Proposed Tech Spec Table 3.3.7.9-1, Fire Detection Instrumentation, Adding New Fire Detector Locations to Units 1 & 2ML20154L112 |
Person / Time |
---|
Site: |
LaSalle |
---|
Issue date: |
03/04/1986 |
---|
From: |
COMMONWEALTH EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20154L051 |
List: |
---|
References |
---|
NUDOCS 8603110394 |
Download: ML20154L112 (8) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6971995-12-21021 December 1995 Proposed Tech Specs,Deleting TS LCO 3.4.2 Action Statement B ML20093D4421995-10-0202 October 1995 Proposed TS Section 3.4.2,changing SRV Safety Valve Function Lift Setting Tolerance ML20091P8971995-08-28028 August 1995 Proposed Tech Specs,Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits for Unit 2 ML20084U3071995-06-0808 June 1995 Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/Edgs ML20084C2491995-05-23023 May 1995 Proposed Tech Specs,Clarifying Described Equipment out-of- Svc Options ML20083P6401995-05-19019 May 1995 Proposed Tech Specs,Revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9341995-04-11011 April 1995 Proposed Tech Specs Re Extension of Specific Surveillance Intervals ML20087H7871995-03-31031 March 1995 Proposed Tech Specs Section 3.4.2,revising SRV Safety Function Lift Setting Tolerances ML20078H1531995-01-30030 January 1995 Proposed Tech Specs,Proposing One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S3041995-01-13013 January 1995 Proposed Tech Specs Revising Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7081994-12-14014 December 1994 Proposed Tech Specs,Minimizing Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation in Reactor Protection,Isolation,Emergency Core Cooling,Recirculation Pump Trip & RCIC Sys ML20078B9571994-10-24024 October 1994 Proposed Tech Specs Associated W/Exemption Requests from App J for LaSalle Unit 2 to Return to Cilrt Type a Test Schedule of Three Times in 10 Yrs & for LaSalle Units 1 & 2 to Decouple Cilrt Type a Test Schedule from ISI Schedule ML20069J7801994-06-0909 June 1994 Proposed Tech Specs for Partial Implementation of GE ARTS Program ML20065A2231994-03-22022 March 1994 Proposed Tech Specs Re Deletion of Primary Containemnt Structural Integrity ML20063F3441994-01-28028 January 1994 Proposed Tech Specs 3.3.1 & 3.3.4,extending Surveillance Test Interval from Monthly to Quarterly to Verify Proper Position of MSIV Limit Switches for RPS Instrumentation Operability 1999-08-06
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212F9221999-09-23023 September 1999 Rev 2.3 to Chapters 10,11,12 & App F of LaSalle Annex Odcm ML20211L2871999-09-0202 September 1999 Revs to ODCM, for LaSalle Annex Including Rev 2.2 for Chapters 10,11,12 & App F ML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20207A9491999-02-23023 February 1999 Rev 4 to LaSalle County Station Restart Plan for Unit 2 ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20151Y5991998-09-14014 September 1998 Rev 3 to LaSalle County Station Restart Plan, for Unit 2 Only ML20236U5511998-07-24024 July 1998 NRC Manual Chapter 0350 Restart Action Plan,For LaSalle County Station ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20217N9541998-04-30030 April 1998 Rev 1.9 to Chapter 10,rev 2 to Chapter 11 & Rev 1.9 to Chapter 12 of LaSalle Odcm ML20217P2511998-04-28028 April 1998 Rev 2 to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20217Q7981997-08-26026 August 1997 Rev 1a to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20148D9561997-05-16016 May 1997 LSCS Unit 1/Unit 2 Restart Plan ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20140C9231997-03-31031 March 1997 Rev 1.9 to Chapter 11, Radiological Environ Monitoring Program & LaSalle Annex Index ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20134L0221996-11-30030 November 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11 & 12 ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20115D8781996-07-0808 July 1996 Cycle 8 Startup Test Rept ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20097C9051996-02-0202 February 1996 Rev 1 to ISI Plan for Comm Ed LaSalle County Station Units 1 & 2 Second Ten-Yr Interval Insp Program ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High 1999-09-23
[Table view] |
Text
.
