today clearly validate our improvement plan. We have not 24 achieved the high performance we are targeting. We have set 25 expectations for ourselves that far exceed regulatory ,
ANN RILEY & ASSOCIATES, LTD.
! Court Reporters -
(- 1025 Connecticut Avenue, NW, Suite 1014 l Washington, D.C. 20036 l (202) 842-0034 l
___1
i l
S- 79 l l
1 standards. Clearly our performance slope is moving in the I I
2 right direction. However, we are not there. I 3 We are systematically going about this I 4 improvement, and I hope we.have answered your question, 5 Commissioner Merrifield. -
6 The strategic reform initiatives have defined our
~
7 expectations and fundamental programs. We still have work 8 to do to make sure they are in the fabric 9 We do have in place metrics and systems to track 10 performance at all levels, and we are using them. We are 11 bu.Llding a much stronger management team that's active, 12 involved, supports the plants, both from a corporate 13 standpoint and at the sites. You have to have that 14 leadership support and oversight in order to be successful.
15 We are going to continue to be self-critical, 16 aggressively addressing any performance shortfall or slip 17 that we might have on the way, and we have talked to you 18 about some of those today.
19 We are going to continue to follow through on 20 every issue, both at that site and across the board, and
, 21 I'll give you my word on that. These problems we have seen 22 as on Quad Cities, where we had taken previous action, we 23 are going to take more previous -- I mean more additional 24 action to correct these problems and make sure people 25 clearly understand how you handle critical sensitive ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 80 1 evolutions, how you monitor work control ~, et cetera.
2 We are going to work on'. involving the work force, 3 making sure that they understand and buy into these 4 standards, and explain the reason that we are doing this, 5 and we are going to have to some more teaching, because 6 these basics just weren't in place at Commonwealth Edison.
7 This management method is not just for 8 turn-around, but it is a good prescription for curing cyclic 9 performance and ensuring long term success.
10 We told you what we did in '98. We did make 11 tangible progress. It is taking hold, but it's not-there.
12 In 1999 and 2000 are the years we are going to work on 13 continuing to institutionalize these fundamentals. We have 14 got work to do.
15 We are going to work on sustaining this positive 16 ramp and take each site up to the next level. We have not 17 reached the high level, but we did outline very specifically 18 the performance gaps or performance plans, and we do have 19 them in place and they are a rigor, and we do follow up on 20 that, from the reporting of monthly management meetings that-21 we have, both at the sites and in corporate and the r 22 quarterly business plan reviews, where people are actually 23 put on the spot and have to stand before us and explain what 24 their performance shortfalls are and what they are actually 25 doing about them, and where we can assist them from our ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
1
. S- 81 1 corporate office in Downers Grove.
2 Our plan for 2001 is very simple. It's to the j 3 best. Are we there? No, we are not. Are we moving in the l 4 right direction? Absolutely. Will there be bumps along the 5 way? Certainly. We are going to be very candid with you, 6 very open, call a spade a spade, and tell you where we need 7 to improve. You won't have to call us to find out.
8 I think we have got the infrastructure in place to 9 withstand these bumps and make these improvements. We are 10 very proud of what we have done, but we are not satisfied.
11 We are going to stay the course, we are making these 12 improvements, we have had a good start, but we have got a 13 lot of work to do.
14 This now concludes our presentation and we would 15 be happy to answer any questions.
16 CHAIRMAN JACKSON: Thank you. Before we call the 17 staff, I will just go down the line. Do you have any 18 questions?
19 COMMISSIONER DICUS: Yes, I have a question, or 20 maybe a comment. Illinois is clearly moving along with
. 21 deregulation and you have long-range plans as well. Do 22 Illinois' plans and your plans track pretty well, or do you 23 see some problems that could impact where you want to go 24 with the plants?
25 MR. KINGSLEY: Let me say just something before ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
, S- 82 1 the Chairman talks about the restructuring. I don't see any 2 detrimental effect from the restructuring on how we operate 3 these plants, We are going to set the standards.- We have I
4 got sufficient money to operate the plants.
5 I do have a job to not let our people get 6 mesmerized by what might happen out there, and that's why it 7 is iraportant to focus on dollars per megawatt ' hour, but it 8 is more important to focus on' material condition, having the 9 right engineering programs in place, operating correctly, 10 these operating practices, So I don't see any. Now, I 11 would like to have John talk about the overall restructuring 12 and how that is effecting the company, because there are- -
13 some effects.
14 MR. ROWE: I think there are two questions in your 15 point, Commissioner Dicus. The first is, you know, how do 16 restructuring and competition generally effect the nuclear 17 plant operation? In the long run, there is no doubt that in 18 Illinois or any state where there is competition, it brings 19 the requirement that the incremental or going forward costs l 20 of nuclear plants be below the market value of the power, or 1
i 21 else the plants will be shut down. And what we have tried
- i l 22 to do with that reality is simply to state it and restate
! 23 it, and restate it again, because the employees need to know 24 that the plants must be economical, again, on an incremental
, 25 basis, or they cannot continue to be run.
l l
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters
'i. .1025 Connecticut Avenue, NW, Suite 1014 i Washington, D.C 20036 (202) 842-0034
i i S- 83 1 But at the same time we have said, again and t
2 again, that they won't be economical, and they won't run 3 unless they are run to higher standards of operating i
- 4 efficiency and NRC standards than they have been in the i
j 5 past. We have made that message equally unequivocal.
t 6 In the short run, there is a counter-intuitive-7 benefit. What is going on is that restructuring imposes 8 upon Comed all of the costs of improving its nuclear fleet 9 because there is no fuel clause and the like anymore, but at 10 the same time it gives Comed all of the economic benefit of 11 improving its nuclear fleet. This is a change from a 12 classical regulatory structure. And since the benefits of 13 increased productivity are five or six times as large as the 14 benefits of cost saving, the message is very clear, do what 15 is necessary to run these things well. And, indeed, the 16 short run, that is much the largest financial upside 17 available to the company.
18 So, I think we have that square. The somewhat 19 more amorphous aspect of your question is, how do the 20 state's plans match or mingle with Comed's plans? Well,
. 21 that is very difficult because both the state's plans and 22 our own are somewhat inchoate, but the essence of it is that 23 Illinois' Restructuring Act is less ideologically concrete 24 than are those in California or New England, i
25 There is a general sense in the legislature and in ANN RILEY & ASSOCIATES, LTD. l Court Reporters i 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
I
S- 84 1 the Commission in Illinois that competition is a good thing 2 and that rate reductions are a good thing, and the statute 3 was designed to bring about those objectives with a minimum 4 amount of specificity as to what the structures of the 5 future would look like. This leaves Comed, in some ways, 6 more opportunities, but clearly more risk than might be the 7 case in a state where the restructuring legislation was 8 ideologically more rigid.
