(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217C1311999-10-0808 October 1999 Safety Evaluation Supporting Amend 153 to License DPR-3 ML20211J3361999-08-27027 August 1999 Safety Evaluation Supporting Amend 152 to License DPR-3 ML20207F9491999-03-0505 March 1999 Safety Evaluation Supporting Amend 151 to License DPR-3 ML20202H5871999-02-0303 February 1999 Safety Evaluation Supporting Amend 150 to License DPR-3 ML20249A7901998-06-17017 June 1998 Safety Evaluation Supporting Amend 149 to License DPR-3 ML20237F1671993-02-19019 February 1993 Safety Evaluation Supporting Amend 147 to License DPR-3 ML20058F2201990-11-0202 November 1990 Safety Evaluation Accepting Util Response to Generic Ltr 83-28 Re post-trip Review - Data & Info Capability ML20058C4061990-10-22022 October 1990 Safety Evaluation Supporting Amend 137 to License DPR-3 ML20059G2411990-09-0606 September 1990 Safety Evaluation Supporting Amend 135 to License DPR-3 ML20058L6651990-08-0202 August 1990 Safety Evaluation Supporting Amend 134 to License DPR-3 ML20058L0321990-08-0202 August 1990 Safety Evaluation Supporting Amend 133 to License DPR-3 ML20055C8601990-06-18018 June 1990 Safety Evaluation Supporting Amend 132 to License DPR-3 ML20248H7391989-10-0303 October 1989 Safety Evaluation Not Accepting Procedure Generating Program for Plant.Program Should Be Revised to Reflect Items Described in Section 2 of Rept.Revision Need Not Be Submitted to NRC ML20247F1431989-09-0707 September 1989 Safety Evaluation Supporting Amend 124 to License DPR-3 ML20247E6831989-08-31031 August 1989 Safety Evaluation Supporting Amend 123 to License DPR-3 ML20246F2771989-07-11011 July 1989 Safety Evaluation Supporting Mods to ECCS Evaluation Model, Including Changes to FLECHT-based Reflood Heat Transfer Correlation,Steam Cooling Model & post-critical Heat Flux Heat Transfer Model ML20195D6701988-11-0101 November 1988 Safety Evaluation Supporting Amend 120 to License DPR-3 ML20205G1961988-10-25025 October 1988 Safety Evaluation Supporting Amend 119 to License DPR-3 ML20204G4871988-10-17017 October 1988 Safety Evaluation Supporting Amend 118 to License DPR-3 ML20205C4061988-10-14014 October 1988 Safety Evaluation Supporting Amend 117 to License DPR-3 ML20207L7051988-10-12012 October 1988 Safety Evaluation Supporting Amend 116 to License DPR-3 ML20207E8151988-08-0505 August 1988 Safety Evaluation Supporting Amend 115 to License DPR-3 ML20151M4911988-07-29029 July 1988 Safety Evaluation Supporting Amend 114 to License DPR-3 ML20151K3801988-07-25025 July 1988 Safety Evaluation Supporting Amend 113 to License DPR-3 ML20151K8571988-07-19019 July 1988 Safety Evaluation Supporting Amend 112 to License DPR-3 ML20153A8661988-06-29029 June 1988 Safety Evaluation Accepting Util Proposed Reflood Steam Cooling Model ML20196K2741988-06-28028 June 1988 Safety Evaluation Supporting Amend 111 to License DPR-3 ML20195K1501988-06-17017 June 1988 Safety Evaluation Supporting Amend 110 to License DPR-3 ML20195C5851988-06-13013 June 1988 Safety Evaluation Supporting Amend 109 to License DPR-3 ML20155K5141988-06-0909 June 1988 Safety Evaluation Supporting Amend 108 to License DPR-3 ML20154J7661988-05-18018 May 1988 Safety Evaluation Supporting Amend 107 to License DPR-3 ML20216J4081987-06-26026 June 1987 Safety Evaluation Supporting Amend 106 to License DPR-3 ML20216C1111987-06-18018 June 1987 Safety Evaluation Granting Three of Seven Requests Submitted by Util for Relief from Inservice Insp & Testing Requirements.Four Requests Withdrawn,Per 870122,0410 & 0507 Ltrs ML20215C5881987-06-0404 June 1987 Safety Evaluation Supporting Util 860505,870402,& 0506 Submittals Re Seismic Reevaluation of Plant.Concludes That Foundation Soils Under Reactor & Under Vapor Container Have Adequate Strength to Support Seismic Load from Earthquake NUREG-0825, Safety Evaluation Supporting Util 840709,1231 & 851024 Repts Re Evaluation of Plant for Wind & Tornado Events as Requested in Integrated Plant Safety Assessment Rept, Sections 4.5 & 4.8.Risk from Wind/Tornado Events Assessed1987-05-13013 May 1987 Safety Evaluation Supporting Util 840709,1231 & 851024 Repts Re Evaluation of Plant for