|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20199E1051999-01-13013 January 1999 Summary of 981119 Meeting with Util to Discuss Pge Preliminary Plans for Final Site Radiation Surveys at Trojan Nuclear Plant.List of Attendees Encl ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl1998-06-16016 June 1998 Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl ML20141H7051997-05-19019 May 1997 Summary of 970508 Meeting W/Util Mgt to Provide Info to NRC Re Decommissioning Plans for Plant.List of Meeting Attendees Encl ML20129E2231996-09-24024 September 1996 Summary of 960911 Meeting W/Licensee in Washington,Dc Re Plant SFP Debris Recovery Program.List of Attendees & Copy of Licensees Handout Encl ML20129G2581996-04-11011 April 1996 Summary of ACRS Fire Protection Subcommittee Meeting on 960229 in Rockville,Md to Gather Info Re Probabilistic Risk Assessment (PRA) Model for Evaluating Fire Risk During self-induced Station Blackout (Sisbo) ML20059F2621994-01-10010 January 1994 Summary of 931130 Meeting W/Util at Plant to Discuss Variety of Topics Related to Efforts by Licensee to Decommission Facility ML20058B5681993-11-18018 November 1993 Trip Rept of 931102 Meeting Between NRC & Util Re Planned Research on naturally-aged Cables from Plant ML20055G9391990-07-19019 July 1990 Summary of 900612 Meeting W/Util Re Reactor Protection Sys Walkdown Results & Proposed Mods.List of Attendees & Handouts Encl ML20196C2491988-11-30030 November 1988 Summary of 881110 Meeting W/Util & B&W to Discuss Use of B&W Mfg Fuel at Facility.Handouts from Meeting & List of Attendees Encl ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20196L2221988-06-23023 June 1988 Summary of 880531 Meeting on Pressurizer Surge Line Movement & Pipe Whip Restraint Program.List of Attendees & Presentation Handouts Encl ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20235R3671987-09-30030 September 1987 Summary of 870820 Meeting W/Util Re Adequacy of Support Design Verification.List of Attendees Encl ML20235G8061987-09-25025 September 1987 Summary of 870715 Meeting W/Util,Bechtel & Gao Re Main Steam Support Adequacy & Main Feedwater Pipe Thinning.List of Attendees & Util Presentation Encl ML20237J6311987-08-13013 August 1987 Trip Rept of 870722-23 Site Visit to Gather First Hand Info Re Main Feedwater Line Pipe Wall Thinning Problem,Review Licensee Pipe Wall Thinning Monitoring Program & Evaluate Results of Licensee Failure Analysis ML20236L3451987-07-30030 July 1987 Summary of 870617 Meeting W/Util,Bechtel & Impell Re Results of Analyses Concerning Accumulator Fill Line Failure,Main Feedwater Failure & Main Steam Line Thin Wall at Plant.List of Attendees & Viewgraphs Encl ML20245B9271987-06-25025 June 1987 Summary of 870317-18 Meeting at Facility Re SPDS & Dcrdr. Dcrdr Discussions Centered on Certain Human Engineering Deficiencies Whose Resolution Required Addl Info &/Or in-plant Verification ML20215J2291987-06-22022 June 1987 Summary of Meeting W/Util on 870408 in Bethsda,Md Re Technical Issues Related to Util Amend Request for F* Steam Generator Tube Plugging Criteria.Attendees List & Meeting Viewgraphs Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20210L7201986-09-24024 September 1986 Summary of 860529 Meeting W/Util in Bethesda,Md Re Inoperable Steam Generator Hydraulic Snubbers Relationship to Restrained Thermal Growth of Rcs.Supporting Info Encl ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl ML20203N0411986-09-18018 September 1986 Summary of 860513-14 Meetings W/Util at Site & in Portland, or Re Current Licensing Activities & to Meet W/Plant & Corporate Staff as Result of Appointment of New NRC Plant Manager.Attendees List Encl ML20210S2271986-05-15015 May 1986 Trip Rept of 860510-11 Site Visit to Participate in Licensee Cold Walkdown of Reactor Coolant Loop Piping & Components, Including Supports,To Assess Whether Cause of LER 85-013, Rev 1 Determined ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151Y0031986-01-29029 January 1986 Summary of 860108-09 Meetings W/Util in Bethesda,Md Re Current Licensing