Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] |
Text
OYSTER CREEK NUCLEAR GENERATING STATION l.
OPERATING LICENSE NO. DPR-16 i
TECHNICAL SPECIFICATION CHANGE REQUEST NO.266 DOCKET NO. 50-219 Applicant submits by this Technical Specification Change Request No. 266 to the Oyster Creek Nuclear Generating Station Technical Specifications, modified pages 2.3-1,2.3-2,2.3-3,2.3-4, 2.3-5,2.3-6,2.3-7,2.3-8,3.1-9,3.1-10,3.1-11,3.1-12,3.1-13,3.1 .14,3.1-15,3,1-16,3.1-17, '
3.1 -18, 3.1 - 19, 3.1 -20, 3.1 -21, 4.1 -1, 4.1 -2, 4.1 -3, 4.1 -4, 4.1 -5, 4.1 -6, 4.1 -7, 4.1 -8,4.1 -9, and 4.1-10.
By: b Michael B. Roche Vice President and Director Oyster Creek Sworn to and Subscribed before me this. day of November 5, 1998.
jeu)/ u fi n/s/g)
Notary Public l GEFW1 DINE E.UivlN i NOTARYPUBUC0FWN
- 4 m espus i, Y M o l
l 9911120279 981105 "
PDR ADOCK 05000219 P PDR ,
L _
,. - _ - - - - .-- . -- . .- -. . - ~ . . ..- -.
l- ,
L 1 l
1 I. TECHNICAL SPECIFICATION CHANGE REQUEST (TSCR) NUMBER 266 l l L l GPU Nuclear requests that the following replacement pages be inserted into the existing Technical Specifications:
I Replace existing Section 2.3 in its entirety, Table 3.l'.1 in its entirety, and Tables 4.1-1 and 4.1-2 in their entirety with the attached replacement pages 2.3-1 through 2.3-8,3.1-9 through 3.1-21 and 4.1-1 through 4.1-10.
IL REASON FOR CHANGE L
! In accordance with TS 3.1.B.3, an average power range monitor (APRM) channel cannot L be bypassed in a quadrant diagonally opposite a quadrant containing more than one L bypassed or failed local power range monitor (LPRM) detector on the same axial level l unless one of the following conditions exist:
- 1. The APRM channel bypass is'in support of a technical specification required LPRM/APRM surveillance.
- l. 2.- ' Power is reduced below the 80% rod line.
- 3. The corresponding reactor protections system (RPS) trip system is placed in the I tripped condition. ;
l l l ~ During the NRC integrated engineering inspection at Oyster Creek, the bypass of an )
!- APRM channel to perform LPRM calibrations was reviewed. On February 21,1995 l L APRM channel 5 was bypassed in support of an LPRM calibration at the same time that L two LPRMs at the same axial level and in the diagonally opposite quadrant were l inoperable. At the time, GPUN evaluated the LPRM calibration as a technical L specification (TS) surveillance required to ensure that the APRMs were accurately L reading reactor power and were operable. Given this interpretation, TS 3.1.B.3 was met l - and there was no need to reduce power below the 80% rod line or place the RPS trip system in the tripped condition. The NRC concluded, however, since LPRM calibration is not an activity specifically listed in the Oyster Creeks TS surveillance section, it is not a TS required surveillance and, as a result, TS 3.1.B.3 was violated.
GPU Nuclear believes that the type of calibration discussed above is appropriate and ensures the accuracy and operability of the APRM system. In order to eliminate any ambiguity, a review of the technical specifications was performed to identify all changes
! required to ensure the accuracy and operability of the APRM system.
i-The actual changes to Section 2.3 are to add specification 2.3.A.3 and its associated basis
- statement and to make another unrelated change to the Bases. GPUN elected to use this opportunity to re-format the entire Section to make it easier to read and to separate the l
i:
1 i
Bases segment to facilitate any subsequent change. Similarly, although there is only one line item being added to Table 3.1.1 (Item 3.1.A.13) GPUN has re-formatted the entire l Table,' eliminating style and font inconsistencies and changing its orientation to i landscape. The result of these changes is to make the table easier to read and understand.
There are two changes to Table 4.1.1, Item 11 was expanded and Item 32 was added. The
- t. format of Table 4.1.1 was changed in the same manner for the same reasons as Table 3.1.1. Both Tables have been repaginated as a result of these changes.
l' The Bases change to Section 2.3, unrelated to the APRM/LPRM issue, is a clarification l identified in a TS review performed as a result of the integrated engineering inspection.
l The wording was modified to clarify that there are two sets of relays with two-out-of i three coincident logic for undervoltage protection. ;
)
l 111. SAFETY EVALUATION JUSTIFYING CHANGE '
The Neutron Monitoring System provides the capability to monitor neutron flux in the l L reactor core from the low intensity of the shutdown condition to the neutron flux !
L anticipated in the case of overpower conditions requiring reactor scram. For power range j monitoring, selected groups of LPRMs provide input signals to the APRMs for bulk l
! power level monitoring and automatic core protection. Four APRM channels are 1 connected in each of the two-reactor protection system (RPS) channels.