ATT A CH M E h>T A TABLE 3.3.7.9-1 (Continued)
~
FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENT'S OPERABLE
- HEAT FLAME SMOKE Unit 1 Fire Detection Instrumentation (Continued) .
- 14. Reactor Bldg./ Containment
- a. Refuel Floor, Zone 1-26 6 E1. 843'6", Fire Hazard Zone Area 1 Reactor B1dg. East, Zone 1-24 11 b.
E1. 820'6", Fire Hazard Zone 281 Reactor Bldg. West, Zone 1-23 9 c.
E1. 820'6", Fire Hazard Zone 2B2 Reactor Bldg. South, Zone 1-36 18 d.
E1. 786'6", Fire Hazard Zone 2D ~
Reactor Bldg. North, Zone 1-37 17 e.
E1. 786'6", Fire Hazard Zone 20 Reactor Bldg. South, Zone 1-34 22 f.
E1. 761', Fire Hazard Zone 2E Reactor Bldg. North, Zone 1-35 18 g.
El. 761', Fire Hazard Zone 2E -
Containment, Zone 1-16P 7
[ h.
E1. 761' and 777', Fire Hazard Zone 2J 9 -
- 1. Containment Zone 1-16 E1. 740' and 749', Fire Hazard Zone 2J 5
- j. Reactor Bldg., Zone 1-17 E1. 740', Fire Hazard Zone 2F Reactor Bldg. North, Zone 1-17P 11 i k.
El. 740', Fire Hazard Zone 2F Reactor Bldg. SW, Zone 1-22 4 1.
E1. 710'6", Fire Hazard Zone 2G Reactor Bldg. NW, Zone 1-22P 6 m.
E1. 710'6", Fire Hazard Zone 2G l
Reactor Bldg. South, Zone 1-32 17 n.
E1. 694', Fire Hazard Zones 2H1, 2H2, 2H3
~
Reactor Bldg. North, Zone 1-33 20 o.
El. 694', Fire Hazard Zones 2H1, 2H4, 2HS Reactor Bldg. South, Zone 1-30 19 i p.
E1. 673', Fire Hazard Zones 211, 212, 213 Reactor Bldg. North, Zone 1-31 20 q.
El. 673', Fire Hazard Zones 2II, 214, 215 ,
- r. Tag,- r:Ih. ufest , teue, l- 4 c E
E l. BC7 NF .'re. Hawd %:us 2C LA SALLE - UNIT 1 3/4 3-77 P _
TABLE 3.3.7.9-1 (Continued)
FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE
- HEAT FLAME SMOKE Unit 1 Fire Detection Instrumentation (Continued)
- 15. Auxiliary Building / Turbine Bldg
- a. Aux. Bldg. Vent Floor, Zone 1-1 2 E1. 815', Fire Hazard Zone 4A
- b. Aux. B1dg. Vent Floor, Zone 1-2 8
. E1. 786'6", Fire Hazard Zone 4B
- c. Control Room, Zone 1-5 15 El. 768', Fire Hazard Zone 4C1
- d. Computer Room, Zone 1-6 - 8 E1. 768', Fire Hazard Zone 4C4
- e. Reactor Prot. M-G Set Room, Zone 1-12 12 E1. 749', Fire Hazard Zone 4D3
- f. Cable Sp' reading Area, Zone 1-18 15 E1. 749', Fire Hazard Zone SA4
- g. Div. 2 SWGR Room, Zone 1-8 15 E1. 731', Fire Hazard Zone 4E3 , _j
- h. Aux. Electric Equipment Room, Zone 1-27 13
. E1. 731', Fire Hazard Zone 4E1
- 1. Aux. Bldg. Corridor, Zone 1-3 5 -
E1. 731', Fire Hazard Zone 5B13
- j. Aux. Bldg. Corridor, Zone.1-7 12 E1. 731', Fire Hazard Zone 5B13
^
- k. Div. 1 SWGR Room, Zone 1-9 -
17 E1. 710'6", Fire Hazard Zone 4F1 -
- 1. Aux. Bldg. Corridor, Zone 1-4 9 E1. 710'6", Fire Hazard Zone SC11
- m. Div. 3 SWGR Room, Zone 1-10 5
,ynet El. 687', Fire Hazard Zone 501 Athu}SA __ ,,16. DG Bldg./DG Bldg. Corridor
- a. DG Bldg., Zone 1-29 17 E1. 736'6", Fire Hazard Zones 7A1, 7A2, 7A3
- b. DG Bldg. Corridor, Zone 1-25 3 El. 710'6", Fire Hazard Zone SC11
- c. DG Bldg., Zone 1-28 15 E1. 674', Fire Hazard Zones 7C4, 7CS, 7C6 s
. LA SALLE - UNIT 1 3/4 3-78
3/4 3-78
- v. Aux . Sids. , 2.aue I-33 E l. T h y' C.f, p;,., y, ;,4 2,ae q cg, 30
- c. Av1. s\d I-38 28.
