MONTHYEARInformation Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 1999-28, Recall of Star Brand Fire Protection Sprinkler Heads1999-09-30030 September 1999 Recall of Star Brand Fire Protection Sprinkler Heads Information Notice 1999-27, Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units1999-09-0202 September 1999 Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units Information Notice 1999-26, Safety and Economic Consequences of Misleading Marketing Information1999-08-24024 August 1999 Safety and Economic Consequences of Misleading Marketing Information Information Notice 1999-25, Year 2000 Contingency Planning Activities1999-08-10010 August 1999 Year 2000 Contingency Planning Activities Information Notice 1999-24, Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices1999-07-12012 July 1999 Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices Information Notice 1999-23, Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices1999-07-0606 July 1999 Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices Information Notice 1999-22, 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion1999-06-25025 June 1999 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion Information Notice 1999-21, Recent Plant Events Caused by Human Performance Errors1999-06-25025 June 1999 Recent Plant Events Caused by Human Performance Errors Information Notice 1999-20, Contingency Planning for the Year 2000 Computer Problem1999-06-25025 June 1999 Contingency Planning for the Year 2000 Computer Problem Information Notice 1999-19, Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant1999-06-23023 June 1999 Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant Information Notice 1999-18, Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders1999-06-14014 June 1999 Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses1999-06-0303 June 1999 Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses Information Notice 1999-16, Federal Bureau of Investigation'S Nuclear Site Security Program1999-05-28028 May 1999 Federal Bureau of Investigation'S Nuclear Site Security Program Information Notice 1999-15, Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis1999-05-27027 May 1999 Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick1999-05-0505 May 1999 Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick Information Notice 1999-13, Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs1999-04-29029 April 1999 Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs Information Notice 1999-12, Year 2000 Computer Systems Readiness Audits1999-04-28028 April 1999 Year 2000 Computer Systems Readiness Audits Information Notice 1999-11, Incidents Involving the Use of Radioactive Iodine-1311999-04-16016 April 1999 Incidents Involving the Use of Radioactive Iodine-131 Information Notice 1999-08, Urine Specimen Adulteration1999-03-26026 March 1999 Urine Specimen Adulteration Information Notice 1999-09, Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-9991999-03-24024 March 1999 Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-999 Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems1999-03-22022 March 1999 Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems Information Notice 1999-06, 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-06, 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-05, Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration1999-03-0808 March 1999 Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration Information Notice 1999-04, Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures1999-03-0101 March 1999 Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures Information Notice 1999-03, Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake)1999-01-29029 January 1999 Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake) Information Notice 1999-02, Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources1999-01-21021 January 1999 Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources Information Notice 1999-01, Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit1999-01-20020 January 1999 Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit Information Notice 1998-45, Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds1998-12-15015 December 1998 Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds Information Notice 1998-44, Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping1998-12-10010 December 1998 Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping Information Notice 1998-43, Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping1998-12-0404 December 1998 Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping Information Notice 1998-42, Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements1998-12-0101 December 1998 Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators from Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators from Design Oversight Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators From Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators From Design Oversight Information Notice 1998-39, Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 19971998-10-30030 October 1998 Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 1997 Information Notice 1998-40, Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents1998-10-26026 October 1998 Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents Information Notice 1990-66, Incomplete Draining and Drying of Shipping Casks1998-10-25025 October 1998 Incomplete Draining and Drying of Shipping Casks Information Notice 1998-38, Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections1998-10-15015 October 1998 Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections Information Notice 1998-37, Eligibility of Operator License Applicants1998-10-0101 October 1998 Eligibility of Operator License Applicants Information Notice 1998-36, Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems1998-09-18018 September 1998 Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems Information Notice 1998-33, NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities1998-08-28028 August 1998 NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities Information Notice 1998-34, Configuration Control Errors1998-08-28028 August 1998 Configuration Control Errors Information Notice 1998-31, Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 21998-08-18018 August 1998 Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 Information Notice 1998-30, Effect of Year 2000 Computer Problem on NRC Licensees and Certificate Holders1998-08-12012 August 1998 Effect of Year 2000 Computer Problem on NRC Licensees and Certificate Holders Information Notice 1998-29, Predicted Increase in Fuel Rod Cladding Oxidation1998-08-0303 August 1998 Predicted Increase in Fuel Rod Cladding Oxidation Information Notice 1998-28, Development of Systematic Sample Plan for Operator Licensing Examinations1998-07-31031 July 1998 Development of Systematic Sample Plan for Operator Licensing Examinations Information Notice 1998-26, Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations1998-07-24024 July 1998 Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations Information Notice 1998-27, Steam Generator Tube End Cracking1998-07-24024 July 1998 Steam Generator Tube End Cracking Information Notice 1998-25, Loss of Inventory from Safety-Related Closed-Loop Cooling Water Systems1998-07-0808 July 1998 Loss of Inventory from Safety-Related Closed-Loop Cooling Water Systems 2009-06-19
[Table view] |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, DC 20555-0001 June 19, 2009 NRC INFORMATION NOTICE 2009-09: IMPROPER FLOW CONTROLLER SETTINGS
RENDERS INJECTION SYSTEMS INOPERABLE
AND SURVEILLANCE DID NOT IDENTIFY
ADDRESSEES
All holders of operating licenses for boiling-water nuclear power reactors, except those who
have permanently ceased operations and who have certified that fuel has been permanently
removed from the reactor vessel.
