Proposed Tech Spec Table 3.3.7.9-1, Fire Detection Instrumentation, Adding New Fire Detector Locations to Units 1 & 2
ML20154L112
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/04/1986
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20154L051 List:
References
NUDOCS 8603110394
Download: ML20154L112 (8)


Text

.

ATT A CH M E h>T A TABLE 3.3.7.9-1 (Continued)

~

FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENT'S OPERABLE

  • HEAT FLAME SMOKE Unit 1 Fire Detection Instrumentation (Continued) .
14. Reactor Bldg./ Containment
a. Refuel Floor, Zone 1-26 6 E1. 843'6", Fire Hazard Zone Area 1 Reactor B1dg. East, Zone 1-24 11 b.

E1. 820'6", Fire Hazard Zone 281 Reactor Bldg. West, Zone 1-23 9 c.

E1. 820'6", Fire Hazard Zone 2B2 Reactor Bldg. South, Zone 1-36 18 d.

E1. 786'6", Fire Hazard Zone 2D ~

Reactor Bldg. North, Zone 1-37 17 e.

E1. 786'6", Fire Hazard Zone 20 Reactor Bldg. South, Zone 1-34 22 f.

E1. 761', Fire Hazard Zone 2E Reactor Bldg. North, Zone 1-35 18 g.

El. 761', Fire Hazard Zone 2E -

Containment, Zone 1-16P 7

[ h.

E1. 761' and 777', Fire Hazard Zone 2J 9 -

1. Containment Zone 1-16 E1. 740' and 749', Fire Hazard Zone 2J 5
j. Reactor Bldg., Zone 1-17 E1. 740', Fire Hazard Zone 2F Reactor Bldg. North, Zone 1-17P 11 i k.

El. 740', Fire Hazard Zone 2F Reactor Bldg. SW, Zone 1-22 4 1.

E1. 710'6", Fire Hazard Zone 2G Reactor Bldg. NW, Zone 1-22P 6 m.

E1. 710'6", Fire Hazard Zone 2G l

Reactor Bldg. South, Zone 1-32 17 n.

E1. 694', Fire Hazard Zones 2H1, 2H2, 2H3

~

Reactor Bldg. North, Zone 1-33 20 o.

El. 694', Fire Hazard Zones 2H1, 2H4, 2HS Reactor Bldg. South, Zone 1-30 19 i p.

E1. 673', Fire Hazard Zones 211, 212, 213 Reactor Bldg. North, Zone 1-31 20 q.

El. 673', Fire Hazard Zones 2II, 214, 215 ,

r. Tag,- r:Ih. ufest , teue, l- 4 c E

E l. BC7 NF .'re. Hawd %:us 2C LA SALLE - UNIT 1 3/4 3-77 P _

TABLE 3.3.7.9-1 (Continued)

FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE

  • HEAT FLAME SMOKE Unit 1 Fire Detection Instrumentation (Continued)
15. Auxiliary Building / Turbine Bldg
a. Aux. Bldg. Vent Floor, Zone 1-1 2 E1. 815', Fire Hazard Zone 4A
b. Aux. B1dg. Vent Floor, Zone 1-2 8

. E1. 786'6", Fire Hazard Zone 4B

c. Control Room, Zone 1-5 15 El. 768', Fire Hazard Zone 4C1
d. Computer Room, Zone 1-6 - 8 E1. 768', Fire Hazard Zone 4C4
e. Reactor Prot. M-G Set Room, Zone 1-12 12 E1. 749', Fire Hazard Zone 4D3
f. Cable Sp' reading Area, Zone 1-18 15 E1. 749', Fire Hazard Zone SA4
g. Div. 2 SWGR Room, Zone 1-8 15 E1. 731', Fire Hazard Zone 4E3 , _j
h. Aux. Electric Equipment Room, Zone 1-27 13

