Comment on Draft GL Re Testing of safety-related Circuits. Util Primary Concern W/Requested Actions of Proposed GL Is Schedule
ML20087B309
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/18/1995
From: Beard P
FLORIDA POWER CORP.
To:
NRC
References
FRN-60FR27141 60FR27141-00004, 60FR27141-4, NL-95-0061, NL-95-61, NUDOCS 9508080002
Download: ML20087B309 (2)


Text

u b309 N57 M i 1 3.Gd cres 5 - h- 95 w -

g g

': .'" ? ! I;i 3: 23 g,, . , ,; i u 3: 23

, , Lg

~'

CLL 3

~ '

Florida Power CORPORATION July 18, 1995 NL95-0061 Chief, Rules Review and Directives Branch U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Comments on NRC Generic Letter 95-XX: Testing of Safety Related Circuits

Dear Sir:

Flori,da Power Corporation (FPC) provides the following as our comments on the subject proposed Generic Letter.

FPC's primary concern with the requested actions of the proposed Generic letter is the schedule. Crystal River 3 (CR-3) has the potential to be very adversely affected depending on the issue date of the document. Requested Action 1 should not be linked to any refueling or maintenance outage. This review can be completed during normal plant operation. In addition, this review involves a very significant manpower commitment. In order to allow orderly planning and execution of this activity the NRC should allow at least a year following issuance of the Generic Letter. As noted in the Discussion section of the Generic letter, surveillance inadequacies have not resulted in the unavailability of safety systems when called on during an event. Thus, no immediate safety concern exists.

Allowing additional time for completion of the effort has an additional benefit to both nuclear safety and the utilities. If utility personnel are utilized for performance of the re /iew they will learn a great deal about the systems under review. This will make them much more effective in maintaining these systems in the future and should reduce system unavailability during plant operation.

Allowing additional time will also reduce costs FPC estimates that if a short schedule requiring the services of contractors is imposed, the cost of the review will be upwards of $1,000,000. This number will be significantly reduced if suf f icient time is allowed for allocation of existing resources.

The schedule for completion of Requested Action 2 also does not need to be linked to a refueling or maintenance outage; however, the completion of any additional testing required as a result of the review will likely need to be scheduled in CRYSTAL HIVm ENEnGY COMPLEX e 15760 W. Power une Sucet . Crystat Hiver . Florida 344284708 e fJO4) 79564"fi

~

9500080002 950728 P'OR F-ADOC K 05000307 Prp k

o, L i

n j U. S. Nuclear Regulatory Commission NL95-0061 Page 2 ,

conjunction with an outage. This could be handled on a case by case basis with the licensees after the specifics of the situation are known.  !

Additionally, FPC believes a discussion of how the NRC expects licensees to deal with operability issues when testing deficiencies are discovered should be included. Since most of the review effort will likely be conducted while the ,

plant is in operation and since there is a potential for testing deficiencies to  !

be applicable to multiple channels or trains, a predetermined conclusion that the effected components are inoperable would result in a plant shutdown. This would constitute a greater risk than that from the potential problems associated with untested components. Many licensees may consider the risk of plant shutdown to be sufficiently high to only perform the reviews during plant outages. A more  ;

reasonable response to these testing deficiencies should be proposed in the Generic Letter.  ;

i We appreciate the opportunity to comment on the proposed Generic Letter. We recognize that a request to verify compliance with current requirements is a  !

legitimate request. We wish to emphasize, however, the magnitude of this request l and the potential adverse impact it can have on utility resources. Adequate time I for planning, scheduling, and implementing these activities is crucial to their  :

successful completion.  ;

Sincerely,

. M. Beard, Jr.

Senior Vice President Nuclear Operations PMB:AEF xc: Regional Administrator, Region II Senior Resident Inspector '