MONTHYEARML20199E1051999-01-13013 January 1999 Summary of 981119 Meeting with Util to Discuss Pge Preliminary Plans for Final Site Radiation Surveys at Trojan Nuclear Plant.List of Attendees Encl ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl1998-06-16016 June 1998 Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl ML20141H7051997-05-19019 May 1997 Summary of 970508 Meeting W/Util Mgt to Provide Info to NRC Re Decommissioning Plans for Plant.List of Meeting Attendees Encl ML20129E2231996-09-24024 September 1996 Summary of 960911 Meeting W/Licensee in Washington,Dc Re Plant SFP Debris Recovery Program.List of Attendees & Copy of Licensees Handout Encl ML20129G2581996-04-11011 April 1996 Summary of ACRS Fire Protection Subcommittee Meeting on 960229 in Rockville,Md to Gather Info Re Probabilistic Risk Assessment (PRA) Model for Evaluating Fire Risk During self-induced Station Blackout (Sisbo) ML20059F2621994-01-10010 January 1994 Summary of 931130 Meeting W/Util at Plant to Discuss Variety of Topics Related to Efforts by Licensee to Decommission Facility ML20058B5681993-11-18018 November 1993 Trip Rept of 931102 Meeting Between NRC & Util Re Planned Research on naturally-aged Cables from Plant ML20055G9391990-07-19019 July 1990 Summary of 900612 Meeting W/Util Re Reactor Protection Sys Walkdown Results & Proposed Mods.List of Attendees & Handouts Encl ML20196C2491988-11-30030 November 1988 Summary of 881110 Meeting W/Util & B&W to Discuss Use of B&W Mfg Fuel at Facility.Handouts from Meeting & List of Attendees Encl ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20196L2221988-06-23023 June 1988 Summary of 880531 Meeting on Pressurizer Surge Line Movement & Pipe Whip Restraint Program.List of Attendees & Presentation Handouts Encl ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20235R3671987-09-30030 September 1987 Summary of 870820 Meeting W/Util Re Adequacy of Support Design Verification.List of Attendees Encl ML20235G8061987-09-25025 September 1987 Summary of 870715 Meeting W/Util,Bechtel & Gao Re Main Steam Support Adequacy & Main Feedwater Pipe Thinning.List of Attendees & Util Presentation Encl ML20237J6311987-08-13013 August 1987 Trip Rept of 870722-23 Site Visit to Gather First Hand Info Re Main Feedwater Line Pipe Wall Thinning Problem,Review Licensee Pipe Wall Thinning Monitoring Program & Evaluate Results of Licensee Failure Analysis ML20236L3451987-07-30030 July 1987 Summary of 870617 Meeting W/Util,Bechtel & Impell Re Results of Analyses Concerning Accumulator Fill Line Failure,Main Feedwater Failure & Main Steam Line Thin Wall at Plant.List of Attendees & Viewgraphs Encl ML20245B9271987-06-25025 June 1987 Summary of 870317-18 Meeting at Facility Re SPDS & Dcrdr. Dcrdr Discussions Centered on Certain Human Engineering Deficiencies Whose Resolution Required Addl Info &/Or in-plant Verification ML20215J2291987-06-22022 June 1987 Summary of Meeting W/Util on 870408 in Bethsda,Md Re Technical Issues Related to Util Amend Request for F* Steam Generator Tube Plugging Criteria.Attendees List & Meeting Viewgraphs Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20210L7201986-09-24024 September 1986 Summary of 860529 Meeting W/Util in Bethesda,Md Re Inoperable Steam Generator Hydraulic Snubbers Relationship to Restrained Thermal Growth of Rcs.Supporting Info Encl ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl ML20203N0411986-09-18018 September 1986 Summary of 860513-14 Meetings W/Util at Site & in Portland, or Re Current Licensing Activities & to Meet W/Plant & Corporate Staff as Result of Appointment of New NRC Plant Manager.Attendees List Encl ML20210S2271986-05-15015 May 1986 Trip Rept of 860510-11 Site Visit to Participate in Licensee Cold Walkdown of Reactor Coolant Loop Piping & Components, Including Supports,To Assess Whether Cause of LER 85-013, Rev 1 Determined ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151Y0031986-01-29029 January 1986 Summary of 860108-09 Meetings W/Util in Bethesda,Md Re Current Licensing Activities & Reestablishment of Compatible Priorities & Schedules Since NRR Reorganization.Attendee List Encl ML20137M6361986-01-14014 January 1986 Summary of 851126 Meeting W/Util at Site Re Five Requested Exemptions from Specific Requirements of Section Iii.G of App R (Fire Protection).List of Attendees & Request for Info Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl IA-85-353, Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl1985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20134A5161985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20062J7361980-10-20020 October 1980 Summary of 800930 Meeting W/Util & Westinghouse Re Lab Examination Results for Steam Generator Row 1 U-bend Tube Samples Removed from Plant ML20125C1751979-12-19019 December 1979 Summary of 791205-06 Meeting W/Util & Bechtel Re Discussion of LER 79-15 Wherein Certain Problems W/Masonry Block Walls & Support Reactions of Equipment/Piping Attached Thereto Were Identified ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-01-13