Wind & Tornado Events as Requested in Integrated Plant Safety Assessment Rept, Sections 4.5 & 4.8.Risk from Wind/Tornado Events Assessed ML20213G9161987-05-13013 May 1987 Safety Evaluation Supporting Amend 105 to License DPR-3 ML20213D9671987-05-0707 May 1987 Safety Evaluation Supporting Amend 104 to License DPR-3 ML20207S6231987-03-10010 March 1987 Safety Evaluation Supporting Util 860122,0812,1028 & 870204 Submittals Re Fracture Toughness Requirements for Protection Against PTS Events ML20211N5881987-02-19019 February 1987 Safety Evaluation Re First Level Undervoltage Protection Testing.Testing Unnecessary ML20211L3951987-02-17017 February 1987 Safety Evaluation Supporting Amend 103 to License DPR-3 Re Max Nominal Enrichment of Fuel ML20207N8811987-01-0707 January 1987 Safety Evaluation Supporting Amend 102 to License DPR-3 ML20207N4261987-01-0606 January 1987 Safety Evaluation Supporting Amend 101 to License DPR-3 ML20207J9451986-12-30030 December 1986 SER Accepting Util 831105 & 850709 Responses to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Program - Reactor Trip Sys Components ML20215E1201986-12-0909 December 1986 Safety Evaluation Supporting Util 830419 & 0830,840119, 851022 & 860930 Responses Re Conformance to Reg Guide 1.97. Plant Design Acceptable W/Exception of Neutron Flux Variable ML20214X3391986-12-0101 December 1986 Safety Evaluation Supporting Amend 100 to License DPR-3 ML20214J8521986-11-18018 November 1986 Sser Accepting SPDS Contingent Upon Resolution of Concerns Re Maint & Improvement of Placement & Visual Access of Containment Isolation Panel & Minor Human Factors Engineering Concerns ML20215E6471986-10-0202 October 1986 Safety Evaluation Supporting Util Requests for Exemption from Specific Requirements in App R to 10CFR50.Existing Fire Protection Provides Level of Protection Equivalent to Technical Requirements of App R ML20210S1791986-09-23023 September 1986 Safety Evaluation Supporting Amend 99 to License DPR-3 ML20212Q1151986-08-27027 August 1986 Safety Evaluation Supporting Util 830412 Proposal to Provide Integrated Safe Shutdown Sys Which Could Be Used for Safe Shutdown in Event of Fire at Facility ML20212N0161986-08-20020 August 1986 Safety Evaluation Supporting Amend 98 to License DPR-3 1999-08-27
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217C1311999-10-0808 October 1999 Safety Evaluation Supporting Amend 153 to License DPR-3 ML20211J5111999-08-31031 August 1999 Rev 29 to Yankee Decommissioning QA Program ML20211J3361999-08-27027 August 1999 Safety Evaluation Supporting Amend 152 to License DPR-3 ML20209D5391999-06-22022 June 1999 Rev 29 to Yaec Decommissioning QA Program ML20207F9491999-03-0505 March 1999 Safety Evaluation Supporting Amend 151 to License DPR-3 ML20202H5871999-02-0303 February 1999 Safety Evaluation Supporting Amend 150 to License DPR-3 ML20154P9691998-10-16016 October 1998 Rev 28 to Yankee Atomic Electric Co Decommissioning QA Program ML20249A7901998-06-17017 June 1998 Safety Evaluation Supporting Amend 149 to License DPR-3 ML20216C4581998-02-27027 February 1998 Response to NRC Demand for Info (NRC OI Rept 1-95-050) ML20203L1931998-02-25025 February 1998 Duke Energy Corp,Duke Engineering & Svcs,Inc,Yankee Atomic Small Break LOCA Technical Review Rept ML20203L2451998-02-23023 February 1998 Assessment Rept of Engineering & Technical Work Process Utilized at De&S Bolton Ofc ML20203L1621998-02-18018 February 1998 Rept of Root Cause Assessment Review ML20203L2691998-02-16016 February 1998 Duke Engineering & Svcs Assessment Process Review Rept ML20199B4601998-01-20020 January 1998 Special Rept:On 980105,meteorological Monnitoring Instrumentation for Air Temp Delta T Inoperable for More than 7 Days.Caused by Breakdown in Wiring Between Junction Box at 199 Foot Level.Wiring Replaced ML20203J3001997-12-31031 December 1997 Ynps 1997 Annual Rept ML20217N0981997-08-21021 August 1997 LER 97-S02-00:on 970725,discovered Uncontrolled Safeguards Documents.Caused by Personnel Error.Matls Retrieved & Stored in Safeguards Repositories ML20210H0991997-08-0707 August 1997 LER 97-S01-00:on 970709,potential Compromise of Safeguards Info Occurred.Caused