Category:Letter
MONTHYEARML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) 2024-09-04
[Table view] Category:License-Operator
MONTHYEARIR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test 2024-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines 2024-09-23
[Table view] |
See also: IR 05000498/2020301
Text
September 11, 2020
Mr. G. T. Powell
President and CEO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000498/2021301;
05000499/2021301
Dear Mr. Powell:
In a telephone conversation on September 9, 2020, between Mr. Bobby Simpson, Operations
Training Manager, and myself, Chief Examiner, arrangements were made for the administration
of operator licensing examinations at South Texas Project during the weeks of July 12 and 19,
2021.
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory
Commission (NRC) will prepare the examinations based on the guidelines in NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 11. The NRCs
regional office will discuss with your staff any changes that might be necessary before the
examinations are administered. Your staff will be given the opportunity to review the
examinations before final approval, including during onsite validation the week of June 7, 2021.
The NRC staff will provide the written examination outline by December 28, 2020, and the
operating test outlines by February 8, 2021. The written examinations, operating tests, and
supporting reference materials identified in Attachment 3 to ES-201 will be due by April 26,
2021. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, Sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled. Your support for onsite validation of
the examinations is required during the week of June 7, 2021. In addition, the NRC requests
your support for onsite operating test development prior to examination validation, during a
week to be determined and agreed upon by your staff and that of the NRC.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
G. Powell 2
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests along with any video and audio
recordings of the dynamic operating tests until the NRC takes its licensing action on all of the
applications and any adjudicatory actions on any hearing demands are complete. Appendix E
to NUREG-1021 contains NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination
date (if able). I should be contacted to determine the method for submission of the waiver
and/or excusal requests. Preliminary reactor operator and senior reactor operator license
applications (OMB approval number 3150-0090) and, medical certifications (OMB approval
number 3150-0024) should be submitted at least 30 days before the first examination date. If
the preliminary applications are not received at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the
first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early in the process as possible (see the 60-day guideline,
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when I am contacted to determine the method for submission). The NRCs final
decision on whether to grant a waiver or excusal will be documented on the final (not
preliminary) NRC Form 398 submitted for the applicant and will not be provided until the final
application is submitted to the NRC.
Paperwork Reduction Act Statement
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
The burden to the public for these voluntary information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collection. You may submit comments on any aspect of the information collection,
including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to INFOCOLLECTS.RESOURCE@NRC.GOV; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
G. Powell 3
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at
https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Thank you for your cooperation in this matter. Mr. Bobby Simpson has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact me at 817-200-1117.
Sincerely,
Thomas J. Farina, Chief Examiner
Operations Branch
Division of Reactor Safety
Docket Nos. 05000498 and 05000499
License Nos. NPF-76 and NPF-80
cc: Distribution via LISTSERV
ML20255A225
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TJF Yes No Publicly Available Sensitive NRC-002
OFFICE SOE:OB
NAME TFarina
SIGNATURE /RA/
DATE 9/11/2020