Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify

From kanterella
Revision as of 20:09, 17 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify
ML091050027
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/19/2009
Revision: 0
From: McGinty T J
Division of Policy and Rulemaking
To:
Pong Chung, NRR/DE/EICB 415-2473
References
IN-09-009
Download: ML091050027 (4)


ML091050027 June 19, 2009 NRC INFORMATION NOTICE 2009-09: IMPROPER FLOW CONTROLLER SETTINGS RENDERS INJECTION SYSTEMS INOPERABLE AND SURVEILLANCE DID NOT IDENTIFY

ADDRESSEES

All holders of operating licenses for boiling-water nuclear power reactors, except those who have permanently ceased operations and who have certified that fuel has been permanently removed from the reactor vesse

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to alert addressees that improper flow controller settings in the high-pressure core spray (HPCS) system, high-pressure coolant injection (HPCI) system, and/or reactor core isolation cooling (RCIC) system injection systems at several boiling-water reactors resulted in system flow oscillations that rendered the systems inoperabl Testing failed to identify the inoperable systems because the system alignment during the surveillance differed from the system alignment when the systems are called upon to perform their safety function The NRC expects that recipients will review the information for applicability to their facilities and will consider actions, as appropriate, to avoid similar problem Suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is require DESCRIPTION OF CIRCUMSTANCES Perry Nuclear Power Plant, Unit 1 As discussed in NRC IN 2008-13, "Main Feedwater System Issues and Related 2007 Reactor Trip Data," on November 28, 2007, an unplanned automatic reactor trip occurred at Perry Nuclear Power Plant, Unit 1, that stemmed from a failure of the digital feedwater control syste As the reactor vessel water level decreased, the RCIC pump automatically started but tripped after 11 seconds on low RCIC pump suction pressure because the RCIC flow controller was tuned incorrectly in 200 At the time of the RCIC pump trip, RCIC was aligned to take suction from the suppression pool instead of the normal path from the condensate storage tank (CST) because of an inoperable CST level indicato While using HPCS to maintain the water level in the reactor vessel, the operating crew attempted to recover RCIC by first realigning the RCIC pump suction from the suppression pool to the CS With the RCIC flow controller in automatic, operators started and ran the RCIC pump and then attempted to feed water into the reacto At that point, the operator noted large injection flow oscillations and RCIC again tripped on low suction pressur Operators successfully recovered RCIC by starting the RCIC pump with the flow controller in manual, and supplied water to the reactor vessel without large flow oscillations or RCIC trippin It was later determined that the RCIC flow controller gain, reset and rate settings had been altered from the settings used to successfully inject to the reactor vessel during plant startup testin These changes resulted in an overly responsive flow control loo Limerick Generating Station, Unit 2 On April 24, 2007, the Limerick Generating Station, Unit 2, was at 100-percent power when the redundant reactivity control system inadvertently initiated a reduction in total feedwater flow to the reactor vesse Subsequently, the rapid decrease of the water level in the reactor vessel caused an automatic scra As the water level of the reactor vessel continued to decrease during the event, the HPCI and RCIC systems automatically started at -38 inches, as designe Following initiation, the HPCI and RCIC systems experienced abnormal system flow oscillations from no-flow to full-flow (5,600 gallons per minute for the HPCI system and 600 gallons per minute for the RCIC system) for 3.4 seconds and 1.2 seconds, respectivel Additionally, the common suction source for both systems unexpectedly swapped from the CST to the suppression pool due to pressure oscillations in the common suction pipin Approximately 2 minutes following the scram, the operators placed both HPCI and RCIC flow controllers into manual control and continued to restore reactor water leve Both systems responded to manual control as expected, and the flow oscillations cease The licensee subsequently determined it had incorrectly adjusted the flow controller gain and reset settings to the values outside the expected range by a factor of 1 Additional information is available in Limerick Licensee Event Report 50-353/2007-003, dated June 22, 2007 (which can be found on the NRC's public Web site in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML071730270).

Root Cause In each of the above examples, one of the causes of the flow oscillations was improper flow controller tuning of the HPCS, HPCI, and RCIC system Licensee test programs and surveillance procedures did not identify this deficienc Surveillance testing of HPCS, HPCI, and RCIC pumps is performed while at power with the systems drawing water from the CST and discharging through a full-flow test return line back to the CST, also known as a CST-to-CST alignmen However, when these systems are called upon to perform their safety function, these systems draw water from the CST and inject into the reactor vesse Industry operating experience has demonstrated that HPCS, HPCI and RCIC system response is slower when operating in a CST-to-CST alignment compared to actual injection operatio Therefore, these systems need to be tuned and maintained appropriately to account for the difference in response during actual vessel injectio General Electric/Hitachi Report 0000-0079-1103, Revision 1, delineates that RCIC operability of the flow control loop can be assured by maintaining RCIC flow controller tuning settings used during successful reactor pressure vessel injection DISCUSSION The HPCS, HPCI, and RCIC systems are required to be operable as specified in plant technical specification As illustrated above, failure to establish adequate procedures to properly tune system flow controllers as required by Title 10 of the Code of Federal Regulations (10 CFR)

Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings" can result in these systems being rendered inoperabl In addition, surveillance testing did not reveal that systems were inoperable and could not perform their safety function to inject water to the reactor vessel, which is contrary to 10 CFR Part 50, Appendix B, Criterion XI, "Test Control."

CONTACT

This IN requires no specific action or written respons Please direct any questions about this matter to the technical contact listed below or to the appropriate Office of Nuclear Reactor Regulation (NRR) project manage /RA by TQuay for/ Timothy J. McGinty, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Technical Contact:

Pong Chung, NRR 301-415-2473 E-mail: Pong.Chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collection systems being rendered inoperabl In addition, surveillance testing did not reveal that systems were inoperable and could not perform their safety function to inject to the reactor vessel, which is contrary to 10 CFR Part 50, Appendix B, Criterion XI, "Test Control."

CONTACT

This IN requires no specific action or written respons Please direct any questions about this matter to the technical contact listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manage /RA by TQuay for/ Timothy J. McGinty, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Technical Contact:

Pong Chung, NRR 301-415-2473 E-mail: Pong.Chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collection ADAMS Accession Number: ML091050027 TAC No.: ME0622 OFFICE EICB:DE TECH EDITOR BC:EICB:DED:DE PGCB:DPRPGCB:DPR NAME PChung KAzariah-Kribbs WKemper PHilandDBeaulieu CHawes DATE 5/12/09 4/15/09 email 5/26/09 5/28/09 6/3/09 6/3/09 OFFICE BC:PGCB:DPR D:DPR NAME MMurphy TMcGinty DATE 6/16/09 6/19/09 OFFICIAL RECORD COPY