GG340g., zoneHagard 2ane
, Fire foe B 9
I 9
0 De
.'. i . ..
4 .
INSTRUMENTATION FIRE DETECTION ' INSTRUMENTATION
' LIMITING CONDITION FOR OPERATION
[,
3.3.7.9 As a minimum, the fire detection instrumentation for each fire -
detection zone of Unit 1 and Unit .2 shown in Table 3.3.7.9-1 shall be OPERABLE.* .
APPLICABILITY: Whenever equipment protected by the fire detection inst ument
' is requirea to be OPERABLE. -
ACTION: . .
With the number of OPERABLE fire detection instruments less than the Minimum Instruments OPERABLE requirement of Table-3.3.7.9-1: .
- a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at-least once per hour, unless the instrument (s) is located inside the primary containment, then inspect the primary containment at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the containment air temperature at least once per hour at the locations listed in Specification 4.6.1.7.
- b. Restore the minimum mber of instruments to OPERABLE status within
' [D
^
14 days or, prepare an submit a Special Report to the Commission pursuant to Specificatio 6.6.C within 30 days outlining the action .
taken, the cause of the in etability and the plans and schedule for .{,
restoring the instrument (s)
I -
OPERABLE status.
- b ,
JJ The provisions of Specifica,tions 3.0.3 and 3.0.4 are not applicable. f-SURVEILLANCE REOUIREMENTS _
. 4.3.7.9.1 Each of the above required fire detection instruments which are accessible during unit operation shall be demonstrated ODERABLE at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors l which are not accanible during unit operation shall be demonstrated OPERABLE i by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUT 00WN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.,
4.3.7.9.2 The NFPA Standard 720 supervised circuits supervision associated
- with the detector alarms of each of the above required fire detection instruments shall be demons'trated OPERABLE at least once per 6 months. Super-
- vised circuits with detectors which are inassessible during unit operation
! shall be demonstrated OPERABLE during each COLD SHUTOOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.
3 . .
"Tne normal or emergency power source may be inoperable in OPERATICHAL CONDITION 4 or 5 or when defueled.
1 .
. LA SALLE - UNIT 1 3/4 3-75 Amendment No. 23 s
e
.-- ~ , ,_---4 --,---.,y-- .,,m.,---.y--. ,n_ _ , - - - - - _ _ _ - _ _ - . . _ . -,------x-
~~
a . ,
. INSTRUMENTATION ,
- FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 4
3.3.7.9 As a minimum, the fire detection instrumentation for each fire
!, detection zone of Unit I and Unit 2 shown in Table 3.3.7.9-1 shall be OPERABLE.*
APPLICABILITY:- Whenever equipment protected by the fire detection instrument is required to be OPERABLE. '
ACTION: .