. E1. 731', Fire Hazard Zone 4E1

1. Aux. Bldg. Corridor, Zone 1-3 5 -

E1. 731', Fire Hazard Zone 5B13

j. Aux. Bldg. Corridor, Zone.1-7 12 E1. 731', Fire Hazard Zone 5B13

^

k. Div. 1 SWGR Room, Zone 1-9 -

17 E1. 710'6", Fire Hazard Zone 4F1 -

1. Aux. Bldg. Corridor, Zone 1-4 9 E1. 710'6", Fire Hazard Zone SC11
m. Div. 3 SWGR Room, Zone 1-10 5

,ynet El. 687', Fire Hazard Zone 501 Athu}SA __ ,,16. DG Bldg./DG Bldg. Corridor

a. DG Bldg., Zone 1-29 17 E1. 736'6", Fire Hazard Zones 7A1, 7A2, 7A3
b. DG Bldg. Corridor, Zone 1-25 3 El. 710'6", Fire Hazard Zone SC11
c. DG Bldg., Zone 1-28 15 E1. 674', Fire Hazard Zones 7C4, 7CS, 7C6 s

. LA SALLE - UNIT 1 3/4 3-78

  • 2nsur roe rass ,

3/4 3-78

v. Aux . Sids. , 2.aue I-33 E l. T h y' C.f, p;,., y, ;,4 2,ae q cg, 30
c. Av1. s\d I-38 28.

GG340g., zoneHagard 2ane

, Fire foe B 9

I 9

0 De

  • O 1

.'. i . ..

4 .

INSTRUMENTATION FIRE DETECTION ' INSTRUMENTATION

' LIMITING CONDITION FOR OPERATION

[,

3.3.7.9 As a minimum, the fire detection instrumentation for each fire -

detection zone of Unit 1 and Unit .2 shown in Table 3.3.7.9-1 shall be OPERABLE.* .

APPLICABILITY: Whenever equipment protected by the fire detection inst ument

' is requirea to be OPERABLE. -

ACTION: . .

With the number of OPERABLE fire detection instruments less than the Minimum Instruments OPERABLE requirement of Table-3.3.7.9-1: .

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at-least once per hour, unless the instrument (s) is located inside the primary containment, then inspect the primary containment at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the containment air temperature at least once per hour at the locations listed in Specification 4.6.1.7.
b. Restore the minimum mber of instruments to OPERABLE status within

' [D

^

14 days or, prepare an submit a Special Report to the Commission pursuant to Specificatio 6.6.C within 30 days outlining the action .

taken, the cause of the in etability and the plans and schedule for .{,

restoring the instrument (s)

I -

OPERABLE status.

b ,

JJ The provisions of Specifica,tions 3.0.3 and 3.0.4 are not applicable. f-SURVEILLANCE REOUIREMENTS _

. 4.3.7.9.1 Each of the above required fire detection instruments which are accessible during unit operation shall be demonstrated ODERABLE at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors l which are not accanible during unit operation shall be demonstrated OPERABLE i by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUT 00WN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.,

4.3.7.9.2 The NFPA Standard 720 supervised circuits supervision associated

  • with the detector alarms of each of the above required fire detection instruments shall be demons'trated OPERABLE at least once per 6 months. Super-

- vised circuits with detectors which are inassessible during unit operation

! shall be demonstrated OPERABLE during each COLD SHUTOOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.

3 . .

"Tne normal or emergency power source may be inoperable in OPERATICHAL CONDITION 4 or 5 or when defueled.

1 .

. LA SALLE - UNIT 1 3/4 3-75 Amendment No. 23 s

e

.-- ~ , ,_---4 --,---.,y-- .,,m.,---.y--. ,n_ _ , - - - - - _ _ _ - _ _ - . . _ . -,------x-

~~

a . ,

. INSTRUMENTATION ,

FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 4

3.3.7.9 As a minimum, the fire detection instrumentation for each fire

!, detection zone of Unit I and Unit 2 shown in Table 3.3.7.9-1 shall be OPERABLE.*

APPLICABILITY:- Whenever equipment protected by the fire detection instrument is required to be OPERABLE. '

ACTION: .