9 It also leaves us with the continuing task of 10 working out where we go with the Illinois Commerce 11 Commission. I think as time goes along, you will see 12 Illinois restructuring look a little more like the Northeast 13 or California than the Act may have looked at the outset.
14 But what it has done for Comed's plans, it has 15 caused us to look at our system as five business units, 16 fossil generation, nuclear generation, transmission, 17 distribution, ind competitive or unregulated enterprises.
18 We have decided to sell the fossil generation and have that 19 underway. We have renewed our commitment to the nuclear 20 fleet. We hope to run the four remaining business units 21 successfully as a collective organization. But we have the -
22 obligation to succeed at all of them or, else, find a better 23 structure. So we know where we want to go, but we will be 24 learning like other folks where we can go as time goes on.
25 Again, though, I would come back to your first, I
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 85 1 and the. narrower part of your question, except that this 2 imposes a clear overall economic obligation on the fleet, I 3 think it increases our focus and commitment, rather than 4 decreases it.
5 CRAIRMAN JACKSON: Commissioner Diaz.
6 COMMISSIONER DIAZ: No questions.
7 CHAIRMAN JACKSON: Commissioner McGaffigan.
8 COMMISSIONER McGAFFIGAN: Just a question cn the 9 one plant that didn't come up today, Zion. Where are you in 10 the decommissioning process? Have you decided on SAFSTOR 11 versus decon, or is there a process for making that 12 decision, if you haven't already made it?
13 MR. STANLEY: les, the decision has been made that 14 we will go into a safe nuclear island, SAFSTOR nuclear 15 island concept. That construction has actually started. It 16 will be completed by the end of this year, and it will meet 17 our dates, our original dates of the middle of 2000 that we 18 committed.
1 19 COMMISSIONER McGAFFIGAN: And the exemption 20 processes for insurance, security, emergency planning, et
. 21 cetera, those are underway or finished, or where are you?
22 MR. STANLEY: They are underway and they will be
~
23 submitted by the end of the year as on schedule.
24 COMMISSIONER McGAFFIGAN: Okay.
25 CHAIRMAN JACKSON: Commissioner Merrifield.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters l 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 86 1 COMMISSIONER MERRIFIELD: I have a little 2 different question. I am wondering whether, in retrospect, 3 our oversight, performance oversight panel process has 4 enhanced or detracted from the communication consistency and 1
5 predictability in our regulatory process. I am asking l
6 somewhat of a criticism or justification, what we are doing.
7 MR. KINGSLEY: Let me answer that. It has helped.
8 One, it has provided focus. It has provided op,portunity for 9 dialogue. It has provided a clear understanding of what the 10 issues are. When I came there, we were absent basic 11 process. We had some metrics, they were the wrong ones. In 12 a lot of cases, we did put together the strategic reform 13 initiatives. We did not have a business plan. We put that 14 in place. So I think it has provided a great opportunity to 15 have some face to face dialogue and let us go report 16 performance and actual results to the NRC.
17 Now, long-term, I am not in favor of this, but it 18 has provided significant help.
19 COMMISSIONER MERRIFIELD: Thank you.
20 CHAIRMAN JACKSON: Thank you very much. I 21 appreciate it. .
, 22 Let me hear from the NRC staff.
23 MR. TRAVERS: Good morning. As you know, 24 Chairman, the NRC staff has been continuing its oversight of 25 comments, safety performance and its initiatives to improve ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 87 1 its performance. Specifically, we have been continuing the i 1
2 Commonwealth Performance Oversight Panel that Commissioner !
3 Merrifield mentioned. That panel was established to provide 4 an integrated NRC assessment of Comed's nuclear safety l 5 performance, and to specifically identify any discrepancies 6 between Comed's assessment of its performance and our own.
7 In order to help me with the presentation today, I 8 brought two good men from Chicago, --
9 CHAIRMAN JACKSON: Well, Jeff has been there, so, 10 you know, we know he's insane. He's been in Chicago for a 11 while.
12 [ Laughter.)
13 MR. TRAVERS: Well, I thought I would give him a 14 plug.
15 And one good man from Montgomery County, Maryland.
16 Jim Dyer, as you pointed out is the Region 3 regional 17 administrator, and Jeff Grant is the director of the 18 Division of Reactor Projects, and of course, Roy Zimmerman 19 is the deputy director of the Office of --
20 CHAIRMAN JACKSON: Oh, that's the Rockville --
6 21 MR. TRAVERS: That's right.
22 CHAIRMAN JACKSON: Okay. Not yourself.
~
23 MR. TRAVERS: No, I just -- I wouldn't give myself 24 a plug.
25 CHAIRMAN JACKSON: All right.
AWN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 88 1 MR. TRAVERS: But in any case, we would like to 2 begin the briefing, and Jim is going to start us off.
3 CHAIRMAN JACKSON: Thank you.
4 MR. DYER: Good morning, Chairman, Commissioners.
5 Today, we're here to brief you on the -- for the fourth 6 time. This is my first. That's why I brought Jeff, so that .,
7 there's a little historical context for the Commonwealth 8 Edison Performance Oversight Panel reviews.
9 We plan to focus our review on the last six 10 months' performance since you were last briefed on June 11 30th, 1988.
12 Next slide, please.
13 As you heard from Commonwealth Edi 'on, there's 14 been a number of significant activities in our resultant 15 inspections as have occurred at the Comed site since this 16 last meeting in June. Essentially, Dresden has operated 17 well since removed from a watch list. Braidwood, Quad 18 Cities and Dresden successfully conducted refueling outages 19 with major work activities.
20 LaSalle Unit 1 successfully restarted and has 21 operated well after their extended outage and completed a i 22 short maintenance outage. LaSalle Unit 2 appears to be
~
23 ready to -- on schedule for their startup in May.
24 The NRC staff completed a review of the Comed 25 strategic reform initiatives and determined that the SRIs ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
_ _ _ _ ._ _ _ _ _ _ . _ _ . . _ _ . _ , _ . . _ . _ . _ . _ . _ . _ . . _ _ _ _ _ . . . . ~ . . _ _ - . . . _ . . _
S- 89 1 were responsive to the original 10 CFR 54F request for
[ 2 information. And we conducted-three CPOP public-meetings i 3 and three corresponding internal NRC meetings attended only i
- 4 by the NRC staff.
i i 5 Next slide, please.
i a
j 6 CHAIRMAN JACKSON: Let me ask you a question. One l(
7 of the duties of the Comed Oversight Panel was to assess
- 8 allegations in the aggregate to determine if there were any l 9 broad-based concerns or issues.