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20199E1051999-01-13013 January 1999 Summary of 981119 Meeting with Util to Discuss Pge Preliminary Plans for Final Site Radiation Surveys at Trojan Nuclear Plant.List of Attendees Encl ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl1998-06-16016 June 1998 Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl ML20141H7051997-05-19019 May 1997 Summary of 970508 Meeting W/Util Mgt to Provide Info to NRC Re Decommissioning Plans for Plant.List of Meeting Attendees Encl ML20129E2231996-09-24024 September 1996 Summary of 960911 Meeting W/Licensee in Washington,Dc Re Plant SFP Debris Recovery Program.List of Attendees & Copy of Licensees Handout Encl ML20129G2581996-04-11011 April 1996 Summary of ACRS Fire Protection Subcommittee Meeting on 960229 in Rockville,Md to Gather Info Re Probabilistic Risk Assessment (PRA) Model for Evaluating Fire Risk During self-induced Station Blackout (Sisbo) ML20059F2621994-01-10010 January 1994 Summary of 931130 Meeting W/Util at Plant to Discuss Variety of Topics Related to Efforts by Licensee to Decommission Facility ML20055G9391990-07-19019 July 1990 Summary of 900612 Meeting W/Util Re Reactor Protection Sys Walkdown Results & Proposed Mods.List of Attendees & Handouts Encl ML20196C2491988-11-30030 November 1988 Summary of 881110 Meeting W/Util & B&W to Discuss Use of B&W Mfg Fuel at Facility.Handouts from Meeting & List of Attendees Encl ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20196L2221988-06-23023 June 1988 Summary of 880531 Meeting on Pressurizer Surge Line Movement & Pipe Whip Restraint Program.List of Attendees & Presentation Handouts Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20235R3671987-09-30030 September 1987 Summary of 870820 Meeting W/Util Re Adequacy of Support Design Verification.List of Attendees Encl ML20235G8061987-09-25025 September 1987 Summary of 870715 Meeting W/Util,Bechtel & Gao Re Main Steam Support Adequacy & Main Feedwater Pipe Thinning.List of Attendees & Util Presentation Encl ML20236L3451987-07-30030 July 1987 Summary of 870617 Meeting W/Util,Bechtel & Impell Re Results of Analyses Concerning Accumulator Fill Line Failure,Main Feedwater Failure & Main Steam Line Thin Wall at Plant.List of Attendees & Viewgraphs Encl ML20245B9271987-06-25025 June 1987 Summary of 870317-18 Meeting at Facility Re SPDS & Dcrdr. Dcrdr Discussions Centered on Certain Human Engineering Deficiencies Whose Resolution Required Addl Info &/Or in-plant Verification ML20215J2291987-06-22022 June 1987 Summary of Meeting W/Util on 870408 in Bethsda,Md Re Technical Issues Related to Util Amend Request for F* Steam Generator Tube Plugging Criteria.Attendees List & Meeting Viewgraphs Encl ML20204E4951987-03-19019 March 1987 Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20210L7201986-09-24024 September 1986 Summary of 860529 Meeting W/Util in Bethesda,Md Re Inoperable Steam Generator Hydraulic Snubbers Relationship to Restrained Thermal Growth of Rcs.Supporting Info Encl ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl ML20203N0411986-09-18018 September 1986 Summary of 860513-14 Meetings W/Util at Site & in Portland, or Re Current Licensing Activities & to Meet W/Plant & Corporate Staff as Result of Appointment of New NRC Plant Manager.Attendees List Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151Y0031986-01-29029 January 1986 Summary of 860108-09 Meetings W/Util in Bethesda,Md Re Current Licensing Activities & Reestablishment of Compatible Priorities & Schedules Since NRR Reorganization.Attendee List Encl ML20137M6361986-01-14014 January 1986 Summary of 851126 Meeting W/Util at Site Re Five Requested Exemptions from Specific Requirements of Section Iii.G of App R (Fire Protection).List of Attendees & Request for Info Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl ML20134A5161985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl IA-85-353, Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl1985-07-15015 July 1985 Summary of 840223 Meeting W/Util Re Spirit Lake Blockage & Flooding Potential.List of Attendees & Viewgraphs Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20062J7361980-10-20020 October 1980 Summary of 800930 Meeting W/Util & Westinghouse Re Lab Examination Results for Steam Generator Row 1 U-bend Tube Samples Removed from Plant ML20125C1751979-12-19019 December 1979 Summary of 791205-06 Meeting W/Util & Bechtel Re Discussion of LER 79-15 Wherein Certain Problems W/Masonry Block Walls & Support Reactions of Equipment/Piping Attached Thereto Were Identified ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-01-13
[Table view] |
Text
,
\
2 5 JUN IW Docket No.: 50-344' LICENSEE: Portland General Electric Company (PGE)
FACILITY: Trojan Nuclear Plant
SUBJECT:
MEETING
SUMMARY
REGARDING THE MARCH 17-18, 1987 MEETING ON THE SAFETY PARAMETER DISPLAY SYSTEM (SPDS) AND DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)
A meeting was held at the Trojan site on March 17, 1987 with PGE to discuss the completion status of the DCRDR. On March 18, 1987, discussions focused on the implementation status of the SPDS. An in-plant demonstration of the SPDS was conducted following formal discussions of the SPDS. A list of atten-dees is provided in the Enclosure.