Activities & Reestablishment of Compatible Priorities & Schedules Since NRR Reorganization.Attendee List Encl ML20137M6361986-01-14014 January 1986 Summary of 851126 Meeting W/Util at Site Re Five Requested Exemptions from Specific Requirements of Section Iii.G of App R (Fire Protection).List of Attendees & Request for Info Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl IA-85-353, Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl1985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20134A5161985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20062J7361980-10-20020 October 1980 Summary of 800930 Meeting W/Util & Westinghouse Re Lab Examination Results for Steam Generator Row 1 U-bend Tube Samples Removed from Plant ML20125C1751979-12-19019 December 1979 Summary of 791205-06 Meeting W/Util & Bechtel Re Discussion of LER 79-15 Wherein Certain Problems W/Masonry Block Walls & Support Reactions of Equipment/Piping Attached Thereto Were Identified ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-01-13
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20199E1051999-01-13013 January 1999 Summary of 981119 Meeting with Util to Discuss Pge Preliminary Plans for Final Site Radiation Surveys at Trojan Nuclear Plant.List of Attendees Encl ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl1998-06-16016 June 1998 Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl ML20141H7051997-05-19019 May 1997 Summary of 970508 Meeting W/Util Mgt to Provide Info to NRC Re Decommissioning Plans for Plant.List of Meeting Attendees Encl ML20129E2231996-09-24024 September 1996 Summary of 960911 Meeting W/Licensee in Washington,Dc Re Plant SFP Debris Recovery Program.List of Attendees & Copy of Licensees Handout Encl ML20129G2581996-04-11011 April 1996 Summary of ACRS Fire Protection Subcommittee Meeting on 960229 in Rockville,Md to Gather Info Re Probabilistic Risk Assessment (PRA) Model for Evaluating Fire Risk During self-induced Station Blackout (Sisbo) ML20059F2621994-01-10010 January 1994 Summary of 931130 Meeting W/Util at Plant to Discuss Variety of Topics Related to Efforts by Licensee to Decommission Facility ML20055G9391990-07-19019 July 1990 Summary of 900612 Meeting W/Util Re Reactor Protection Sys Walkdown Results & Proposed Mods.List of Attendees & Handouts Encl ML20196C2491988-11-30030 November 1988 Summary of 881110 Meeting W/Util & B&W to Discuss Use of B&W Mfg Fuel at Facility.Handouts from Meeting & List of Attendees Encl ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20196L2221988-06-23023 June 1988 Summary of 880531 Meeting on Pressurizer Surge Line Movement & Pipe Whip Restraint Program.List of Attendees & Presentation Handouts Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20235R3671987-09-30030 September 1987 Summary of 870820 Meeting W/Util Re Adequacy of Support Design Verification.List of Attendees Encl ML20235G8061987-09-25025 September 1987 Summary of 870715 Meeting W/Util,Bechtel & Gao Re Main Steam Support Adequacy & Main Feedwater Pipe Thinning.List of Attendees & Util Presentation Encl ML20236L3451987-07-30030 July 1987 Summary of 870617 Meeting W/Util,Bechtel & Impell Re Results of Analyses Concerning Accumulator Fill Line Failure,Main Feedwater Failure & Main Steam Line Thin Wall at Plant.List of Attendees & Viewgraphs Encl ML20245B9271987-06-25025 June 1987 Summary of 870317-18 Meeting at Facility Re SPDS & Dcrdr. Dcrdr Discussions Centered on Certain Human Engineering Deficiencies Whose Resolution Required Addl Info &/Or in-plant Verification ML20215J2291987-06-22022 June 1987 Summary of Meeting W/Util on 870408 in Bethsda,Md Re Technical Issues Related to Util Amend Request for F* Steam Generator Tube Plugging Criteria.Attendees List & Meeting Viewgraphs Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20210L7201986-09-24024 September 1986 Summary of 860529 Meeting W/Util in Bethesda,Md Re Inoperable Steam Generator Hydraulic Snubbers Relationship to Restrained Thermal Growth of Rcs.Supporting Info Encl ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl