MONTHYEARML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6971995-12-21021 December 1995 Proposed Tech Specs,Deleting TS LCO 3.4.2 Action Statement B ML20093D4421995-10-0202 October 1995 Proposed TS Section 3.4.2,changing SRV Safety Valve Function Lift Setting Tolerance ML20091P8971995-08-28028 August 1995 Proposed Tech Specs,Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits for Unit 2 ML20084U3071995-06-0808 June 1995 Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/Edgs ML20084C2491995-05-23023 May 1995 Proposed Tech Specs,Clarifying Described Equipment out-of- Svc Options ML20083P6401995-05-19019 May 1995 Proposed Tech Specs,Revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9341995-04-11011 April 1995 Proposed Tech Specs Re Extension of Specific Surveillance Intervals ML20087H7871995-03-31031 March 1995 Proposed Tech Specs Section 3.4.2,revising SRV Safety Function Lift Setting Tolerances ML20078H1531995-01-30030 January 1995 Proposed Tech Specs,Proposing One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S3041995-01-13013 January 1995 Proposed Tech Specs Revising Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7081994-12-14014 December 1994 Proposed Tech Specs,Minimizing Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation in Reactor Protection,Isolation,Emergency Core Cooling,Recirculation Pump Trip & RCIC Sys ML20078B9571994-10-24024 October 1994 Proposed Tech Specs Associated W/Exemption Requests from App J for LaSalle Unit 2 to Return to Cilrt Type a Test Schedule of Three Times in 10 Yrs & for LaSalle Units 1 & 2 to Decouple Cilrt Type a Test Schedule from ISI Schedule ML20069J7801994-06-0909 June 1994 Proposed Tech Specs for Partial Implementation of GE ARTS Program ML20065A2231994-03-22022 March 1994 Proposed Tech Specs Re Deletion of Primary Containemnt Structural Integrity ML20063F3441994-01-28028 January 1994 Proposed Tech Specs 3.3.1 & 3.3.4,extending Surveillance Test Interval from Monthly to Quarterly to Verify Proper Position of MSIV Limit Switches for RPS Instrumentation Operability 1999-08-06
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212F9221999-09-23023 September 1999 Rev 2.3 to Chapters 10,11,12 & App F of LaSalle Annex Odcm ML20211L2871999-09-0202 September 1999 Revs to ODCM, for LaSalle Annex Including Rev 2.2 for Chapters 10,11,12 & App F ML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20207A9491999-02-23023 February 1999 Rev 4 to LaSalle County Station Restart Plan for Unit 2 ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20151Y5991998-09-14014 September 1998 Rev 3 to LaSalle County Station Restart Plan, for Unit 2 Only ML20236U5511998-07-24024 July 1998 NRC Manual Chapter 0350 Restart Action Plan,For LaSalle County Station ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20217N9541998-04-30030 April 1998 Rev 1.9 to Chapter 10,rev 2 to Chapter 11 & Rev 1.9 to Chapter 12 of LaSalle Odcm ML20217P2511998-04-28028 April 1998 Rev 2 to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20217Q7981997-08-26026 August 1997 Rev 1a to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20148D9561997-05-16016 May 1997 LSCS Unit 1/Unit 2 Restart Plan ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20140C9231997-03-31031 March 1997 Rev 1.9 to Chapter 11, Radiological Environ Monitoring Program & LaSalle Annex Index ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20134L0221996-11-30030 November 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11 & 12 ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20115D8781996-07-0808 July 1996 Cycle 8 Startup Test Rept ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20097C9051996-02-0202 February 1996 Rev 1 to ISI Plan for Comm Ed LaSalle County Station Units 1 & 2 Second Ten-Yr Interval Insp Program ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High 1999-09-23
[Table view] |
Text
~
i
-)
E ;
i I
.. , a ATIACHMENIR P ROPOSED_CBANGESIOlHEIECHNlGALSEERIElQ ATlON S . >
EQBREEB6TJNCtllGENSES_ NEE-11. AND NPF-18 -
REVISED PAGES UNIT 1 (NPF 11)
UNIT 2 (NPF-18) 3/4311 3/4 3-11 3/4 314 (a) _ 3/4 3:14 (a):-
B 3/4 3 2 B 3/4 3 2:
9101240353 910118 i PDR ADOCK 05000373 P PDR ,
~
~~
TABLE 3.3.2-1 ISOLATION ACTUATION INSTRIMEN'TATION s;~
VALVE GROUPS MIP"IPhiM OPERABLE : APPLICABLE OPERt. tid BY CHANNELS PER OPERATIONAL
. TRIP FUNCTION SIGNAL (a) TRIP SYSTEM (b) CONDITION ACTION $
5~ A. f.UTOMATIC INITIATION
~-
- 1. PRIMARY CONTAINMENI ISOLATION
- a. Reactor Vessel Water Level (1) . Low, Level 3 7 2 1, 2, 3 '20 (2) Low tow,' Level 2 2, 3 2 1, 2, 3 20 (3) Low Low Low, Level 1 [-
1, 10 2 1, 2, 3 20 i
- b. DryweII Pressure - High ~2. 7. 10 2 1, 2. 3 20
- c. Main Steam Line
- 1) Radiation - High J 2 1, 2, 3 ' 21 R
3 2 1, 2, 3- 22'
-2) Pressure - Low 1 2 1 23 y 3) Flow - High -1 2/line(d) - 1, 2, 3 ' 21 w
~ d. ' Main Steam Line Tunnel.