10 Are there any conclusions? I mean, have you done I
- 11 that kind of aggregated look and is there any particular
! 12 insight that you gleaned from that?
1 I 13 MR. DYER: Yes. I think, as part of the CPOP l
] 14 process, and again, Jeff can add more, but'I participated in i
l 15 one meeting so far, is we review the allegations in i
l 16 aggregate, we get a briefing from our allegation coordinator i
j 17 on the nature and extent of the various allegations, both i
l 18 across Comed sites as well as focused at the individual i.
19 sites, and then we merry that up with other information from j 20 the inspection reports, from the Comed performance
]- 21 indicators and any other information we may have on the
[ 22 performance in Comed, and tie that to the feedback from our i.
23 SRI inspections and then try to get it integrated together.
j j 24 I think from the Agency allegation report, you 25 know, Byron is identified as an outlier within Comed in
{
I 4
ANN RILEY & ASSOCIATES, LTD.
Court Reporters
! 1025 Connecticut Avenue, NW, Suite 1014 :
Washington, D.C. 20036 l (202) 842-0034 ,
S- 90 1 that, and we have taken some actions in that arena and we're 2 still looking at it.
3 CHAIRMAN JACKSON: Okay.
4 MR. DYER: Let's see. Slide 3.
5 The regional NRR attention at the individual Comed 6 sites and the corporate offices have continued at elevated 7 levels. The CPOP developed a strategy for the review and 8 inspection of the SRI implementation, and region 3 has 9 completed the inspections that were identified at all sites 10 as well as two inspections at the corporate offices.
11 The feedback to Comed -- feedback was provided to 12 Comed during the inspection activities as well as during the 13 public CPOP meetings, and we had an exchange of where they 14 were on the implementation.
15 Additionally, as directed by the PPR in the senior 16 management meetings, we conducted enhanced inspections at 17 all the sites significantly above the core program at the 18 BWR sites and the Braidwood -- with and Braidwood steam 19 generator replacement inspection.
l 20 We also continued our public oversight meetings at 21 the three BWR facilities where we focused specifically on
- 22 the BWR performance improvements at those sites, and as part 23 of our normal PPR process, we had -- at the end of our -
24 individual site reviews, we conducted an integrated review 25 of the Comed sites, again looking for common issues or l
ANN RILEY & ASSOCIATES, LTD.
f Court Reporters l 1025 Connecticut Avenue, NW, Suite 1014 l Washington, D.C. 20036
, (202) 842-0034 l
l l
} S- 91-4 j 1 outliers from the normal Comed performance'in that they.
2 . would provide us an input.to our CPOP process.
I 3 Next slide. i
< t
- i 1 4 Yes. ;
i l 5 CHAIRMAN JACKSON: You know, following the LaSalle !
3 j 6 Unit i restart, emergent -- or equipment problems led to two j -
7 shutdowns and one reduction in power. Can you say what.
i 8 current indicators suggest about equipment problens today, !
1- !
i 9 you know, or over.the -- 3 l
l 10 MR. DYER: The equipment problems, I don't ;
! 11 remember the details that caused the actual LaSalle
- 12 shutdown. But during the extended outage, LaSalle I think j J !
13 conducted over 200 modifications. It was, you know -- )
l i o
.but these were post j
! 14 CHAIRMAN JACKSON: Right, 15 shutdown equipment problems.
)
J 16 MR. DYER: And coming out of an outage, we would l
17 expect to have some -- we wouldn't be surprised if there was 18 some sort of material problem. I think Jeff --
19 MR. GRANT: I think given the fact that I think 20 there's actually close to 300 modifications and. thousands of l
- 21 work activities that were done during the two years that 22 Unit I was shut down, there were a couple of hiccups, I 23 guess, during the startup. One was a failed card in a 24 feedwater control system that had been tested previously, 25 and I forget exactly what component failed in the circuit l ANN RILEY & ASSOCIATES, LTD.
Court Reporters ;
1025 Connecticut Avenue, NW, Suite-1014 i Washington, D.C. 20036 '
(202) 842-0034 1
S- 92 i 1 card, but that caused a feedwater. transient that resulted in
! 2 a manual scram being put in.
! 3 But looking at that and there were some problems with the RCSI system also, of' course, both LaSalle and we-4 5 would have'liked to have seen a completely flawless startup 6 and run, but given the amount of activities that had taken 7 place for that two years, it looked very reasonable.
8 CHAIRMAN JACKSON: So nothing that was unusual, 9 nothing that they should have not missed and nothing that 10 was risk significant?
11 MR. GRANT: No.
12 CHAIRMAN JACKSON: Okay.
13 MR. DYER: Next slide, please.
14 The results of our CPOP efforts and based on our 15 review of the activities now, we've concluded that Comed has 16 implemented their strategic reform initiative work plans as 17 they committed to us in their February and January letters, 18 and that the performance of the BWR facilities has continued 19 to improve without the detriment to Braidwood and Byron 20 stations.
21 Our assessment also is that these improvements to
- 22 date have been driven by the Comed management team, and with 23 extremely large involvement by the corporate office and site 24 executives.
25 The changes that occur -- have occurred so far ANN RILEY & ASSOCIATES, LTD.
Court Reporters
'1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
- - + - _ - - - - - - , - _ - - - - - - _ - - - - - _ . . - - _ - - - - - - - - _ - - - - - -
S- 93 1 appear to be effective but-are not institutionalized or,'as 2 Mr. Kingsley said, in the fabric of the organization to the. j 3 extent that the senior management -- enhanced senior 4 management oversight could be stopped.
5 There are also no --
6 CHAIRMAN JACKSON: So you're saying that your ,
7 judgment is that you mean -- when you say senior management, 8 you mean their senior management?
9 MR. DYER: Yes, ma'am. Yes. Their senior 10 managers are intimately involved with a high level of detail 11 going on at all the sites --
12 CHAIRMAN JACKSON: I see.
13 MR. DYER: -- and all the activities.
14 There also has been what I would call a 15 significant turnover in the number of managers at the sites.
16 Again, the CPOP -- as part of our CPOP charter, we are
- 17 focused on management turnover at the department bead level r l
18 and greater at the sites or within the corporate office, and
! 19 there has been a lot of movement among the various managers l 20 in that. And while this wouldn't be unexpected given Ja 21 Comed's rapid pace of change as well as the rapid pace of
! 22 change in the industry and other opportunities-for some of ,
i
[
23 the managers, we don't think it's conductive to preventing a 24 cyclic performance. There's this high reliance on the ,
- 25 individual senior managers still, and these managers are i
ANN RILEY'& ASSOCIATES, LTD.
