Category:INSPECTION REPORT
MONTHYEARIR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation ML20197H6051998-12-0909 December 1998 Insp Rept 50-062/98-202 on 981116-19.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Licensee Organization,Operations & Maintenance Activities,Safegurads & Security Program & Matl Control & Accounting Program ML20197B8071998-03-0404 March 1998 Insp Rept 50-062/98-201 on 980126-28.Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program of This Class 1 Non Power Reactor Including Organization, Facilities & Equipment & Safety Committee Actions & Audits IR 05000062/19972011997-12-11011 December 1997 Insp Repts 50-062/97-201 & 50-396/97-201 on 971111-13.No Violations Noted.Major Areas inspected:on-site Review of Safety Program Including Organization & Staffing,Review & Audit Functions,Procedures & Radiation Protection Program IR 05000062/19970011997-05-15015 May 1997 Insp Rept 50-062/97-01 on 970414-17.No Violations Noted. Major Areas Inspected:Operations of Class I non-power Reactor,Including Organization,Maint,Audits,Design Changes, Operator Requalification,Operating Procedures ML20133F8781996-12-20020 December 1996 Insp Rept 50-062/96-03 on 961118-21.No Violations Noted. Major Areas Inspected:Review of Operational Readiness Status of Facility Emergency Preparedness Program IR 05000062/19960021996-11-26026 November 1996 Insp Rept 50-062/96-02 on 961105-06.No Violations Noted. Major Areas Inspected:Licensee Program for Control of Licensed Nuclear Matl IR 05000062/19930061994-01-12012 January 1994 Insp Rept 50-062/93-06 on Stated Date.No Violations Noted. Major Areas Inspected:Insp Conducted to Determine Whether Licensee Emergency Preparedness Program Maintained in State of Operational Readiness Since Last Insp IR 05000062/19930051993-12-20020 December 1993 Insp Rept 50-062/93-05 on 931129-30.No Violations Noted. Major Areas Inspected:Licensee Program to Repair & Seal Concrete Adjacent to Gate Around Large Access Facility in Reactor Pool IR 05000062/19930041993-12-0202 December 1993 Insp Rept 50-062/93-04 on 931101-04.No Violations Noted. Areas Inspected:Review of Radiation Protection Program Activities Including,Radiation Control,Environmental Surveillance & Monitoring IR 05000062/19930031993-08-18018 August 1993 Insp Rept 50-062/93-03 on 930726-30.No Violations or Deviations Noted.Major Areas Inspected:Operations of Class I non-power Reactor IR 05000062/19900031990-09-17017 September 1990 Insp Rept 50-062/90-03 & 50-396/90-03 on 900814-16.No Violations Noted.Major Areas Inspected:Radiation Control, Environ Surveillance & Monitoring & Transportation of Radioactive Matl IR 05000062/19900041990-09-13013 September 1990 Insp Rept 50-062/90-04 on 900820-23.Violations Noted.Major Areas Inspected:Annual Insp of Operations Activities at Class I Research Reactor & Followup of Open Items IR 05000062/19890021989-09-0707 September 1989 Partially Withheld Insp Rept 50-062/89-02 on 890816-17 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Safeguards Program for Nonpower Reactors,Including Physical Security Plan & Access Controls IR 05000062/19890011989-08-30030 August 1989 Insp Rept 50-062/89-01 on 890711-13.Violation Noted.Major Areas Inspected:Onsite Review of Radiation Protection Activities,Including Radiation Control Activities,Environ Surveillance & Monitoring & Actions Re Info Notices IR 05000062/19880041988-10-0404 October 1988 Insp Rept 50-062/88-04 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Annual Operations of Class I Research Reactors.One Issue Referred to NRR for Resolution IR 05000062/19880031988-09-28028 September 1988 Insp Rept 50-062/88-03 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Including Staff Organization,Training, Radiation Control & Surveillance Activities ML20154L2321988-09-13013 September 1988 Insp Rept 50-062/88-02 on 880809-11.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program Conducted in Areas of Emergency Facilities & Equipment, Training,Performance of Drills & Offsite Agency Support IR 05000062/19880011988-04-27027 April 1988 Insp Rept 50-062/88-01 on 880405-07.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program Areas,Including Radiation Control Activities,Environ Surveillance & Monitoring & Transportation Activities ML20236M4811987-08-0404 August 1987 Insp Rept 50-062/87-03 on 870706-08 & 15-17.Violations Identified.Major Areas Inspected:Review of Events Associated W/Potential Overexposure of Personnel in Licensee Neutron Radiography Facility IR 05000062/19870021987-06-0808 June 1987 Insp Rept 50-062/87-02 on 870526-28.No Violation or Deviation Noted.Major Areas Inspected:Radiation Control Environ Protection,Transportation of Radioactive Matls & Followup on Previous Enforcement Issues ML20214T0471987-06-0202 June 1987 Insp Rept 50-062/87-01 on 870518-20.No Violations or Deviations Observed.Major Areas Inspected:Licensee Action on Improvement Items Noted During 1985 Emergency Preparedness Appraisal Conducted on 850819-23 IR 05000062/19860031986-11-19019 November 1986 Insp Repts 50-062/86-03 & 50-396/86-02 on 861028-31.No Violation or Deviation Noted.Major Areas Inspected:Logs & Records,Review & Audit Functions,Requalification Training, Procedures,Refueling & Surveillance & Maint IR 05000062/19860021986-08-22022 August 1986 Partially Withheld Insp Repts 50-062/86-02 & 50-396/86-01 on 860806-07 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted. Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events ML20204K0991986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures IR 05000062/19860011986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures IR 05000062/19850031985-12-0505 December 1985 Insp Repts 50-062/85-03 & 50-396/85-01 on 851106-08.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations & Operating Records,Staff Organizations & Svcs, Including Audit Functions & Training ML20133Q2531985-10-0404 October 1985 Insp Rept 50-062/85-02 on 850819-23.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness IR 05000062/19850011985-08-0707 August 1985 Insp Rept 50-062/85-01 on 850722-26.Violation & Deviation Noted:Failure to Establish & Adhere to Radiation Control Procedures & Failure to Replace Survey Instrument W/Audible Rate Indicating Survey Meter 1999-05-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation ML20197H6051998-12-0909 December 1998 Insp Rept 50-062/98-202 on 981116-19.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Licensee Organization,Operations & Maintenance Activities,Safegurads & Security Program & Matl Control & Accounting Program ML20197B8071998-03-0404 March 1998 Insp Rept 50-062/98-201 on 980126-28.Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program of This Class 1 Non Power Reactor Including Organization, Facilities & Equipment & Safety Committee Actions & Audits IR 05000062/19972011997-12-11011 December 1997 Insp Repts 50-062/97-201 & 50-396/97-201 on 971111-13.No Violations Noted.Major Areas inspected:on-site Review of Safety Program Including Organization & Staffing,Review & Audit Functions,Procedures & Radiation Protection Program IR 05000062/19970011997-05-15015 May 1997 Insp Rept 50-062/97-01 on 970414-17.No Violations Noted. Major Areas Inspected:Operations of Class I non-power Reactor,Including Organization,Maint,Audits,Design Changes, Operator Requalification,Operating Procedures ML20133F8781996-12-20020 December 1996 Insp Rept 50-062/96-03 on 961118-21.No Violations Noted. Major Areas Inspected:Review of Operational Readiness Status of Facility Emergency Preparedness Program IR 05000062/19960021996-11-26026 November 1996 Insp Rept 50-062/96-02 on 961105-06.No Violations Noted. Major Areas Inspected:Licensee Program for Control of Licensed Nuclear Matl IR 05000062/19930061994-01-12012 January 1994 Insp Rept 50-062/93-06 on Stated Date.No Violations Noted. Major Areas Inspected:Insp Conducted to Determine Whether Licensee Emergency Preparedness Program Maintained in State of Operational Readiness Since Last Insp IR 05000062/19930051993-12-20020 December 1993 Insp Rept 50-062/93-05 on 931129-30.No Violations Noted. Major Areas Inspected:Licensee Program to Repair & Seal Concrete Adjacent to Gate Around Large Access Facility in Reactor Pool IR 05000062/19930041993-12-0202 December 1993 Insp Rept 50-062/93-04 on 931101-04.No Violations Noted. Areas Inspected:Review of Radiation Protection Program Activities Including,Radiation Control,Environmental Surveillance & Monitoring IR 05000062/19930031993-08-18018 August 1993 Insp Rept 50-062/93-03 on 930726-30.No Violations or Deviations Noted.Major Areas Inspected:Operations of Class I non-power Reactor IR 05000062/19900031990-09-17017 September 1990 Insp Rept 50-062/90-03 & 50-396/90-03 on 900814-16.No Violations Noted.Major Areas Inspected:Radiation Control, Environ Surveillance & Monitoring & Transportation of Radioactive Matl IR 05000062/19900041990-09-13013 September 1990 Insp Rept 50-062/90-04 on 900820-23.Violations Noted.Major Areas Inspected:Annual Insp of Operations Activities at Class I Research Reactor & Followup of Open Items IR 05000062/19890021989-09-0707 September 1989 Partially Withheld Insp Rept 50-062/89-02 on 890816-17 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Safeguards Program for Nonpower Reactors,Including Physical Security Plan & Access Controls IR 05000062/19890011989-08-30030 August 1989 Insp Rept 50-062/89-01 on 890711-13.Violation Noted.Major Areas Inspected:Onsite Review of Radiation Protection Activities,Including Radiation Control Activities,Environ Surveillance & Monitoring & Actions Re Info Notices IR 05000062/19880041988-10-0404 October 1988 Insp Rept 50-062/88-04 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Annual Operations of Class I Research Reactors.One Issue Referred to NRR for Resolution IR 05000062/19880031988-09-28028 September 1988 Insp Rept 50-062/88-03 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Including Staff Organization,Training, Radiation Control & Surveillance Activities ML20154L2321988-09-13013 September 1988 Insp Rept 50-062/88-02 on 880809-11.