. .; U. S. ATOMIC ENERGY COMMISSION
REGION II
- DIVISION OF COMPLIANCE Report of Inspection CO Report No. 50-172/71-1 Licensee:
Lcckheed Aircraf t Corporation (RER) ~
License No. R-86 Category E Date of Inspection: May 19, 1971 Date of Previous Inspection: September 9,1970 Inspected By: M [/30///
R. C. Lewis, Reactor I .spector (Operations) ' Dat(
.
(In harge)
J/ J R. G utherl 3
-
Senior Rsdiation Specialist shW71 Date
~]] s
'
Reviewed By:
~
i
'
/!7/
W. C. Seidle/ Senior Reactor Inspector 'Da t e Proprietary Information: None SCOPE
'
An announced inspection was conducted at the shutdown 3 Mwt pressurized water, unshielded research reactor located at the Lockheed-Georgia nuclear laboratory near Dawsor.ville, Georgi ,
The purpose of the inspection was to review the status of the. shutdown reactor, fuel storage, adherence to sampling and monitoring requirements, and maintenance of securit ,
85052g29384025 PDR MAN 8 -737
.:.
~$ \
s?.?(
.
, ., . . ..- - --- .- - . .
"
JC0 Rpt. Na.150-172/71-1 -2-
+. ,
-
,.
. .
- ( _ . . SUMMARY
. . .
Safety Items - Nw.*
Nonconolf ance Items - An ites of noncompliance was detected during the inspec-
'
t ion. Contrary to paragraph C.2 of the Technical Specifications, the filter ~
sample from the continuous particulate air sampler was not collected and analysed weekly for gross alpha activity. A Form AEC-592 was issued on May 21, 1971. . (See Section R.)
Unusual' Occurrences - None .
Status of Previously Reported Problems . There were four items cf noncompliance
- noted in the previous inspeccion report and a Form AEC-592 was issued.- A satisfactory response to the Form AEC-592 was received from the Lockheed.
1 Georgia Company on October 14,_1970.
.
Other Sianificant -Items - .Lockheed has received approval for shipping the irradiated fuel and control elements to Savannah River, with shipment tentativsly scheduled to commence May 17 and to be completed in June 1971. The 36 nenirradiated fuel elements
,
were shipped to Savannah River on May -6,1971. (See Section G.) _
i The AEC Division cf Technical Information (DTI) has tentatively agreed to purchase the two Lockheed tour reactors.1/ Lockheed will forward a letter to DRL requesting exemption to 1icensing requirements, due to pending
'
sale of the two reactors to the AEC. (See Management Interview.) An audit of the security program, including a tour by Compliance of a selected remote section of the exclusion fence disclosed no deficiencie (See Section B.)
. Procedures have not been developed for *cading the irradiated fuel and control elements into the spent core cask or cask handling. (See Management Interview and Sectics G.)
Management' Interview A formal management interview was not conducted at '
the termination of the inspection as the encire inspection and discussion was conducted in the presence of all parties concerned. However, a recap following the day's activities was ccnductsd by the inspectors with Dodd, Ham, and Westbrook. The following iteer were discussed: Ihe. item of nonecmpliance: Ham concurs with the inspector's findings that Lockheed is in noncompliance with the shutdown Technical Specifications i 1/ O'Reilly mem:randam dated' May 4,19713 subjects Lockheed Tour Reactors.
!
i
4
/
' . . +;;
, ,- - - , - - - . - - - - . . - - - _ - . . - . . -. . . . - . . - - - . _ -
_
_ _ . .
_
.
-3- .
'- .
' C0;Rpt. ' N34 50-172/71-1
. ersight of the weekly l filter
,
and stated that the noncompliance occurred as an ovHam requir amen and aralysis would .be reinitiate be issued for the The inspector informed Dodd that a Form AEC-592 would noncompliance ite Dodd stated that DTI has agreed upon a The status of the tour reactors: Also, Lockheed expects a letter of b t two week Also, purchase price for both reactors. intent this week and p '
Dodd Lockheed statedwill that the fuelaisletter forward stored to at DRL during the the pending weektransfer o
exemption to 10 CFR 70 licensing requirement due to
- of the two reactors oto the AE fuel elements and the lack of The pending shipmsnt of the irradiated Ham stated that procedures would be develop handling proceduress and that the Procedure Review Committee f thewo irradiated element procedures prior to the handling and chipping o
-
. ~
DETAI'yS
-_
A, Persons Contacted '
B. D. Dodd - Decommissioning Coordinator F. L. Amend - Reactor Supervisor Chief Health -Physicist M. M. Ham J. L. Jenkins - Health Physicist Security Lieutenant H. P. Turner Ad=ir.istrative Supervisor
- D. Westbrook Administration and Organisaticq Orzanisation and Pertennel f the f ormer reactor ,
The personnel remaining at the f acility consists i o(Jenkins),
urity forc Also, and supervisor (Amend), a dhealth physicist technic the chief health physicist (Ham) spen s apprstaff i augmented by other working time at the f acility with the s te d personnel f rom Lo:kheed (Marietta), as require .