When one or more monitored parameters exceed their specified limits, the RPS initiates a l- reactor seram signal to preserve the integrity of the fuel cladding and the Reactor Coolant L System and minimize the energy that must be absorbed following a loss of coolant accident. A high APRM (neutron flux) level automatically initiates a scram signal to limit the heat flux to a level well below that which could cause fuel damage.
l The proposed technical specification changes to the limitr and surveillances of the LPRM and APRM systems and the related Bases changes are provided to ensure the APRM channels respond within the necessary range and accuracy and to verify channel, operability. Specifically, an additional limiting safety system setting (LSSS) has been included in Specification 2.3. Protective instrumentation requirements have been added to Table 3.1.1 for the APRM Downscale /1RM Upscale scram function. The delineation of the specific trip function has been added to the APRM Scram Trips surveillance
! section of Table 4.1.1. In addition, the surveillance requirements of the LPRMs have j been added to Table 4.1.1. The check, calibration, and test frequencies for the APRM
~
scram trips identified in the current TS remain unchanged.
l The APRM downscale setpoint requirement is to be included in the technical
- specifications as a limiting safety system setting (LSSS 2.3.A.3). The setting of 2 2% is
[ based upon ensuring APRMs are in the linear scale and operable when transfers are made i between APRMs and IRMs.
I
The APRM downscale/IRM upscale scram signal ensures that there is adequate Neutron )
Monitoring System protection if the reactor mode switch is placed in the run position prior to the APRMs coming on scale. With the reactor mode switch in run, an APRM downscale signal coincident with an associated IRM high-high or channel inoperative signal generates a trip signal. This signal is not specifically credited in the accident analysis but is retained for overall redundancy and diversity of the RPS.
As gradual changes in the core flux distribution and neutron detector (LPRM) sensitivity t occur as a result of changes in control rod patterns and core exposure the corresponding APRM output signal is affected. Performing the APRM level (calorimetric) adjustment at least once every three days and the 1000 MWD /MT LPRM calibration against the TIPS compensates for these changes. These calibrations are necessary in order to ennte the channel output responds within the range and accuracy required for the RPS sy n:m.
The calibration of the APPJ& to the reactor power calculated from a heat balance ensures that the APRMs are accurately indicating the true core average power. Limiting Safety System Setting (LSSS) 2.3.A.1 allows the APRMs to be reading greater than actual thermal power'to compensate for localized power peaking. The requirement for the absolute difference between the APRM channel readings and the calculated power to indicate within 2% RTP is modified to include any gain adjustments required by LSSS 2.3.A. and is consistent with the Standard Technical Specifications (STS).
The LPRM front panel (electronic) test and calibration is performed every 12 months.
This test and calibration is provided to check individual LPRM power supply reference and base voltages and to verify LPRM operability. The 12-month frequency is based on operating experience with LPRM power supply changes.
LPRM gain settings are determined from the local flux profiles measured by the j Traversing Incore Probe (TIP) System. This establishes the relative local flux profile for appropriate representative input to the APRM System. The 1000 MWD /T Frequency is I based on operating experience with LPRM sensitivity changes and is consistent with the l STS.
IV. NO SIGNIFICANT HAZARDS DETERMINATION GPU Nuclear has determined that this TSCR poses no significant hazard as defined by 10 CFR 50.92.
- 1. The proposed technical specification changes to the limits and surveillance requirements of the LPRM and APRM systems are provided to ensure the APRM channels respond within the necessary range and accuracy and to verify channel operability. If one or more monitored parameters exceeded their specified limits, the RPS initiates a reactor scram signal to preserve the integrity of the fuel cladding and the
Reactor Coolant System and minimize the energy that must be absorbed following a loss of coolant accident. Therefore, the probability of occurrence or the consequences of an accident previously evaluated in the SAR will not increase as a result of these changes.
- 2. The proposed technical specification changes to the limits and surveillance ;
requirements of the LPRM and APRM systems are provided to ensure the APRM l channels respond within the necessary range and accuracy and to verify channel i operability. The proposed changes are designed to ensure the APRM system responds in a manner that ensures the safety limits, limiting safety system settings, limiting conditions for operations, as well as design parameters for the APRM system and !
individual components are continuously met. Therefore, the proposed activity does not ,
create the possibility for an accident or malfunction of a different type than any previously identified in the SAR.
l~ .
l 3. The proposed change does not involve a significant reduction in the margin of safety.
- l. When the APRMs exceed their specified limits, the RPS initiates a reactor scram signal to
, preserve the integrity of the fuel cladding and the Reactor Coolant System and minimize I
the energy that must be absorbed following a loss of coolant accident. The proposed ;
changes are designed to assure the APRM system responds in a manner that ensures the ,
safe.ty limits, limiting safety system settings, limiting conditions for operations, as well as design parameters for the APRM system and individual components are continuously met. Therefore, the margin of safety will not be reduced.
V. IMPLEMENTATION GPU Nuclear requests that this amendment be effective thirty days after issuance.
t i
l 4
. . . , , -