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to alert
addressees that improper flow controller settings in the high-pressure core spray (HPCS)
system, high-pressure coolant injection (HPCI) system, and/or reactor core isolation cooling
(RCIC) system injection systems at several boiling-water reactors resulted in system flow
oscillations that rendered the systems inoperable. Testing failed to identify the inoperable
systems because the system alignment during the surveillance differed from the system
alignment when the systems are called upon to perform their safety functions. The NRC
expects that recipients will review the information for applicability to their facilities and will
consider actions, as appropriate, to avoid similar problems. Suggestions contained in this IN
are not NRC requirements; therefore, no specific action or written response is required.
DESCRIPTION OF CIRCUMSTANCES
Perry Nuclear Power Plant, Unit 1
As discussed in NRC IN 2008-13, Main Feedwater System Issues and Related 2007 Reactor
Trip Data, on November 28, 2007, an unplanned automatic reactor trip occurred at Perry
Nuclear Power Plant, Unit 1, that stemmed from a failure of the digital feedwater control system.
As the reactor vessel water level decreased, the RCIC pump automatically started but tripped
after 11 seconds on low RCIC pump suction pressure because the RCIC flow controller was
tuned incorrectly in 2006. At the time of the RCIC pump trip, RCIC was aligned to take suction
from the suppression pool instead of the normal path from the condensate storage tank (CST)
because of an inoperable CST level indicator. While using HPCS to maintain the water level in
the reactor vessel, the operating crew attempted to recover RCIC by first realigning the RCIC
pump suction from the suppression pool to the CST. With the RCIC flow controller in automatic, operators started and ran the RCIC pump and then attempted to feed water into the reactor. At
that point, the operator noted large injection flow oscillations and RCIC again tripped on low
suction pressure. Operators successfully recovered RCIC by starting the RCIC pump with the
flow controller in manual, and supplied water to the reactor vessel without large flow oscillations
or RCIC tripping. It was later determined that the RCIC flow controller gain, reset and rate
settings had been altered from the settings used to successfully inject to the reactor vessel
during plant startup testing. These changes resulted in an overly responsive flow control loop.
Limerick Generating Station, Unit 2
On April 24, 2007, the Limerick Generating Station, Unit 2, was at 100-percent power when the
redundant reactivity control system inadvertently initiated a reduction in total feedwater flow to
the reactor vessel. Subsequently, the rapid decrease of the water level in the reactor vessel
caused an automatic scram. As the water level of the reactor vessel continued to decrease
during the event, the HPCI and RCIC systems automatically started at -38 inches, as designed.
Following initiation, the HPCI and RCIC systems experienced abnormal system flow oscillations
from no-flow to full-flow (5,600 gallons per minute for the HPCI system and 600 gallons per
minute for the RCIC system) for 3.4 seconds and 1.2 seconds, respectively. Additionally, the
common suction source for both systems unexpectedly swapped from the CST to the
suppression pool due to pressure oscillations in the common suction piping. Approximately
2 minutes following the scram, the operators placed both HPCI and RCIC flow controllers into
manual control and continued to restore reactor water level. Both systems responded to
manual control as expected, and the flow oscillations ceased. The licensee subsequently
determined it had incorrectly adjusted the flow controller gain and reset settings to the values
outside the expected range by a factor of 10. Additional information is available in Limerick
Licensee Event Report 50-353/2007-003, dated June 22, 2007 (which can be found on the
NRCs public Web site in the Agencywide Documents Access and Management System
(ADAMS) under Accession No. ML071730270).
Root Cause
In each of the above examples, one of the causes of the flow oscillations was improper flow
controller tuning of the HPCS, HPCI, and RCIC systems. Licensee test programs and
surveillance procedures did not identify this deficiency. Surveillance testing of HPCS, HPCI,
and RCIC pumps is performed while at power with the systems drawing water from the CST and
discharging through a full-flow test return line back to the CST, also known as a CST-to-CST
alignment. However, when these systems are called upon to perform their safety function, these systems draw water from the CST and inject into the reactor vessel. Industry operating
experience has demonstrated that HPCS, HPCI and RCIC system response is slower when
operating in a CST-to-CST alignment compared to actual injection operation. Therefore, these
systems need to be tuned and maintained appropriately to account for the difference in
response during actual vessel injection. General Electric/Hitachi Report 0000-0079-1103, Revision 1, delineates that RCIC operability of the flow control loop can be assured by
maintaining RCIC flow controller tuning settings used during successful reactor pressure vessel
injections.