by Human error.Stand-alone Personal Computer & Printer Not Connected to Network,Have Been Located within Text Graphics Svc Dept ML20149K7781997-07-24024 July 1997 Special Rept:On 970520 & 0714,air Temp Delta T Channel Indicated Temp Difference Between Top & Bottom of Meteorological Tower.Caused by Reversed Input Wiring to Channel.Restored Air Temp Delta T Channel Operability ML20141E4671997-05-30030 May 1997 Rev 28 to Operational QA Program ML20135C8461996-12-31031 December 1996 Yankee Nuclear Power Station 1996 Annual Rept ML20132G6771996-12-20020 December 1996 Rev 27 to YOQAP-I-A, Operational QA Program ML20058N4771993-12-20020 December 1993 Rev 0.0 to Yankee Nuclear Power Station Decommissioning Plan ML20059K8491993-12-15015 December 1993 Clarifications to Pages 2,41,43 & 44 of 44 in Section I, Organization of YOQAP-I-A,Rev 24, Operational QA Program ML20059C5011993-10-29029 October 1993 Special Rept:On 931019,meteorological Instrumentation Channel for Delta T Declared Inoperable.Caused by Ceased Aspirator Motor Located at Top of Tower.Motor Replaced ML20056H1741993-06-10010 June 1993 Preliminary Assessment of Potential Human Exposures to Routine Tritium Emissions from Yankee Atomic Electric Co Nuclear Power Facility Located Near Rowe,Ma ML20237F1671993-02-19019 February 1993 Safety Evaluation Supporting Amend 147 to License DPR-3 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20198D2481992-05-13013 May 1992 Yankee Nuclear Power Station Certified Fuel Handler Initial Certification Program ML20198D2541992-05-13013 May 1992 Yankee Nuclear Power Station Certified Fuel Handler Recertification Program ML20062H1981990-11-30030 November 1990 Plant Specific Fast Neutron Exposure Evaluations for First 20 Operating Fuel Cycles of Yankee Rowe Reactor ML20058H2841990-11-0303 November 1990 Special Rept:On 901101,control Rod 24 Found Disconnected from Drive Shaft.Drive Shaft Latching Will Be Initiated ML20058F2201990-11-0202 November 1990 Safety Evaluation Accepting Util Response to Generic Ltr 83-28 Re post-trip Review - Data & Info Capability ML20062E8331990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Yankee Atomic Power Station ML20058G1471990-10-31031 October 1990 Vol 2 to Star Methodology Application for PWRs Control Rod Ejection Main Steam Line Break ML20058C4061990-10-22022 October 1990 Safety Evaluation Supporting Amend 137 to License DPR-3 ML20062B6751990-09-30030 September 1990 Monthly Operating Rept for Yankee Atomic Power Station for Sept 1990 ML20059G2411990-09-0606 September 1990 Safety Evaluation Supporting Amend 135 to License DPR-3 ML20059E3071990-08-31031 August 1990 Safety Assessment of Yaec 1735, Reactor Pressure Vessel Evaluation Rept for Yankee Nuclear Power Station. Detailed Plan of Action W/Listed Elements Requested within 60 Days After Restart to Demonstrate Ability to Operate Longer ML20059E8001990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Yankee Atomic Power Station ML20058P7841990-08-14014 August 1990 Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil ML20058N6581990-08-13013 August 1990 Special Rept Re Diesel Fire Pump & Tank Inoperable for Greater than Seven Days for Draining,Cleaning & Insp.During Period Redundant Pumping Capacity Available Via Two Remaining Electric Driven Fire Pumps ML20058L0321990-08-0202 August 1990 Safety Evaluation Supporting Amend 133 to License DPR-3 ML20058L6651990-08-0202 August 1990 Safety Evaluation Supporting Amend 134 to License DPR-3 ML20056A1961990-08-0101 August 1990 Special Rept:Two Fire Pumps Inoperable at Same Time.Caused by Necessity to Accomplish Surveillance to Verify Capability to Start Pump on Emergency Diesel Generator 3 & Planned 18-month Insp of Diesel Per Tech Specs ML20055E1591990-07-31031 July 1990 Reactor Pressure Vessel Evaluation Rept ML20055G7011990-07-31031 July 1990 Yankee Nuclear Power Station Core 21 Performance Analysis ML20055G6801990-07-31031 July 1990 Yankee Plant Small Break LOCA Analysis ML20055J3221990-07-25025 July 1990 Decommissioning Funding Assurance Rept & Certification ML20055G7051990-07-19019 July 1990 Rev 0 to Yankee Cycle 21 Core Operating Limits Rept ML20055F6751990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Yankee Atomic Power Station 1999-08-31