With the number of' OPERABLE fire detection instruments less than the Minimum Instruments OPERABLE requirement of Table 3.3.7.9-1:
- a. Within I hour, establish a fire watch patrol to inspect the zone (s)
- i. with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the primary containment, then inspect the primary containment at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the ,
containment air temperature at least once per hour at the locations
- listed in Specification 4.6.1.7.
- b. Restore the minimum n ber of instruments to OPERABLE status within
- 14 days or, prepare and ubmit a Special Report to the Commission lM pursuant to Specificatio .6.C within 30 days outlining the action l#
. taken, the cause of the in erability and the plans and schedule for restoring the instrument (s) OPERA 8LE status. -
g -
p The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.3.7.9.1 Each of the above required fire detection instruments which are *
- accessible during unit operation shall be demonstrated OPERABLE at least once per 5 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors
- - which are not accessible during unit operation shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUTOOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.,
i '
4.3 7.9.2 The NFPA Standard 72D supervised circuits supervision associated with the detector alarms of each of the above required fire detection instruments shall be demonstrated CPERABLE at least once per 6' months. Super-
, vised circuits with detectors which are inaccessible during unit operation shall
! be demonstrated OPERABLE during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the, previous 6 months.,
! "The normal or emergency power source may be inoper:able in OPERATIONAL
~
CONDITION 4 or 5 or when defueled.
LA SALLE - UNIT 2 3/4 3-75 Amendment No.ll 1
-m --, . .,m-- _ _ . , _ . , _ . - - , .- , , _ - , _ _ _ _ . _ - . _, _ , _ _ . _ _ , . _ _ _ _ . _ _ . _ _ - . - _ _ _ . . _ . -
4 yQ C HAN WS p(l 56)i"C(AltVT]UA}O-
. TABLE 3.3.7.9-1 (Continued) .
FIRE DETECTION INSTRUMENTATION INSTRtJMENT LOCATION MINIMUM INSTRUNENTS OPERABLE" HEAT Ft.AME SMcKE
~
- Unit 2 Fire Detection Instrumentation (Continued)' ,
- 14. Reactor 81dg./ Containment
- a. Refuel Floor, Zone 2-25 6 E1. 843'6", Fire Hazard Zone Area 1
- b. Reactor 81dg. East, Zone 2-24 11 E1. 820'6", Fire Hazard Zone 381
- c. Reactor Bldg. West, Zone 2-23 ,9 E1. 820'6", Fire Hazard Zone 382 ~
- d. Reactor 81dg. South, Zone 2-36 19
, E1. 786'6", Fire Hazard Zone 30 - . , .
- e. Reactor 81dg. North, Zone 2-37 17 E1. 786'6", Fire Hazard Zone 30
- f. Reactor 8?dg. South, Zone 2-34 23 E1. 761', Fire Hazard Zone 3E
- g. Reactor 81dg. North,7 Zone 2-35 18 E1. 761', Fire Hazard Zone 3E
- h. ' Containment, Zone 2-16P 7 E1. 761' and 777', Fire Hazard Zone 3J -
- 1. Containment, Zone 2-16 9 E1. 740' and 749', Fire Hazard Zone 3J
- j. 'eactor 81dg., Zone 2-17 5
E1. 740', Fire Hazard Zone 3F
- k. Reactor Bldg. North, Zone 2-17P 11 E1. 740', Fire Hazard Zone 3F
- 1. Reactor 81dg. SW, Zone 2-22 4 - -
E1. 710'6", Fire Hazard Zone 3G Reactor Bldg. NW, Zone 2-22P 6 -
m.
. E1. 710'6", Fire Hazard Zone 3G
- n. Reactor 81dg. South, Zone 2-32 17 E1. 694', Fire Hazard Zones 3H1, 3H2, 3H3
- o. Reactor 81dg. North, Zone 2-33 ,
20 E1. 694', Fire Hazard. Zones 3H1, 3H4, 3H5 ,
- p. Reactor Bldg. South, Zone 2-30 19 E1. 673', Fire Hazard Zones 3II, 3I2, 313
- q. Reactor 81dg. North, Zone 2-31 20 i, E1. 673', Fire Hazard Zones.3II, 3I4, 315 m.