- Temperature - High' .172f36' 1 2. 21 ))'
- e. Main Steam Line Tunnel aTemperature - High ,d ) ,2'.3'I.
I.
1 2 I 21 *
- f. Condenser Vacuum Low .I 2 1, 2* , 3* 21 0)
- 2. SECONDARY CONTAINMENT ISOLATION
- a. Reactor Building Vent Exhaust Plenum Radiation - High 4 IC)I') 2 ,
1, 2.'3 and ** 24
- b. Drywell Pressure - High '4(c)(e) 2. 1, 2, 3 24 g . c. Ree: tor Vessel Water g)(,)
level - Low Low, Level 2 4 2 1,.2, 3, and , 24 g 'd, Fuel Pool Vent Exhaust
- Radiation - High ;4(C)f*) 2' 3,, 2. 3, and ** 24 .
- ,=
i TABLE 3.3.2-1 (Continued)
NOTES (Continued)
(g) Requires RCIC steam supply pressure-low coincident with drywell !
pressure high, (h) Manual initiation isolates 1E51-F008 only and only with a r,oincident ,
i g(1)BothchannelsoreachtripsystemmayDeplaceuinaninoperablestatusforuh eactor vessel water level-low. level 2 signal, to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for required reactor building ventilation filter change and damper i cycling without placing the trip system in the tripped. condition provided that 1 the a:bient temperature channels in the same trip systems are operable.
i l
Rept.act 1 WITH INSERT 1
9
(
LA SALLE UNIT-1 3/4 314 (a) Amendment No.26
i INSTRUMENfATION BASES 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION This specification ensures the effectiveness of the instrumentation used i to mitigate the consequences of accidents by prescribing the OPERABILITY trip setpoints and response times for isolation of the reactor systems. When necessary, :
one channel may be inoperable for brief intervals to conduct required surveillance.
Some of the trip settings may have tolerances explicitly stated where both the high (
geg and low values are critical and may have a substantial effect on safety. The set- (1 B points of other instrumentation, where only the high or low end of the setting itave a direct bearing on safety, are established at a level away from the normal operating range to prevent inadvertent actuation of the systems involved.
Except for the MSIVs, the safety analysis does not address ir.dividual sensor I response times or the response times of the logic systems to which the sensors are connected. For D.C. operated valves, a 3 second delay is assumed before the valve starts to move. For A.C. operated valves, it is assumed that the i A.C. power supply is lost and is restored by startup of the emergency diesel generators.
In this event, a time of 13 seconds is asi,umed before the valve starts to move. In addition to the pipe break, the failure of the D.C. operated valve startep.is assumed; thus the r,ignal delay is concurrent with the 13 second diesel The safety analysis considers an allowable inventory loss in each case which in turn determines the valve speed in conjunction with the 13 second delay, it follows that checking the valve speeds and the 13 second time for emergency '
power establishment will. establish the response time for the isolation function .
However, to enhance overall system reliability and to monitor instrument channel response time trends, the isolation actuation instrumentation response time shall be measured and recorded as a part of the ISOLATION SYSTEM RESPONSE TIME.
3/4.3.3 EMERGENCY CORE _ COOLING JYSTEM ACTUATION INSTRUMENTATION The emergency core cooling system actuation instrumentation is provided to initiate the abilityactions of the to mitigatetothe operator consequences of accidents that are beyond control. This specification provides the OPERABILITY requirements, trip setpoints and response times that will ensure offectiveness of the systems to provide the design protection. Although the instruments are listed by system, in some cases the same instrument may be used to send the actuation signal to more than one system at the same time.