Court Reporters
- 1025 Connecticut Avenue, NW, Suite 1014
! Washington, D.C. 20036 L (202) 842-0034
. . - . . .-. . . . . . . . - . . .- . . . . = . _ - .-.._ - .- - - . . . .
i
[ S- 94
- 1 changing, and so collectively, that'does not lead us -- we i
j 2 have some concerns still about the cyclic performance until
, 3 it does get into the fabric, if you would, as Mr. Kingsley I
l 4 said.
1 5 CHAIRMAN JACKSON: How will you know that, that i j 6 it's in the fabric?
7 MR. DYER: Well, I think one of the things, as we i
! 8 go through it in our CPOP meetings and our overview 9 meetings, is the amount of management involvement at the 10 senior level for routine activities. You know, in the one 11- at the Dresden, I was surprised at the Dresden oversight 12 meeting that we had where they were talking about they were 13 -- you know, operations were going on and online maintenance 14 activities, and they were going well, but the operations 15 manager was calling in from home to participate in pre-shift 16 briefs.
17 That's the kind of ongoing activities that, you l
18 know, they decided they needed to have that level of lo oversight to ensure that they were done correctly. Ongoing, 20 that just puts an awful strain on the managers within the 21 organization. '
22 MR. GRANT: I would just add one thing on that, 23 that we recently had a LaSalle oversight meeting, and one of !
24 the issues there that I was pleased to see that they brought 25 up was ensuring that the first-line supervisors, who I think ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW,. Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 95 1 they've looked at and seen that the message, as Mr. Kingsley 2 said, hasn't been inculcated yet, they understand the 3 expectations, but it's not part of the fabric yet, it's not 4 instinctive, and I believe that they understand that and the 5 meetings that we have with Comed and the individual sites, 6 they bring these issues up. So it's clearly on their radar 7 screen. I don't think there's a performance indicator, 8 though, that will tell us, you know, when that transition 9 has been made.
10 CHAIRMAN JACKSON: Okay.
11 MR. DYER: Okay. Lastly, we've also seen value 12 added by the Comed -- to Comed safety performance by the 13 corporate assessments in the oversight group, particularly 14 in the diagnostic capability when responding to a 15 performance indicator or after an event or an inspection 16 finding, getting to the root cause and implementing the 1
17 corrective actions has been a strength. I l
18 Now, this value added hasn't always been 19 consistent at all the sites; it appears to be -- in our 20 assessment, it's always thorough; it's a question of
. 21 timeliness in that.
22 In some of the issues, the NRC is -- when we raise 23 an issue, we find that the comment has been there before us, I
24 but it hasn't percolated up through the system for 25 corrective actions in that. So I think it's more of a i i
ANN RILEY & ASSOCIATES, LTD. '
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 96 1 timing issue than as'far as thoroughness goes.
2 CHAIRMAN JACKSON: You indicated that you 3 inspected selected Strategic Reform Initiatives. What are 4 some of those?
5 MR. DYER: Well, what we did is the CPOP went '
6 through and did a review of the work plans for the 13 SRIs
~
7 and we really targeted for efficiency. Part of the, I guess 8 -- this actually happened before my time, but a lessons 9 learned we have learned from the past is we have gotten 10 wrapped up too close to the licensee's process, as opposed i 11 to reviewing the effectiveness of'their process.
12 We chose just to observe the implementation, to 13 target things that our normal inspection program could do in 14 the conduct of business. So, for the most part, if it was a 15 work control process being improved, we would review what 16 the SRI -- have the inspector brief, you know, review what 17 the SRI was and then go look at how it was being implemented
- 18 in the field.
19 CHAIRMAN JACKSON: So when you have gotten too 20 wrapped up in the licensee's processes in the past, as 21 opposed to looking at what they accomplished, what do you -
22 mean by that?
4 23 MR. DYER: Well, in my previous jobs back in 1992, f
24 I was part of the design and review team and the Dresden 25 oversight team when I worked for NRR, and we were almost 4
- ANN RILEY & ASSOCIATES, LTD.
- Court Reporters 1025-Connecticut Avenue, NW, Suite 1014
-Washington, D.C. 20036 (202) 842-0034 3 -s-- n , .
S- 97 1 totally process oriented.
2 CHAIRMAN JACKSON: As opposed to results.
3 MR. DYER: And we didn't focus on the results.
4 CHAIRMAN JACKSON: I see. I understand. Okay.
5 MR. DYER: And our strategy, the CPOP strategy for 6 implementation of the SRIs is, again, to do -- where we can, 7 do the checks on implementation, but then, also, tLe second 8 part is to review the effectiveness, and that is the part on 9 our oversight program where we have the branch chiefs review 10 us on inspection results that are ongoing and, say, you 11 know, tie that performance, improved performance tr -- are 12 they meeting their SRI objectives? We do that through the 13 CPOP process.
14 Additionally, the licensee was built into their 15 SRI closure process an effectiveness review. And under 16 CPOP, we hope to review with the licensee their 17 effectiveness reviews for improvements.
18 Next slide, please.
19 Our future activities will largely be dictated by 20 the senior management meeting process and that, which is a 21 where a lot of the oversight program originated. But for 22 the near term, we expect to continue with our periodic
~
23 meetings, again, focusing on SRI effectiveness as our 24 implementation inspections are complete. And we were going i 25 to perform augmented coverage of the LaSalle Unit 2 startup :
1 i
l l
AJUI RILEY & ASSOCIATES, LTD. I Court Reporters I 1025 Connecticut Avenue, NW, Suite 1014 i Washington, D.C. 20036 )
(202) 842-0034 l
I S- 98 l
1 that is scheduled next -- or in a couple of months, and 2 continue our plant inspections and periodic management 3 meetings with the BWR facilities. That concludes my 4 presentation.
5 CHAIRMAN JACKSON: Thank you. Geoff, do you have a
6 any additional comments you want to make?
7 MR. GRANT. No, ma'am.
8 CHAIRMAN JACKSON: Okay. Thank you.
9 Commissioner.
10 COMMISSIONER DICUS: Do you have any criteria that 11 you will use to make a decision on the recommendation when 12 the CPOP can end?
13 MR. DYER: As part of the last CPOP meeting, the 14 group came in and had worked out, I think, seven or eight 15 criteria for doing it, and as the brand new Regional 3 16 Administrator, they decided that my first decision wasn't 17 going to be to try to end the program, I am trying to find s
18 out exactly what it is. But there have been -- we are 19 developing criteria. It involves eight criteria, of which I 20 think two have been completed so far.