DISCUSSION
The HPCS, HPCI, and RCIC systems are required to be operable as specified in plant technical
specifications. As illustrated above, failure to establish adequate procedures to properly tune
system flow controllers as required by Title 10 of the Code of Federal Regulations (10 CFR)
Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings can result in these systems being rendered inoperable. In addition, surveillance testing did not reveal that systems
were inoperable and could not perform their safety function to inject water to the reactor vessel, which is contrary to 10 CFR Part 50, Appendix B, Criterion XI, Test Control.
CONTACT
This IN requires no specific action or written response. Please direct any questions about this
matter to the technical contact listed below or to the appropriate Office of Nuclear Reactor
Regulation (NRR) project manager.
/RA by TQuay for/
Timothy J. McGinty, Director
Division of Policy and Rulemaking
Office of Nuclear Reactor Regulation
Technical Contact:
Pong Chung, NRR
301-415-2473 E-mail: Pong.Chung@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. systems being rendered inoperable. In addition, surveillance testing did not reveal that systems
were inoperable and could not perform their safety function to inject to the reactor vessel, which
is contrary to 10 CFR Part 50, Appendix B, Criterion XI, Test Control.
CONTACT
This IN requires no specific action or written response. Please direct any questions about this
matter to the technical contact listed below or the appropriate Office of Nuclear Reactor
Regulation (NRR) project manager.
/RA by TQuay for/
Timothy J. McGinty, Director
Division of Policy and Rulemaking
Office of Nuclear Reactor Regulation
Technical Contact:
Pong Chung, NRR
301-415-2473 E-mail: Pong.Chung@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.
ADAMS Accession Number: ML091050027 TAC No.: ME0622 OFFICE EICB:DE TECH EDITOR BC:EICB:DE D:DE PGCB:DPR PGCB:DPR
NAME PChung KAzariah-Kribbs WKemper PHiland DBeaulieu CHawes
DATE 5/12/09 4/15/09 email 5/26/09 5/28/09 6/3/09 6/3/09 OFFICE BC:PGCB:DPR D:DPR
NAME MMurphy TMcGinty
DATE 6/16/09 6/19/09 OFFICIAL RECORD COPY
|
---|
|
list | - Information Notice 2009-01, National Response Framework (22 January 2009)
- Information Notice 2009-02, Biodiesel in Fuel Oil Could Adversely Impact Diesel Engine Performance (23 February 2009)
- Information Notice 2009-02, Biodiesel In Fuel Oil Could Adversely Impact Diesel Engine Performance (23 February 2009)
- Information Notice 2009-03, Solid State Protection System Card Failure Results in Spurious Safety Injection and Reactor Trip (11 March 2009)
- Information Notice 2009-03, Solid State Protection System Card Failure Results In Spurious Safety Injection And Reactor Trip (11 March 2009)
- Information Notice 2009-04, Age-Related Constant Support Degradation (18 February 2009)
- Information Notice 2009-05, Contamination Events Resulting from Damage to Sealed Radioactive Sources During Gauge Dismantlement and Non-Routine Maintenance Operations (3 February 2009)
- Information Notice 2009-06, Construction-Related Experience with Flood Protection Features (21 July 2009)
- Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify (19 June 2009, Topic: Reactor Vessel Water Level)
- Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) (7 July 2009)
- Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 (7 July 2009)
- Information Notice 2009-16, Spurious Relay Actuations Result in Loss of Power to Safeguards Busses (15 September 2009)
- Information Notice 2009-18, Performance of Required Shutter Checks and Reporting of Gauge Shutter Failures (18 September 2009, Topic: Stuck Shutter)
- Information Notice 2009-19, Hostile Action-Based Emergency Preparedness Drills (24 November 2009)
- Information Notice 2009-20, Degradation of Wire Rope Used in Fuel Handling Applications (7 October 2009)
- Information Notice 2009-21, Incomplete Medical Testing for Licensed Operators (30 September 2009)
- Information Notice 2009-23, Nuclear Fuel Thermal Conductivity Degradation (26 October 2012, Topic: Fuel cladding)
- Information Notice 2009-25, Firing Range Safety Issues (10 November 2009)
- Information Notice 2009-26, Spent Fuel Pool Neutron Absorbing Materials Degradation (28 October 2009)
- Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User's Manual (13 November 2009)
- Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User'S Manual (13 November 2009)
- Information Notice 2009-27, Revised International Nuclear and Radiological Event Scale User'S Manual (13 November 2009)
- Information Notice 2009-28, Summary of Fitness for Duty Program Performance Reports for Calendar Year 2008 (24 November 2009, Topic: Fitness for Duty)