With the number of' OPERABLE fire detection instruments less than the Minimum Instruments OPERABLE requirement of Table 3.3.7.9-1:

a. Within I hour, establish a fire watch patrol to inspect the zone (s)
i. with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the primary containment, then inspect the primary containment at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the ,

containment air temperature at least once per hour at the locations

listed in Specification 4.6.1.7.
b. Restore the minimum n ber of instruments to OPERABLE status within
14 days or, prepare and ubmit a Special Report to the Commission lM pursuant to Specificatio .6.C within 30 days outlining the action l#

. taken, the cause of the in erability and the plans and schedule for restoring the instrument (s) OPERA 8LE status. -

g -

p The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REOUIREMENTS 4.3.7.9.1 Each of the above required fire detection instruments which are *

- accessible during unit operation shall be demonstrated OPERABLE at least once per 5 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors

- which are not accessible during unit operation shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUTOOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.,

i '

4.3 7.9.2 The NFPA Standard 72D supervised circuits supervision associated with the detector alarms of each of the above required fire detection instruments shall be demonstrated CPERABLE at least once per 6' months. Super-

, vised circuits with detectors which are inaccessible during unit operation shall

! be demonstrated OPERABLE during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the, previous 6 months.,

! "The normal or emergency power source may be inoper:able in OPERATIONAL

~

CONDITION 4 or 5 or when defueled.

LA SALLE - UNIT 2 3/4 3-75 Amendment No.ll 1

-m --, . .,m-- _ _ . , _ . , _ . - - , .- , , _ - , _ _ _ _ . _ - . _, _ , _ _ . _ _ , . _ _ _ _ . _ _ . _ _ - . - _ _ _ . . _ . -

4 yQ C HAN WS p(l 56)i"C(AltVT]UA}O-

. TABLE 3.3.7.9-1 (Continued) .

FIRE DETECTION INSTRUMENTATION INSTRtJMENT LOCATION MINIMUM INSTRUNENTS OPERABLE" HEAT Ft.AME SMcKE

~

  • Unit 2 Fire Detection Instrumentation (Continued)' ,
14. Reactor 81dg./ Containment
a. Refuel Floor, Zone 2-25 6 E1. 843'6", Fire Hazard Zone Area 1
b. Reactor 81dg. East, Zone 2-24 11 E1. 820'6", Fire Hazard Zone 381
c. Reactor Bldg. West, Zone 2-23 ,9 E1. 820'6", Fire Hazard Zone 382 ~
d. Reactor 81dg. South, Zone 2-36 19

, E1. 786'6", Fire Hazard Zone 30 - . , .

e. Reactor 81dg. North, Zone 2-37 17 E1. 786'6", Fire Hazard Zone 30
f. Reactor 8?dg. South, Zone 2-34 23 E1. 761', Fire Hazard Zone 3E
g. Reactor 81dg. North,7 Zone 2-35 18 E1. 761', Fire Hazard Zone 3E
h. ' Containment, Zone 2-16P 7 E1. 761' and 777', Fire Hazard Zone 3J -
1. Containment, Zone 2-16 9 E1. 740' and 749', Fire Hazard Zone 3J
j. 'eactor 81dg., Zone 2-17 5

E1. 740', Fire Hazard Zone 3F

k. Reactor Bldg. North, Zone 2-17P 11 E1. 740', Fire Hazard Zone 3F
1. Reactor 81dg. SW, Zone 2-22 4 - -

E1. 710'6", Fire Hazard Zone 3G Reactor Bldg. NW, Zone 2-22P 6 -

m.

. E1. 710'6", Fire Hazard Zone 3G

n. Reactor 81dg. South, Zone 2-32 17 E1. 694', Fire Hazard Zones 3H1, 3H2, 3H3
o. Reactor 81dg. North, Zone 2-33 ,

20 E1. 694', Fire Hazard. Zones 3H1, 3H4, 3H5 ,

p. Reactor Bldg. South, Zone 2-30 19 E1. 673', Fire Hazard Zones 3II, 3I2, 313
q. Reactor 81dg. North, Zone 2-31 20 i, E1. 673', Fire Hazard Zones.3II, 3I4, 315 m.