21 CHAIRMAN JACKSON Commissioner Diaz. -
22 COMMISSIONER DIAZ: I am going to follow up on
~
23 that part, but let me start on the last slide, continuing 24 house inspections and periodic management. I understand 25 that we have putting 13 to 14 FTEs every year additional to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 99 1 what we normally would put, you know, for inspection and 2 assessment. What is the level now?
3 MR. DYER: Can I have the -- 1 have a slide on ,
4 that. Can I see backup slide 1, please? I hope they have 5 it.
.i 6 CHAIRMAN JACKSON: Do you have backup slide 1, 7 please? There it is.
8 MR. DYER: This is -- I asked to get the run off 9 of the inspection results that we have had for the last six, 10 seven months, I believe. And as opposed -- Carl Paperiello 11 did it last time, had an average inspection -- our 12 inspection at the Comed sites has significantly decreased.
13 The numbers I think that Carl was showing last year was 7500 14 hours per year. The numbers, the amount that we are looking l 15 at now is 5500 -- 5,000, and it is continually coming down.
16 And so it is -- the specific inspections, we have had a lot 17 of work at Quad Cities with the engineering and tech support 1 i
18 inspection follow-up to the AE inspection and that.
19 But I don't have the -- Geoff, I don't know if you 20 have the numbers. We just went through the PPR process and 1
. 21 looking .*orward, but we considerably back from where we !
i 22 were.
~
23 COMMISSIONER DIAZ: Okay. Let me tie that to 24 Commissioner Dicus' question. You knew, you said, looking 25 at the CPOP, and you are looking at some criteria, I hope l l
4 1
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters ,
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 !
(202) 842-0034 i
.- . - . . . . . ... .. -. .- .. - . . . . - . . . - . . ~ - . . . . - . .
4 2
. S- 100 l 1 that the-criteria will focus on the added health and safety :
2 benefits from the panel, I mean because that is really what -
3 the bottom line is. And so when you develop those criteria,. !
i 4 the Commission will be knowing how -- what is the added !
! 5 value, from this point on. I think we need to look forward. ;
i j 6 I think we realize the value of the panels in the past. But ,
^
j 7 from this point forward, what is the added and health.and l 8 safety value of it?
i 9 MR. DYER: Okay.
10 CHAIRMAN JACKSON: I think you should probably tie !
i i
- 11' that into what you were working off of relative to the i
j 12 5054(f) letter, since that is really what triggered this in >
13 the first place. j 14 MR. DYER: Yes.
1 I
15 CHAIRMAN CACKSON: Commissioner McGaffigan. !
i ?
16 COMMISSIOrlER McGAFFIGAN: A general question about
! 17 overtime. We have the letter in, you are going to answer i
18 But do our inspectors look at these exceptions to the '
- it.
i j 19 Generic Letter 8202 tech spec limits as a routine thing when ;
1 20 they are -- is it part of the resident core inspection j 21 program to just monitor how many deviations the licensee has '
) 22 approved? Do we regard as a useful indicator?
i . -
j 23 MR. DYER: I will defer to Geoff.
24 MR. GRANT: No, I don't believe it is part of tne '
4 i
25 core. I mean you could envelope it under the core if you
- ANN RILEY & ASSOCIATES, LTD. 4 Court Reporters :
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 ,
(202) 842-0034
S- 101 1 thought that there was an issue there, but it is not 2 routinely looked at. However, they will look at it if it 3 looks likes, to the inspector, that there is an issue 4 brewing there.
5 COMMISSIONER McGAFFIGAN: But it strikes me there 6 is an indicator, I mean Mr. Stanley talked about it earlier, 7 you know, he knows there are 45, he knows they are mostly on 8 the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, et cetera, and it wouldn't -- I assume that 9 date is available to us, so we would -- the way the 10 inspector could find out whether there is an issue brewing 11 is to know whether 45 is a big number or a small number 12 compared to industry practice more broadly, and then, 13 presumably, if it is a big nunber, they would pay to some 14 attention to it. If it is a small number, they wouldn't. I 15 am just trying to find out, is this a valuable indicator or 16 not.
l 17 MR. TRAVERS: It has not been an issue, a !
18 significant issue in the past.
19 COMMISSIONER McGAFFIGAN: Okay.
l 20 MR. TRAVERS: And, frankly, we are certainly 21 looking at it as part of the allegation process. And we 22 certainly won't comment on the details of any specific
~
23 allegation here, but even -- the tech spec I think even 24 allows for an administrative pre-approval in somt .nstances 25 for overtime. But we have not faced this issue in any l
l l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 -
Washington, D.C. 20036 l (202) 842-0034
S- 102 1 significant measure before.
2 COMMISSIONER McGAFFIGAN: Congress Dingell --
0 3 MR. TRAVERS'. So it is not part of the routine 4 inspection program.
5 CHAIRMAN JACKSON: It hasn't been enough of an 6 issue that you thought that it needed to be routine 7 examined.
8 MR. TRAVERS: But we are always at the ready to 9 further evaluate issues.
10 COMMISSIONER McGAFFIGAN: But the data that they 11 are requesting that this letter, you know, how many 12 exceptions there were, for what purpose, et cetera, for 13 across the fleet, is that readily available? No?
14 MR. ZIMMERMAN: I think licensees keep records 15 like that. I don't recall this area being in the core 16 inspection, but I know that from my time in the field at the 17 sites, you gravitate toward the areas during the outages, 18 when are talking to staff that are doing work, and you get a 19 pretty good feel for whether they have a sense that there 20 may be a problem with regard to the hours that they are 21 working, and then go pull the records. We can look at those -
22 records at any time. But I think the residents do have a 23 good feel.
24 MR. DYER: But we wouldn't generally have that 25 data.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
S- 103 1 COMMISSIONER McGAFFIGAN: Okay.
2 CHAIRMAN JACKSON: Commissioner Merrifield.
3 COMMISSIONER MERRIFIELD: No further questions.
4 CHAIRMAN JACKSON: Well, I would like to thank 5 both Commonwealth Edison and the NRC staff for a very 6 informative meeting on the safety performance of the Comed 7 nuclear facilities, and the progress made to date in 8 addressing and resolving cyclic performance issues.
9 The Strategic Reform Initiatives of Comed appear 10 to have contributed, and you say so, to the improved 11 performance of the Comed nuclear facilities, but through the 12 heavy involvement of the Comed management team.
13 Now, in the past Commission meetings with Comed, 14 we have called for results and sustained results, and it 15 would appear that at least we are beginning to see them.
16 And, as you have heard, there have been, and you have told 17 us, challenges and events, and an integrated assessment of 18 the Comed facilities, -- such as that envisioned in the new i 4
19 NRC reactor, proposed reactor oversight process, and of 20 which I would note that Quad Cities has been selected as a ,
l 21 pilot plant, -- which could provide real world insight into i 22 their performance and foster more informed decision making l l
23 in, first, the allocation of inspection resources on 24 activities where the potential risks are greater. Secondly, !