4 Procedure kriitw Co-sitta functions and activities h L.Lb of the
'
A review of the Pr:cedure Rreisw C:=mittee's i
l L
j
-
~
_ .- , . . . _ , , _ _ . . ~ . _ _ _ _ _ . . _ . . . . . _ . , - . - - - . _ . _ . . . _ _ . . . _ _ _ _ . _ , - . . _ ,
r --
.
4-
' ' ' CO' Rpt . - N). - 50-172/71-1
'
.
- ~. flect
,
' Technical Specificacices are being fulfilled, i i.e., einutes ret procedures an a monthly meeting, quorum present, and pert nen activities are.being reviewe . Security :
dc Dodd stated, and the logb:oks reflect, that there i dhas been no re u 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> tion in the security force and that Thesecurity securityislogs mainta reflect, ne and it was
.per day, seven days per wee f the confirmed in discussions with Taylor, that a complete tour i o The -
exclusion security fence is being conducted on a weekly bas fence Compliance inspectors selected a remste se fence was being maintained in a satisf actory manne i s The Plant Security Operating Instruction Manual, March previding 5, inst
' for the security force, was reviewed by the Safety Committee on 11, 1971. The manual provides f or the'
1971, and implemented en March k patrol control of visitors, vehicles, empicyees, materials, cloc ER pool surveillance, fires, - radiation alarms, int rusio
.
- _
and the submittal of activity' ~ report ' Primary System l water l ;-
A review of'the records disclosed that sampling Specification 9. The gross beta-gacma activity ranged f ro 1
,
to 1.87 x 10' uCi/c the pH varied f rom 6.2 to Core and Internals d in the C. RER . The 56 fuel elater.ts and storage pool since *uly 29, 197 (See CO 8 Report c:ntrol No. elements h d The end baskets f rom the irradiated fusid elements No. FS-107, were in remov water saving in accordance with' an apprcved proce urs, f rom the ,
preparation f or transporting the irradiated fuel assemblies sit td 1)
The irradiated fusi siemen:s ar,d control alteents w
.
'
' by Tri-State out the elements will be transported to
which has been appreted by DUI:At the time of the inspection, a procedure i Du Pont at Savannah Rive .
- *
f
"
..
r 4b g .ef v
.,
irs
.
. . . - - . - . . . _ _ , . _ . . _ _ _ _ - , . - . _ . . . _ - . _ . _ _ , _ _ , _ . . . . . _ _ - . . - , . . _ . -
_
. ,
-5
C0 Rpt. No.-50-172/71-1
.
had not been developed for handlingwould thesebe irradiated developedfuel and elements, the but according to Dodd, a procedure and approve the Procedure Review Ccmaittee would review, comment, Subsequent to the inspect procedure prior to implementatio . 1971, Region II was informed that 24 feel elements were shipped on May another 24 shipped on June 1,1971, and the remaining elements are to be shipped on June 7,197 Thirty-eight nonitradiated fuel elements and five nonirradiated control -
rods were shipped to Oak Ridge, Tennessee, on May 6,1971, by the Home Transportation Company in aztended drums (one element per d and were shipped under protective signature.According to Dodd and Ham, Oak Ridge provided shipping instruction no nor. irradiated fuel eltmer.ts or control rods remain onsit The reactor core grid, control rod scram damper, holddown tank and shield tanks have been removed f rom the reactor vessel and stor The grid, scram damper, and holdd:wn tank are stored in the RER storage pool and the shield tanks are stored on the RER building floo The components were removed in accordance with appreved procedures, -
~
Nos. FS-105 and FS-10 Radiation Protection .