[Table view] |
Text
( UNITED STATES NUCLEAR REGULATORY COsiMISSION W ASHINGTON, D. C. 2055s SAFETY E ALUATION BY THE OFFICE OF NUCLEAR REACTOR, REGULATION SUPPORTING AMENDStENT NO. 20 TO FACILITY OPERATING LICENSE DPR-3 (CHANGE NO.125 TO THE TECHNICAL SPECIFICATIONS)
YANKEE ATm!IC ELECTRIC C05fPANY YANKEE NUCLEAR PONER STATION (YANKEE-RONE)
DOCKET NO. 50-29 s ;;;;
Introduction By application dated October 28, 1975, Yankee Atomic Electric Company (the licensee) proposed changes that involve the replacement of descriptive page 213:9 in Section 213 " Reactor Control System" of the Final Hazards Summary Report which is incorporated i.n the Technical Specifications appended to Licenso No. DPR-3 for the Yankee-Rowe reactor, One change would allow the replacement of the tungsten filamert incandescent bulbs used for primary control rod position indi:ation with light emitting diodes (LEDs). The other change would correct the description of the secondary rod position indicating sc'ieme to reficct the previously approved controls of Yankee-Rowe wi th four instead of six rod groups.
Evaluation The primary red position indicating system at Yankee-Rowe provides column-type light indication of the position of each of the 24 control rods. Presently, this system includes tungsten filament incandescent bulbs mounted in vertical columns (30 bulbs for each control rod) on the control board. As a control rod is withdrawn from or inserted into the core the indicating bulbs associated with this control rod are caused to light up, giving position indication within an accuracy of
+3 inches. The licensee has reported in their October 28, 1973 sub-mittal that the sockets for the incandescent bulbs have deteriofated such that they no longer allow reliable operation of the bulbs. Furth(r, the increase of the failure rate requires replacement of bulbs at frequent intervals. For these reasons, the licensee proposes to replace all tungsten filament incandescent bulbs with light emitting diodes (LEDs) .
The licensee informed us that the light indication of the LEDs will provide more uniform brightness than that obtained from the incandescent bulbs.
We find that use of the LEDs for rod position indication does not involve 8 012 o a o 7 P.s. .
changes to the existing rod position indicating schemeu tha,t,the rod position indication with the LEDs will be at least as reliable as presently obtained from the incandescent bulbs. We therefore conclude that the proposed replacement of the tungsten filament incandescent bulbs with LEDs is acceptable.
The proposed replacement of page 213:9 of Section 213 would also revise the _
description of the secondary roG position indicating system. This system gives an indication of each rod group position. Our previous Change No.
57 (issued July 30, 1964) approved operation of Yankee-Rowe with Core IV and all succeeding cores with the 24 control rods controlled in four rod groups, instead of six rod groups. This also resulted in the acceptable change of the secondary rod position indicating system involving the use -
of one self-synchronous transmitter, one self-synchronous receiver und one digital readout indicator for each of the four rod groups instead for six rod groups. The proposed replacement of page 213:9 corrects the description of the recondary rod position indication to reflect the use of this system for the previously approved four rod group control. This change does not involve an unreviewed safety question and is acceptable.
Conclusion We have concluded, based on the considerations discussed above, that:
(1) because the change does not involve a significant increase in the probability or consequences of accidents previously considered and does not involve a significant decrease in a safety nargin, the change does I-not involve a significant hatards consideration, (2) there is reasonable j-assurance that the health and safety of the public will not be endangered '
by operation in the proposed manner, and (3) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
l cate: NOV 191975