25 applying greater regulatory attention to the facilities with 1
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters I 1025 Connecticut Avenue, NW, Suite 1014 i Washington, D.C. 20036 '
(202) 842-0034 i
j
S- 104 1 performance problems. Third, using objective measurements 2 of performance. And, fourth, providing the nuclear industry 3 and the public with timely and understandable assessments of 4 plant performance.
5 But, for the time being, the NRC continues to rely 6 upon existing mechanisms, including the plant performance 7 review, and the senior management meeting processes, to 8 evaluate the nuclear safety performance of the Comed 9 facilities and the under things under that umbrella, and 10 determine when sufficient information exists to determine if 11 that cyclic performance has been arrested in a sustained 12 way.
13 And I would just encourage Comed to continue to 14 strive for continuing and sustained improvement at all of 15 your installations, and to continue the healthy interactions 16 and information sharing that you have been providing, and 17 that you have had with the NRC staff.
18 So, unless there are any further questions or 19 remarks, we are adjourned. We will have an affirmation 20 session, however. Thanks.
l 21 [Whereupon, at 12:02 p.m., the meeting adjourned.] -
p 22 23 24 25 l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
CERTIFICATE
.i This is to certify that the attached description of-a meeting of the U.S'. Nuclear Regulatory' Commission entitled:
TITLE OF MEETING: MEETING WITH COMMONWEALTH EDISON PUBLIC MEETING PLACE OF MEETING: Rockville, Maryland DATE OF MEETING: Tuesday, March 2, 1999 was held as herein appears, is a true and accurate record of-the meeting, and that this is.the original transcript thereof taken stenographically by me, thereafter reduced to i
i typewriting by me or under the direction of the court ']
reporting company.
i 4 Transcriber: Martha Brazil I
]
4 Mark Mahonev Reporter:
i a
I
l comed A Urdcom Company '
I i
l l.
l l
NUCLEAR GENERATION GROUP (NGG)
PERFORMANCE STATUS MEETING MARCH 2,1999 .
i r
i t
I
comed A Unicem Company OPENING REMARKS i
s John W. Rowe Chief Executive Officer i
i 2
i A Unicom Company AGENDA ,
i e Opening Remarks J.W.Rowe
- i e Nuclear Generation Group O. D. Kingsley, Jr.
Overview
- Strategic Reform Initiatives D. R. Helwig
- BWR Performance C. M. Crane ;
1 e PWR Performance H. G. Stanley
- Closing Remarks O. D. Kingsley, Jr.
I
_ _ _ _ _ _ _ _ _ - - - - - _ - - - _ - - _ _ - - - - - - - _ _ - - - - _ _ _ - - - - - - J
NUCLEAR GENERATION GROUP OVERVIEW Oliver D. Kingsley, Jr.
Chief Nuclear Officer and President, NGG
- 4 l
I l . . .
comed A Unicom Company i
NGG PERFORMANCE SIGNIFICANTLY IMPROVED l ,
l e Higher Performance Standards Established l
- Results Being Achieved i
e Additional Work Remains 1 i i
f 5
. .. . ... . . _ _ _ _ . . - - _ . . -__ . _ _ _ ~ . . . . - . _ . - . . . _ . . . . - . - - . __-_______ - _ -_ _ __._ _ _
l
. l c-483 f 48d M 6 uer M, uer
, o g
f t
C oso !"* 2*O hc f @ AON O i AON I t U C h o 13 0 13 0
< M des @ M. des j r 9 t - Sny $:3 IM,6ny N
- mIm e - E 1 1 inr O 'm n .inc . ,
O n'n=um"m"' unc 3U "'N. une E i r , 1 j
! .T. Z < - 4n 3
- ^ =n g ~
8 - ady MM. ady
- m - ... e . E== , , ,
- W g -
f k -
EMM""' qed EMEM5555, qe3 j
! e o M uer M M, uer l 46-06 16T6 [.
l i
M g a : e : : : : : - - - ~ -
)
aled 01-lusoJed l
! O a oi god cit 48d j O l
uer h l-i
-E 000 e i uer A - Ao E E
- ISO
~~
des . , ,
Sny
- g 5 :s
'O - inc E * " **o ti unc .
~
O
,i gen 4 "
0 0 E G >u Jdy g .i Sny Z Z
- 4en R EIREMEEIEEEEEEE 483 C" 3"I z _
i u.,
1661
- .c 4
- - - - - - - - - 8 3 : : : : : : : =-
enea 01 lueoJed sweJos }o JaqwnN 0
COmEclA Urdeom Cantpeny 1998 -- DEFINED FEN'DA ME:NTALS AND IMPROVED PROCESSES t
- More Effective Leadership
= Focus On Problem Resolution
- Strategic Reform Initiatives (SRIs)
- A Completing Initial Implementation AContinue As Governing Principles e Process and Program Improvements e Effectively Address Cyclic Performance y
i COrnEcl A Unicom Company NGG ACTIONS CONTINUING AND GOING FORWA'RD e NGG Continues to Focus on:
AMagnitude and Rate ofImprovement AComparison to Industry Best e Instill Performance Standards Into Organization AManagement Oversight AAccountability AEmployee Communication and Engagement AIdentify and Correct Problems e Take Each Site to Next Level of Performance 8
e . ,
l ANALYSIS OF PERFORMANCE GAPS l
I NGG INPO Perf armmce index Gcp Andysis Quod Cities Radiation Exposure Gap Analysis 4
0.5 0.5 94 Reduced $
OElve ha. g late M Dur l 90 5 Ihatnd RddHz) $$R IS AR, M hon -~
i Petarrrrce Expostre Ownstry Improvements Recirc E w
uo eo99 es 'E 350 ja source pump o OI G"2*v U 34 '*""
- t 80 C e urd e--- rosa j sg Reduction Mods O on= < '"^ a-e E uT $ 73 24 uontn I g 70 j250- y, To'oT" tract $on surg. g g Zine Enhancements 19 Q t 200 inpction 3 60 g ___
175 g g 150 -
so . . . .
ioo , , , , , , , ,
1998 2001 1998 2001 3-Year Average .
l 9 l
i
A Urticom C ,
i i
l l
STRATEGIC REFORM INITIATIVES David R. Helwig Senior Vice President Nuclear Services 10 t
- 4 6 A Unicom Company STRATEGIC REFORM I3ITIATIVES (SRIs)
- Designed to Arrest Cyclic Performance AFocus on Performance and Results ADefined Expectations and Standards l
i ABasic Processes and Fundamentals
! AClear Roles and Responsibilities l AEffective Oversight e Implementation Complete
. Foundation for Continuous Improvement 4
11
A Urdcom Company EFFECTIVENESS REVIEWS
. Effectiveness Reviews Completed AOriginal Purpose Satisfied I
+ Accomplishments l
A Areas for Improvement Identified l
+ Focus Areas e Overall Effectiveness Review AScheduled To Begin End Of March ATeams Include Outside Experts 12
. . 3 .