Personnel Monitoring A review of the TLD badge readings for 1970 shows that the highest exposures were received by personnel involved in work in the hot cell a re The level of exptsure to M:Cs111 ster was 3.450 rem, Harper was 3.645 res, and Mathieson was 3.815 rem. Ham stated that these exposures were reported to the AEC in accordance with 10 CFR 2 .40 The highest exposure to persennel since January 1,1971, was to a Cham-Nuclear employes (F. Beirle) and he supervisor The reactor received 0.490 rem during (Amend),
the handling of cobalt drum wast assigned permanently to the Lockheed site, had an exposure of 0.125 rem during the period of January 1,1971, through March 31, 197 , Environment 8 Air Sampling Paragraph C.2 of the Technical Specifications requires that filter samples from the particulate air sampler located at the entrance to the RER domineraliser building shall be collected C:ntrary and analysed to paragraph C.2, the weekly fcr gross alpha activit .
Y hh '~
+.. ~,
'
,. -
. C3 Rpt. No. 50-172/71-1 -6-
.
filter samples from the air sampler have been collected on a biweekly schedule since February 1,1971. A Form AEC-592 was issued on May 22, 1971 and a satisf actory response was received on June 2,1971. .
A review of the air sample recogs shows the anggysed data te have an activity range of 0.59 x 10- to 3.49 x 10-1 uCi/c . River Water Samelina
'
Sampling of the Etowah River water is being performed on a schedule
'of at least twice monthly in accordance with paragraph C.2 of the Technical Specifications. The results . indicate that the water sampled at the east perimeter fence 3600 feet f rom the RER f acility, has an activity range of 1.24 x 10 0 ot 3.39 x 10-8 uC1/c .The water semples taken from the west perimeter fence, 3600 feet from the RER f acility, has an activity range of 1.24 x 10-3 to 4.02 x 10-8 uCi/c . Venetation Samples Vegetation samples are be'ing collected on a quarterly schedule in-accordance with paragraph C.2 of the Technical Specification A review of the records indicates that the vegetables are being -
collected f rom four locations onsite and that the gross beta-samma activity ranged f rom 2.44 x 10-4 to 3.73 x 10-4 uct/s. Han stated that there had been no change in the vegetation sampling program f rom that which was performed during operation of the reacto . Soil Samples Sampling ~ of the act! f rom around the RER f acility is being accomplished at 32 locations, identified as rings A, B, C, and D, and does meet the requirements of paragraph C.2 of the Technical S pecificat ions. The data gleaned from the soil samples is as follows:
Ring A - 25 fe t fr9e RER, 7.02 x 10-5 to ,
2.31 x 10-* uCi/s Ring 3 - 125 f eet f rom RER, 5.46 x 10-5 go 8.06 x 10-3 uC1/3 Ring C 250 fest f rom RER, 4.42 x 10-5 to 9.92 x 10-3 uC1/3 Ring D - 500 feet from RER, 3.64 x 10-5 to 6.24 x 10* uCi/g
&f, 3: -
L
.
- *
.-
e C0 Rpt. No. 50-172/71-1 -7-
.
Han stated that there had been no change in the seil sampling program f rom that perf semsd while che reactor was operatin Miscellanseus Tentative Plans for the Site ,
Dodd stated that the City of Atlanta has an option to purchase the 11,000-acre site as a location for a second Atlanta airpor ~
Lockheed submitted a dec:=missioning plan tc DRL on April 12, 1971, requesting that the RER te censidcred decommissicned upon transfer of the reactor fuel and contrel rod drives to a licensed receiver and shipped f r:a the site. Pre:ently, the 'last shipment of fuel and Subsequently, Region II control rods is schedulad for June 7,197 was informed that CRL appreved the deccmmissicning plan on May 27, 197 A final reactor inspection by Ccspliance will be performed to verify that decommissionirs has been completed prior to the State of Georgia assuming responsibility for menitoring the decontamination of the facilit Han stated that the 130 grams of' scrap U 235 under AEC License No. SNM-260 will be disposed of by licensed burial. Airo, Lockheed has about 76,375 curies of cobalt and 36,314 curies of cerium on hand under a State of Georgia license. Radiation International, Incorporated, Parsippany, New Jersey (purchaser of Ramco), has applied for a license amendment to receive and pcssess beth the cesium and cobalt invento r Chen-Nuclear Services, Incorperated, Columbia, South Carolina, under contract to Lockheed, has transported 270 drums of cobalt waste containing 1,153.11 mil 11 curies te their Psrnsville, South Carolina, burial f acilit /
i