- r. Reactor 81dg. West Zone 2-40 7 E1. 807',.Ftre Hazard Zone 3C LA SALLE - UNIT 2 3/4 3-77
r.,
UD C#eWS . . . .
Pc ,2. '.rW,=c a:om A Tsu.J OuLV
~
TABLE 3.3.7.9-1 (Continued) .
FIRE DETECTION INSTRUMENTATION
. . INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE" HEAT Ft.AME SMaxE Unit 2 Fire Detection Instrumentation (Continued)
- 15. Auxiliary Building / Turbine Bldg .
- a. Aux. B1dg. Vent Floor, Zor 4 2-1 5
. El. 815', Fire Hazard Zone 4A
- b. Aux. 81dg. Vent Floor, Zone 2-2 9 E1. 786'6", Fire Hazard Zone 48
- c. Control Room, Zone 2-5 17 E1. 768', Fire Hazard Zone 4C1 -
- d. ' Record Room Zone 2-6 3 E1. 768', Fire Hazard Zone 4C5
- e. Reactor Prot. M-G Set Roca, Zone 2-12 12 E1. 749', Fire Hazard Zone 404
- f. Cable Spreading Area, Zone 2-18 13 E1. 749', Fire Hazard Zone 5A4
- g. Div.'2 SWGR Roos, Zone 2-8 15 E1. 731', Fire Hazard Zone 4E4 Aux. Electric Equipment Roos, Zone 2-27 12 h.
E1. 731', Fire Hazard Zone 4E2 ,
- 1. Au. Bldg. Corridor, Zone 2-3 5 E1. 731', Fire Hazard Zone 5813
- j. Aux. 81dg. Corridor, Zone 2-7 12 E1. 731', Fire Hazard Zone 5813
- k. Div.1 SWGR Room, Zone 2-9 17 E1. 710'6, Fire Hazard Zone 4F2 - .
l '
Aux. 81dg. Corridor, Zone 2-4 9 1.
E1. 710'6", Fire Hazard Zone 5C11 Div. 3 SWGR Room, Zone 2-10 5 l
m.
i E1. 687', Fire Hazard Zone 502
- n. Aux. 81dg., Zone 2-3? 10 E1. 768'0", Fire Hazard Zone 4C3 i 7 .
8 Aux. Bldg., Zone 2-38 l o.
E1. 663'0", Fire Hazard Zone GE '
- 16. OG Bldg./0G B1dg. Corridor ,
l
- a. OG Bldg., Zone 2-29 14
' E1. 736'6", Fire Hazard Zones 8A1, 8A2 LA SALLE - UNIT 2 3/4 3-78 I - - - _. .
)
l ATTACHMENT C SIGNIFICANT HAZARDS CONSIDERATION Commonwealth Edison has evaluated the proposed Technical Specification Amendment and determined that it does not represent a significant hazards consideration. Based on the criteria for defining a significant hazards consideration estabished in 10 CFR 50.92, operation of LaSalle County Station Units 1 and 2 in accordance with the proposed amendment will not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated because the addition of fire detection in the areas specified enhances the likelihood of a fire being detected early.
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated because fire detection and protection has been previously evaluated in the FSAR and associated documents. The addition of these detectors is a result of those evaluations.
- 3) Involve a significant reduction in the margin of safety because the additional detectors increase the margin of safety in that the ability to detect and locate a fire is enhanced. The change in reporting requirements does not affect the ability of the fire protection program to detect a fire in a timely manner and take appropriate action. This change is an administrative change to make LaSalle Tech Specs correspond to the GE BWR Standard Tech Specs.
Based on the preceding discussion, it is concluded that the proposed system change clearly falls within all acceptable criteria with respect to the system or component, the consequences of previously evaluated accidents will not be increased and the margin of safety will not be decreased.
Therefore, based on the guidance provided in the Federal Register and the criteria established in 10 CFR 50.92(c), the proposed change does not constitute a significant hazards consideration.