7 comed A Urdcom Company NGG-1, STRENGTHEN PERFORMANCE 1 MONITORING AND MANAGEMENT t
- Accomplishments A Consistent Implementation of Measures AMeasures Aligned With Goals and Business Plan Actions l
, AIntegrated Process Supporting Management Review and Attention i
- Focus Area AUse for Trending and Analysis 13
comed A Urdecre Company NGG-3, ENSURE EXCELLENCE IN PLANT MATERIAL CONDITION
- Accomplishments AWork Control Planning Process A System Health Indicator Program (SHIP)
A Comprehensive Process Model and Reporting e Focus Areas Almprove Execution of Work Management ARefinement of Long-Term Planning Process AProactive Use of SHIP 14
i l comed - - - .
i GOING FORWARD e Tangible Performance Improvements Achieved
- Sustained Performance Requires Continued j l Vigilance (
l i
e SRIs Define Key Areas of Performance t
.
- Workforce Engagement and Continuous Improvement Must be a Way Of Life 15
l BWR PERFORMANCE Christopher M. Crane l
l BWR Vice President l
1 16 i
I.
t l
e -i quJ g. qej g <
uer f
l .g . - ..o um uer l
g AoN era j E iso $
] [ < dag hon y f ho """"""" Snv a gg ,, f" i.
Z]
P y'
O mummmmm' ine unc O
y I
Em des j
- 1 1mummmmum 4en 0 E
- . iE e ME sav i , , EmmmmEME Jdy O i e m a w
.T., a < 2en
, ine M ' 3 j
h ' "
o o mmmm"' uer E unc $
y
, Lets i Is-cs p 8 = = = a na==: ue-----
l l
74 ele 0 01- tusoJad t
! H
\
qaj e o qej uer eo uer o*C
! ci t sea i O ,
aos oo AoN $ j i*k E 'I too (/) N b Mnf b 0 ou soo $ 1 E
].
l
'U .I dos g j m 3
, n. E '
6ny ]
b, o l
4 -
4 s
4
. - inr
- " 6nv e unr CU Inr 1
1 i ; 46T6 N -
i une e
8 2 2 R 8 2
- 2 2 3
- a a - e ste0 01 -tusoJed sweJos lo JeqwnN l:
COmEsf A Unicome- , ,
QUAD CITIES STATION ACCOMPLISHMENTS AND RESULTS Since Restart, Sustained Dual Unit Operation e Well-Executed 28-Day Unit 1 Refueling Outage
. Strengthened On-Site And Corporate Oversight
- Engineering Improvements 1
18
? ' '
comed A Unicomm Company t
QUAD CITIES STATION ACCOMPLISHMENTS AND RESULTS :
o Long-Standing Material Condition Issues j Addressed AOperator Challenges Reduced A Corrective Maintenance Backlog Reduced e Fire Protection Program Improvements e Decrease In Human Error Events i
e Improved Trend In Operator Configuration Control Errors i e Chemistry Performance 19 :
comed a uncoom comoeny PERFORMANCE DECLINE ARRESTED, TREND IMPROVING e Focus Areas l
AOperations Leadership Role A Configuration Control Errors AWork Control Process AEquipment Reliability ARepetitive Equipment Problems AReduce Number of Maintenance Rule (a)(1)
Systems ARadiation Exposure 20
- , ~ *
- _ - . _ . . . . - - . . . _ ~ . .. ...... -. _ ... ._ . - - - - -. --. . ..
5 e a q.3 u Ea.3 4
uer h 080 uer
, n N AoN I G j iso $m **a
- .$ d'S E c
i E s
r m . .=
l M O Snv a E
+^N g t 2 4
~ b' $ , -
on., O E
lM so i N.
- j. & O G. g O
G 4C Z
2 M . d.,
j 0 Jdy O i r 9 1 f' d M Jen M y 1 Sny 3
> 483 E I e i M uer
, 46 { 6
! s~ a a s a s : 8 l h R GleQ 01 - }UGoJGd y 8
i 2 :
i
,M M, Pb9 ,#
)
god e,, q,3 I
4g ll uer g
c<l uer E
,g, .imummmmmmmmmme o., .
oii sed a
I . E m }l ADN I
h ,0 oo AoN too N E E 2 i
P E . .
. b oit IDO des _
! 4.; Bny o4. des l
j j
16t6 eo Sny
?
8 2 S 2 3 S S 2 2 2
- a a - o
)
- elec 01 - suaoJed sweJos 30 JeqmnN I
(
LASALLE ENIT 1 ACCOMPLISHMENTS AND RESULTS
- Management Team In Place and Engaged e Operating Fundamentals Improvements e Material Condition Improvements
- Long-Standing Design Issues Resolved 22
- . - 5
I comed A Unicom Company j i
NEXT STEPS
- Unit 2 Restart AOriginal Engineering Complete ADetailed Plan, Enhanced By Unit 1 Lessons-l Learned !
i i AComprehensive Assessment Of Restart Readiness n
23 i
A Unicom Company FOCUS AREAS l
e Work Management e Human Performance e Configuration Control
. Chemistry e Radiation Protection l
24
. . . . - . - - _ . . . .- . . - - . . . . . . - . . . ~ . . . - - - . . . .
N e m - 3 i 3 uer I o
uer E
380 300 o AoN E , AoN 33 0 8" 13 0 4 i des E M , des Hh 4 i Sny MM 6ny
]p O.
@ inc $ M inr
~
"9 unr Q M unr $
& O a a M new h MM Aan N Jdy O m ady a ~a m 2 . -
M
,e, 3
- ,e, q.J god M e 1, M uer uer Q.
