Special Insp Rept 50-172/71-02 on 710714.Major Areas Discussed:Decommissioning Plan & State License
ML20127F062
Person / Time
Site: 05000172
Issue date: 08/09/1971
From: Robert Lewis, Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20127E447 List:
References
FOIA-84-737 50-172-71-02, 50-172-71-2, NUDOCS 8505200309
Download: ML20127F062 (3)


See also: IR 05000172/1971002

Text

r

.

-

UNITED STATES

'

ATOMIC ENERGY COMMISSION

I

>

Je l

DIVISION OF COMPLIANCE:

-

+

REGION 11 - SutTE S18

230 PEACHTREE STREET, N OR T H w E ST

y m ,,,,g yirrYamr

AT LANT A, GEORGI A 30303

526-4503

INSPECTION REPORT

-

COfPLIANCE REPORT NO.: 71-02

IDCKHEED AIRCRAFT CORPORATION

Dawsonville, Georgia

License No.: R-86

Docket No.:

50-172

Category: E

Type of Licensee: ' RER - 3 Mwt

-

-

Type of Inspection: Special

Announced

Date-of Inspection: July 14, 1971

Date of Previous Inspection: May 19, 1971

Principal Inspector:

E. d.

7/

Date

R. C. 14wis, Reactor Inspector

(Operations)

Accompanying Inspector:

None

Other Accompanying Personnel:

None

fr f I/

'

Reviewed By:

2

~

'Date

'

erations)(/Genior Reaegr Inspector

. Seidle

Proprietary Information:

None

,

.

8505200309 841025

PDR

FDIA

BREMAN64-737

PDR

g

s

d E'

t

L

-

'

.

A

r.

,

,

?

.

. Lockheed 50-172/71-02

-2-

'

SECTION I'

ENFECEMENT ACTION:

None

UNUSUAL OCCURRENCES:

None

UNRESOLVED ITEMS: None

-

LICENSEE ACTION ON PREVIOUSLY IDENTIFIED ENFTCEMENT MATTERS

The particulate air sampler filter was not collected and analyzed on a weekly

schedule.

The weekly collection and analysis of the sampler filter was re-

established on May 19,1971 (letter R. B. Ormsby, Lockheed, to J. G. Davis,

Region II, dated June 2, 1971). The revised schedule was verified during

-_the inspection.

PERSONS CONTACTED

.,.

.-

..

B. D. Dodd - Decommissioning Coordinator

F. L. Amend - Reactor Supervisor

M. N. Ham - Chief Health Physicist

D. Westbrook - Administrative Su'pervisor-

MANAGEMENT INTERVIEW

Dodd and Ham were present and directly involved during the entire inspection

visit. At the conclusion of the inspection, the inspector informed Dodd

that the inspection verified that those actions required to be taken by

Lockheed in Sections B and D of the Decommissioning Plan had been completed.

Dodd stated that he would request DRL to terminate License No. R-86 and that,

concurrently, he would request that the State of Georgia issue a byproduct

license.

/

i

I

'U

_-

~

..

. . ,

.

Lockhe

50-172/71-02

-3-

SECTION II

Prepared By:

R. C. 14wis

-

ReactorInspector(Operations)

ADDITIONAL SUBJECTS INSPECTED, NOT IDENTIFIED IN SECTION I, WHERE NO

DEFICIENCIES m UNRESOLVED ITEMS WERE FOUND

1.

GENERAL

,

The inspection was an examination of the decommissioning activities conducted

at the 3 Mwt unshielded research reactor since May 19, 1971.-

The inspection consisted of a review of the shipping, transfer, and receipt

records of those components listed in Sections B and D of the Decommissioning

Plan, discussions with personnel,'and observation by the inspector.

2.

SHIPPING, TRANSFER, AND RECEIPT RECORDS

Fuel assembly records for 24 irradiated ' assemblies and 38 nonirradiated

a.

assemblies.

-

-

b.

Control assembly records for eight irradiated and five nonirradiated

control assemblies.

.

Radiation Effects Reactor, Shield Development Reactor, and Critical.

c.

Experiment Reactor records of thirteen control rod drives, seven regulating

rod drives, and three fission-counter drives.

3.

LOCKHEED TOUR REACTORS

The two 10 Kwt Iockheed tour reactors were purchased by the AEC Division of

Technical Information and relocated to Oak Ridge, Tennessee.

<

33

MY

+