- r. Reactor 81dg. West Zone 2-40 7 E1. 807',.Ftre Hazard Zone 3C LA SALLE - UNIT 2 3/4 3-77

r.,

UD C#eWS . . . .

Pc ,2. '.rW,=c a:om A Tsu.J OuLV

~

TABLE 3.3.7.9-1 (Continued) .

FIRE DETECTION INSTRUMENTATION

. . INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE" HEAT Ft.AME SMaxE Unit 2 Fire Detection Instrumentation (Continued)

15. Auxiliary Building / Turbine Bldg .
a. Aux. B1dg. Vent Floor, Zor 4 2-1 5

. El. 815', Fire Hazard Zone 4A

b. Aux. 81dg. Vent Floor, Zone 2-2 9 E1. 786'6", Fire Hazard Zone 48
c. Control Room, Zone 2-5 17 E1. 768', Fire Hazard Zone 4C1 -
d. ' Record Room Zone 2-6 3 E1. 768', Fire Hazard Zone 4C5
e. Reactor Prot. M-G Set Roca, Zone 2-12 12 E1. 749', Fire Hazard Zone 404
f. Cable Spreading Area, Zone 2-18 13 E1. 749', Fire Hazard Zone 5A4
g. Div.'2 SWGR Roos, Zone 2-8 15 E1. 731', Fire Hazard Zone 4E4 Aux. Electric Equipment Roos, Zone 2-27 12 h.

E1. 731', Fire Hazard Zone 4E2 ,

1. Au. Bldg. Corridor, Zone 2-3 5 E1. 731', Fire Hazard Zone 5813
j. Aux. 81dg. Corridor, Zone 2-7 12 E1. 731', Fire Hazard Zone 5813
k. Div.1 SWGR Room, Zone 2-9 17 E1. 710'6, Fire Hazard Zone 4F2 - .

l '

Aux. 81dg. Corridor, Zone 2-4 9 1.

E1. 710'6", Fire Hazard Zone 5C11 Div. 3 SWGR Room, Zone 2-10 5 l

m.

i E1. 687', Fire Hazard Zone 502

n. Aux. 81dg., Zone 2-3? 10 E1. 768'0", Fire Hazard Zone 4C3 i 7 .

8 Aux. Bldg., Zone 2-38 l o.

E1. 663'0", Fire Hazard Zone GE '

16. OG Bldg./0G B1dg. Corridor ,

l

- a. OG Bldg., Zone 2-29 14

' E1. 736'6", Fire Hazard Zones 8A1, 8A2 LA SALLE - UNIT 2 3/4 3-78 I - - - _. .

)

l ATTACHMENT C SIGNIFICANT HAZARDS CONSIDERATION Commonwealth Edison has evaluated the proposed Technical Specification Amendment and determined that it does not represent a significant hazards consideration. Based on the criteria for defining a significant hazards consideration estabished in 10 CFR 50.92, operation of LaSalle County Station Units 1 and 2 in accordance with the proposed amendment will not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because the addition of fire detection in the areas specified enhances the likelihood of a fire being detected early.
2) Create the possibility of a new or different kind of accident from any accident previously evaluated because fire detection and protection has been previously evaluated in the FSAR and associated documents. The addition of these detectors is a result of those evaluations.
3) Involve a significant reduction in the margin of safety because the additional detectors increase the margin of safety in that the ability to detect and locate a fire is enhanced. The change in reporting requirements does not affect the ability of the fire protection program to detect a fire in a timely manner and take appropriate action. This change is an administrative change to make LaSalle Tech Specs correspond to the GE BWR Standard Tech Specs.

Based on the preceding discussion, it is concluded that the proposed system change clearly falls within all acceptable criteria with respect to the system or component, the consequences of previously evaluated accidents will not be increased and the margin of safety will not be decreased.

Therefore, based on the guidance provided in the Federal Register and the criteria established in 10 CFR 50.92(c), the proposed change does not constitute a significant hazards consideration.