16T6 L6T6 0
<g i ,
, , , , . . , , , no. :=,---a-t GleQ 01-IUG3J8d Z
[ w, r
f i
gs q.a e' q.a
=
g uer oii uer
! 080 ei, o.a e i'- ADN Cii ADN Cdi 33 0 l.CMl l
l M i
Inr
,0 B
= " ""
cn Sny
!g e
i co inr ch
! g unr E $
@ , samummmmmm- mmmmmmmme xen ,! ~ "' ""r "
g a _ ,, g cu se ,
N i ady jg II qag Cil ,en l
I i l uer C" q8a i
j i 26T6 '-'
M' uer l
a a l 8 s2 2 3 . 4 2 8 2 * -
i stea ol-lusaJed sweJos ;o JaqwnN l
DRESDEN STATION ACCOMPLISHMENTS AND RESULTS
= Scram Reduction e Material Condition Improvements l- e Better Operation e Improved Engineering
- Reduced Overall Radiation Exposure 1
26
. . t
i 1 A Urncom Company MOVING DRESDEN TO NEXT LEVEL OF PERFORMANCE
- Complete Identified Material Condition-Improvements l
- Further Improve Human Performance e Engineering Program Improvements e Additional Radiation Exposure Reduction a
27-
- - _ _ _ _ _ - _ ._ -_--_-____ _-_ .__ ----___-_--_____---________-____--__--_i
A Unicom company t
i i
PWR PERFORMANCE ,
H. Gene Stanley .
PWR Vice President i t
i f
i 28 r
.., g
- C
- I
l l l l:
l z
i h$
2 ,
- =y 7 0 M "
1 0
0 C 0 l 1
9 k 9 $ 0 l 3-1 9
9
$ 0 $ ln ~
7 P
E A 1 0 g
v e
r a d 0 A
u k ln l
C E R
t e o E a 5 0 p m a M
M 1
0 a t
i c
N E
c i
t F -
9 9
8 A
Y 0 S
c $
y F
a O
R c $ 0 r c t
u a $ t
- o 1
5 0 m s 5 r
MB
+
I 5
0 0
E ~
AY n E NR
^
d u 5 0 N CO t
r
_ y
- $ 0 $ ^
EN
- T po Q
u r IS MT t
i l
e 1 hh t 2 , : M 1
0 0 PA I
n d
j -
l -
R IT u
1 t
0 5 ,
A OO VN r
y
$ $ v e
0 M r e
a 5 E E
d 0 i
a g n F e Y 0 o k .
D i 0 r
c e i E I
N P M .
a t
a $ 0 d
O N , O P
E N
ci n l u A e n c 0 t r
dl a T
f u I g $ o Rd 0 e
r se f
uS g /
d 0 R a
mS a
n l
G 5 t 8
OR 0 e c u pe t $ E ,
e 0 i ga l n
- c $ 0 E , d se e m $ 0 N .
x e
2 n
t 0 9
- , l I [ ll
BYRON STATION PERFORMANCE e Top Level Plant Performance is Good
- NGG's Higher Performance Standards and More Effective Oversight Have Surfaced Low-Level ,
Issues e NGG and Site Management Addressing Low-Level Issues To Prevent Cyclical Performance 30
._ : . e
P Numberof Scrams Percent - To Date o - a = a 3 8 8 8 8 8 3 8 8 5 {
Jani - 93-97 '
r a f.
E Febi t c Jan Y
{ Marlic Feb Mar gg i,
> Apr i l C Mayc )>
g Apr g
Y L s
[
Junit c f
Jul i>o I, .
Aug o c y o Aug g a 2 Sepi t c 9 o ,
g kp -
- O oct o C
, g,,
Novll c M Nov . '
Dec o o Dec r' H Jani'c Jan r' j
$y Febiie Feb i
4 o
r>
m i R M I Percent - To Date o u . . . 3 8 8 0 8 8 $
M@w i
l j
g 93-97 93-97 O. r 7, Jan' m - Jan g o
, l m Feb M
[. Feb [
Mar m Wr g3[
g y i Apr + mm Q Apr g _
o "'Y - 2 M*Y 1mmmmmmea e c I a o T !
g Jun 1 Jun g g s ,
Jul C Jul gg 4 Q Aug m Aug WE k Sep' m Z Sep gg
}S l3 C oct
- oct l
- Q. Nov il Nov gg 08 3 I Dec '
Dec ggg
] Jan-m i Jan Wm j Feb 'g it Feb hA 1
l l
l l I
A Unicom Company LRAIDWOOD STATION .
ACCOMPLISHMENTS AND RESULTS
. Improved Material Condition
- Breaker-to-Breaker Operation ,
A467-Day Run For Unit 1 e World Record 70-Day Steam Generator I
! Replacement
- Engineering Improvements 32
- 4 1 O D
COMED A Ordcom Company i
6 S
CLOSING REMARKS
+
Oliver D. Kingsley, Jr.
Chief Nuclear Officer and President, NGG i
b 33
comed ONGOING APPROACH TO IMPROVEMENT
- Results to Date Validate Improvement Plan ASetting Expectations That Exceed Regulatory Standards e Method for Continuous Improvement AStandards and Programs .
APerformance Monitoring AStrong Management Team AIntervention As Required
= 1999: Sustain and Improve Performance e 2001: Achieve Top Quartile Performance 34 'l
-- t . 5-
ga REG l 4
5' A>
g I- .
f sa +
i s f- } Z : dp . g g
%, ryp/g sLk
+++++ ;
NRC STAFF'S ASSESSMENT OF COMMONWEALTH EDISON'S i PERFORMANCE l
Jim Dyer Region 111 March 2,1999 VIEWGRAPH 1 i
i
CHRONOLOGY o Commission Meeting 06/30/98 e Dresden removed from watch list 07/29/98 e LaSalle Unit 1 startup 08/01/98 .
e SRI Acknowledgment Letter 08/05/98
- Additional Comed Oversight Panel Meetings 09/14/98 11/17/98 01/28/99 e Braidwood Unit 1 completes S/G outage 11/12/98 e Quad Cities Unit 1 completes 28 day outage 12/05/98 e Dresden Unit 3 outage on schedule 02/25/99 t
VIEWGRAPH 2
- b O Y
'i REGIONAL ACTION e Completed corporate review of selected Strategic Reform Initiatives l
e Completed resident and regional inspection of selected Strategic Reform initiatives e Continued enhanced inspection and assessment of Comed
-* Continued public oversight meetings with Dresden, LaSalle,
- Quad Cities, and Comed senior management 1 e Conducted PPRs and SMM screening meetings VIEWGRAPH 3 ,
1 i
j [
f
RESULTS ,
e Concluded that Comed has implemented Strategic Reform initiatives e Performance improved at Dresden, LaSalle, Quad Cities l:
o Performance remained constant at Byron and Braidwood i
e improvements driven by Comed management team i
e Corporate assessmentloversight added value to improvement programs and processes VIEWGRAPH 4 i
t . u
- , e ,
1
~
FUTURE ACTIVITIES
- Continue Comed Performance Oversight Panels (CPOP) e Continue augmented coverage through LaSalle Unit 2 startup
- Continue enhanced inspections and periodic management ,
meetings - Dresden, LaSalle, and Quad Cities i
[