ML20202F580

From kanterella
Revision as of 01:38, 15 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept SR 86-01:on 860315,all Monitor Channels on Primary Meteorological Tower Incapacitated Due to Lightning. Temp Channels Required Replacement.On 860317,spare Processor Failed.Replacement Expected by 860402
ML20202F580
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/01/1986
From: Shiffer J, Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
DCL-86-088, DCL-86-88, SR-86-01, SR-86-1, NUDOCS 8604140179
Download: ML20202F580 (1)


Text