ML20203N0411986-09-18018 September 1986 Summary of 860513-14 Meetings W/Util at Site & in Portland, or Re Current Licensing Activities & to Meet W/Plant & Corporate Staff as Result of Appointment of New NRC Plant Manager.Attendees List Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151Y0031986-01-29029 January 1986 Summary of 860108-09 Meetings W/Util in Bethesda,Md Re Current Licensing Activities & Reestablishment of Compatible Priorities & Schedules Since NRR Reorganization.Attendee List Encl ML20137M6361986-01-14014 January 1986 Summary of 851126 Meeting W/Util at Site Re Five Requested Exemptions from Specific Requirements of Section Iii.G of App R (Fire Protection).List of Attendees & Request for Info Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl ML20134A5161985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl IA-85-353, Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl1985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20062J7361980-10-20020 October 1980 Summary of 800930 Meeting W/Util & Westinghouse Re Lab Examination Results for Steam Generator Row 1 U-bend Tube Samples Removed from Plant ML20125C1751979-12-19019 December 1979 Summary of 791205-06 Meeting W/Util & Bechtel Re Discussion of LER 79-15 Wherein Certain Problems W/Masonry Block Walls & Support Reactions of Equipment/Piping Attached Thereto Were Identified ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-01-13
[Table view] |
Text
December 16 1998 g MEMORANDUM TO: Susan F. Shankman, Deputy Director l Licensing and Insp ction Directorate i ~l' Spent Fuel Projtct Offica Office of Nuclear Material Safety and Safeguards FROM: Timothy J. Kobetz, Project Manager Spent Fuel Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards
SUBJECT:
SUMMARY
OF THE NOVEMBER 19,1998, MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND PORTLAND GENERAL ELECTRIC TO DISCUSS EMERGENCY PLANNING (L22102)
On November 19,1998, a meeting was held between the Nuclear Regulatory Commission (NRC) staff and representatives of Portland General Electric (PGE) to discuss several issues pertaining to PGE's independent spent fuel storage installation (ISFSI) Emergency Plan. These ,
issues will require resolution before NRC can issue a license to PGE to operate an ISFSI at !
Trojan Nuclear Plant. An attendance list is included (Attachment 1). Notification that meetings concerning theTrojan ISFSI may take place beMeen November 19,199,8 and March 31,1999, was published on November 3,1998. ,
At the meeting SFPO staff presented its findings regarding PGE's Emergency Plan for off-normal and accident scenarios at the Trojan ISFSI. In general the staff noted that, while PGE's plan covered all of the areas required by 10 CFR 72.32, the plan did not contain sufficient detail for the staff to determine whether the plan met the intent of the regulations. PGE staff committed to provide NRC with a revision to the Emergency Plan, containing the required information, no later than December 18,1998. PGE plans to begin operating the ISFSI at Trojan in April 1999. During the course of the meeting, no regulatory decisions were requested or made.
Please contact me if you wish to discuss these issues.
Docket 72-17, 50-344
Attachment:
Attendance List h \
\ l Distribution: ,
Dockets PEng PUBLIC FLyon, NRR NRC File Center EEaston NMSS R/F LKokajko SFPO R/F SFLS R/F SGagner, OPA FStur2 O\ l VEverett, RIV BSpitzburg,RIV NRC Attendees LThonus, NRR SO' Conner MWHodges j
. SMirsky, SAIC MMasnick, NRR TJohnson, NMSS WFKane DReid
)
OFC SF h C SFPO m h SFPO [
NAME TJKobetz VTh EJLeeds .
DATE 12// [ 98 12/lI/98 12/ /dT9 C = COVER E = COVER & ENCLOSURE N s NO COPY G:\ TROJAN \TROJ1119.wpd OFFICIAL RECORD COPY 981510109 991216 PDR ADOCK 03000344 F PDR )
l ..
- l s
ATTENDANCE LIST November 19,1998, Meeting between Nuclear Regulatory Commission Staff and Portland General Electric Name Affiliation Tim Kobetz NRC/NMSS/SFPO Tom Meek Portland General Electric Lansing Dusek Portland General Electric Jerry Cooper Portland General Electric Gina Huey Portland General Electric 1
Attachment 1