ML20195B566

From kanterella
Revision as of 07:41, 14 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Problem Re Emergency Diesel Generator Inability to Perform Design Basis Functions
ML20195B566
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1988
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
FLORIDA POWER CORP.
Shared Package
ML20195B560 List:
References
EA-88-034, EA-88-34, NUDOCS 8811020076
Download: ML20195B566 (6)


Text