The DCRDR discussions centered on certain human engineering deficiencies (HEDs) whose resolution required additional information and/or in-plant verification, i The following HEDs were resolved based on discussions and verification: I 65 296 445 87 321 131 156 387 132 238 4I0 133 250 440 368 The acceptability of each of the above listed HEDs will be discussed in detail in the Safety Evaluation regarding the DCRDR, which will be issued by this office at a later date. PGE also agreed to submit clarification regarding i the following HEDs: l 250 - will the new C-160 panel alleviate the staff's concern l regarding the availability of a diesel generator tacho-meter.
l 410 - PGE needs to better define PGE actions regarding the West-inghouse Owners Group Trip Reduction and Assessment Program (WOG-TRAP) and commit to a completion date.
The NRC also requested additional information regarding operator training j associated with changes to the control room due to HED corrections. The staff was concerned that the training, as discussed in PGE's previous submittals was not adequate to ensure resolution of the HEDs, and to ensure that the proposed a training actually corrects HEDs and does not result in new HEDs. PGE agreed to provide additional information in this area. PGE also agreed to provide a revised response to HED 403 since the means of resolving this HED was in transition.
l 87070.10453 870625 PDR P
ADOCK 05000344 PDR I
Regarding the implementation schedule for those HEDs requiring corrective actions, it has been the staff's position that all HEDs which need corrections, have corrective actions implemented within two refueling outages from the date of the submittal of the Summary Report (PGE submitted its Summary Report in December 1984). This time interval was based on an average operating cycle of approximately 18 months.
Trojan has many HEDs which have anticipated completion dates of September 30, 1989. Owing to the difference that Trojan's operating cycle is based on annual refuelings, and that the preponderance of HEDs were related to the annunciator upgrade effort (to be completed by September 1989), the staff considered the September 1989 proposed completion date to be capable of accommodating unexpected delays, and thus, reasonable.
With respect to the SPDS, the conpletion and resolution of the following HEDs were verified thrcugh discussiorcs and/or inspection:
448 454 459 465 470 449 455 460 466 471 450 456 461 467 472 451 457 462 468 453 458 464 469 The acceptability of each of the above SPDS related HEDs will also be discussed in the Safety Evaluation regarding the DCRDR.
Interviews conducted with control reowi operators indicated general satisfac-tion with the SPDS. It w6s expressed that the " trending" feature of the SPDS was the one most often used, with the required iconic display to be the one of least benefit, and least used.
orginal M N Terence L. Chan, Project Manager Project Directorate V l
Division of Reactor Projects - III, '
IV, Y and Special Projects l
1 l
DRSP/PD5 DF4 IPD5
, Gy , don )
TCha[n 06/j /87 C6/g6/87 0FFICIAL RECORD COPY l
Mr. David W. Cockfield Portland General Electric Company Trojan Nuclear Plant CC:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helent, Oregon 97501 Mr. David Kish Gregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210
- Walnut Creek, California 94596 l
l
.g s
I
. Enclosure LIST OF ATTENDEES l
MARCH 17-18, 1987 i i
DCRDR AND SPDS MEETING !
i 1
ATTENDEES ORGANIZATION T. Chan NRC i
S. Saba NRC G. Zimmerman PGE D. Pearson PGE R. Russell PGE l
\
- Attended SPDS meeting only
- Attended DCRDR meeting only i
1 I
i
i L
I DISTRIBUTION I
l
' Docket. File j
NRC & Local PDRs i PD #5 Reading I GWKnighton TChan 0GC-Bethesda EJordan JPartlow 3
{
NRC Participants '
ACRS (10)
HBClayton (R-1)
T0 Martin }
$5aba MMendonca, (R-V)
RBarr 3 l
1 i