G LA SALLE - UNIT 1 B 3/4 3-2
TABLE 3.3.2-1 g ISOLATION ACTUATION INSTRUMENTATION C,
m VALVE GROUPS MINIMUM OPERABLE APPtICABtE OPERATED BY CHANNELS PER OPERATIONAL g TRIP FUNCTION SIGNAL (a) TRIP SYSTEM (b) CONDITION ACTION
[ A. AUTOMATIC INITIA1 ION
- 1. PRIMARY CONTAINMENT ISCLATION
- a. Reactor Vessel Water Level (1) tow, Level 3 7 2 1,2,3 20 (2) Low Low, tevel 2 2, 3 2 1, 2, 3 20 (3) Low Low Low, Level 1 1, 10 2 1, 2, 3 20
- b. Drywell Pressure - High 2, 7, 10 2 1, 2, 3 20
- c. Main Steam Line y 1) Radiation - High 1 2 1,2,3 21 6
3 2 1,2,3 22 w
- 2) Pressure - Low
)
- 3) flow - High 1
1 2
2/1ine Id) 1 1, 2, 3 23 21 Main Steam Line Tunnel d.
Temperature - High 1 2 l! 2[3 [. 21
- e. Main Steam Line Tunnel a Temperature - High 1 2 g (i)f r3(i) 21 1(i) ,2
- f. Condenser Vacuum - Low 1 2 1, 2* , 3* 21 ~
2.
( )
SECONDARY CONTAINMENT ISOLATION
- a. Reactor Building Vent Exhaust Plenum Radiation - High 4(c)(e) 2 1, 2, 3 and ** 24 g b. Drywell Pressure - High 4(c)(e) 2 1, 2, 3 24
$ c. Reactor Vessel Water Level - tow tow, ievel 2 4(c)(e) 2 1, 2, 3, and 24 S 4. fuel Pool Vent Exhaust
- r Radiation - High 4(c)(e) ? 1, 2, 3, and ** 24
" ^
w
(i) Both channels of each triD system may be placed in an inoperable status for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for required reactor building ventilation filter change and damper cycling without placing the trip system in the tripped condition provided that the ambient temperature channels in the 5. e trip systems are OPERABLE,
_ i Rept4cs wira INSERT A 8
I LA SALLE - UNIT 2 3/4 3-14(a) Amendment No, }4
-n
1 M
INSTRUMENTATION BASES I l
3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION This specification ensures the effectiveness of the instrumentation used to mitigate the consequences of accidents by prescribing the OPERABILITY trip l setpoints and response times for isolation of the reactor systems. When necessary, one channel may be inoperable for brief intervals to conduct required surveillance.
lN6 EAT y Some of the trip settings may have tolerances explicitly stated where both the high B and low values are critical and may have a substantial effect on safety. The set-points of other instrumentation, where only the high or low end of the setting have a direct bearing on Fafety, are established at a level away from the normal operating range to prevent inadvertent actuation of the systems involved.
Except for the MSIVs, the safety analysis does not address individual sensor response times or the response times of the logic systems to which the sensors are connected. For D.C. operated valves, a 3 second delay is assumed before the valva starts to move. For A.C. operated valves, it is assumed that the A.C. power supply is lost and is restored by startup of the emergency diesel generators. In this event, a time of 13 seconds is assumed before the valve starts to move. In addition to the pipe break, the failure of the D.C. operated valve is assumed; thus the signal delay is concurrent with the 13 second diesel startup. The safety analysis considers an allowable inventory loss in each case which in turn determines the valve speed in conjunction with the 13 second delay.
It follows that checking the valve speeds and the 13 second time for emergency power establishment will establish the response time for the isolation functions.
However, to enhance overall system reliability and to monitor instrument channel response time trends, the isolation actuation instrumentation response time shall be measured and recorded as a part of the ISOLATION SYSTEM RESPONSE TIME, 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION The amergency core cooling system actuation instrumentation is provided to initiate actions to mitigate the consequences of accidents that are beyond the ability of the operator to control. This specification provides the OPERABILITY requirements, trip setpoints and response times that will ensure effectiveness of the systems to provide the design protection. Although the instruments are listed by system, in some cases the same instrument may be used to send the actuation signal to more than one system at the same time.
LA SALLE - UNIT 2 8 3/4 3-2
-.- ._- --_._- - ._- - .-._. - ._ . .- . . - - - . . .~ . - - . . . . .-.
J .
' O-J l INSERT A
- l. Both channels of each tria system may be placed in an inoperable status for i j up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for requirec reactor building ventilation system corrective -
maintenance, filter changes, damper cycling and surveillance tests, other j than Surveillance Requirement 4.6.5.1.c, without placing the trip. system in the tripped condition..
l J. Both channels of each tilp system may be placed in an inoperable status for u a to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for performance of Surveillance Requirement 4.6.5.1.c without p acing the trip system in the tripped condition.
l lNSERT B Both channels of each tria system for the main steam tunnel ambient temperature i and ventilation system dHerential temperature may be placed in an inoperable status for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for required reactor building ventilation system maintenance and -
testin and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for the required secondary containment Leak Rate test without plac the trip system in the tripped condition. This will allow for maintaining the reliabl ity of the ventilation system and secondary containment. -