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program Conducted in Areas of Emergency Facilities & Equipment, Training,Performance of Drills & Offsite Agency Support IR 05000062/19880011988-04-27027 April 1988 Insp Rept 50-062/88-01 on 880405-07.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program Areas,Including Radiation Control Activities,Environ Surveillance & Monitoring & Transportation Activities ML20236M4811987-08-0404 August 1987 Insp Rept 50-062/87-03 on 870706-08 & 15-17.Violations Identified.Major Areas Inspected:Review of Events Associated W/Potential Overexposure of Personnel in Licensee Neutron Radiography Facility IR 05000062/19870021987-06-0808 June 1987 Insp Rept 50-062/87-02 on 870526-28.No Violation or Deviation Noted.Major Areas Inspected:Radiation Control Environ Protection,Transportation of Radioactive Matls & Followup on Previous Enforcement Issues ML20214T0471987-06-0202 June 1987 Insp Rept 50-062/87-01 on 870518-20.No Violations or Deviations Observed.Major Areas Inspected:Licensee Action on Improvement Items Noted During 1985 Emergency Preparedness Appraisal Conducted on 850819-23 IR 05000062/19860031986-11-19019 November 1986 Insp Repts 50-062/86-03 & 50-396/86-02 on 861028-31.No Violation or Deviation Noted.Major Areas Inspected:Logs & Records,Review & Audit Functions,Requalification Training, Procedures,Refueling & Surveillance & Maint IR 05000062/19860021986-08-22022 August 1986 Partially Withheld Insp Repts 50-062/86-02 & 50-396/86-01 on 860806-07 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted. Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events ML20204K0991986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures IR 05000062/19860011986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures IR 05000062/19850031985-12-0505 December 1985 Insp Repts 50-062/85-03 & 50-396/85-01 on 851106-08.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations & Operating Records,Staff Organizations & Svcs, Including Audit Functions & Training ML20133Q2531985-10-0404 October 1985 Insp Rept 50-062/85-02 on 850819-23.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness IR 05000062/19850011985-08-0707 August 1985 Insp Rept 50-062/85-01 on 850722-26.Violation & Deviation Noted:Failure to Establish & Adhere to Radiation Control Procedures & Failure to Replace Survey Instrument W/Audible Rate Indicating Survey Meter 1999-05-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000062/19992011999-05-0606 May 1999 Insp Rept 50-062/99-201 on 990414-16.No Violations Noted. Major Areas Inspected:Radiation Protection & Transportation ML20197H6051998-12-0909 December 1998 Insp Rept 50-062/98-202 on 981116-19.Violations Noted. Major Areas Inspected:Review of Selected Aspects of Licensee Organization,Operations & Maintenance Activities,Safegurads & Security Program & Matl Control & Accounting Program ML20197H5811998-12-0909 December 1998 Notice of Violation from Insp on 981116-19.Violation Noted: Shipping Papers &/Or Label for Various Radioactive Material Shipments Not Completed as Required ML20197B7961998-03-0404 March 1998 Notice of Violation from Insp on 980126-28.Violation Noted: in 1997 Evacuation Alarm Was Tested on 970122 & 0411,but Was Not Tested Again in 1997 as Required.Alarm Was Also Not Tested During Recent Emergency Exercise on 980113 ML20197B8011998-03-0404 March 1998 Notice of Deviation from Insp Rept on 980126-28.Deviation Noted:Licensee Did Not Revise Emergency Plan Implementing Procedures & No Rev Were Presented to Reactor Safety Committee for Review & Approval by 970701 ML20197B8071998-03-0404 March 1998 Insp Rept 50-062/98-201 on 980126-28.Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program of This Class 1 Non Power Reactor Including Organization, Facilities & Equipment & Safety Committee Actions & Audits IR 05000062/19972011997-12-11011 December 1997 Insp Repts 50-062/97-201 & 50-396/97-201 on 971111-13.No Violations Noted.Major Areas inspected:on-site Review of Safety Program Including Organization & Staffing,Review & Audit Functions,Procedures & Radiation Protection Program IR 05000062/19970011997-05-15015 May 1997 Insp Rept 50-062/97-01 on 970414-17.No Violations Noted. Major Areas Inspected:Operations of Class I non-power Reactor,Including Organization,Maint,Audits,Design Changes, Operator Requalification,Operating Procedures ML20133F8781996-12-20020 December 1996 Insp Rept 50-062/96-03 on 961118-21.No Violations Noted. Major Areas Inspected:Review of Operational Readiness Status of Facility Emergency Preparedness Program IR 05000062/19960021996-11-26026 November 1996 Insp Rept 50-062/96-02 on 961105-06.No Violations Noted. Major Areas Inspected:Licensee Program for Control of Licensed Nuclear Matl IR 05000062/19930061994-01-12012 January 1994 Insp Rept 50-062/93-06 on Stated Date.No Violations Noted. Major Areas Inspected:Insp Conducted to Determine Whether Licensee Emergency Preparedness Program Maintained in State of Operational Readiness Since Last Insp IR 05000062/19930051993-12-20020 December 1993 Insp Rept 50-062/93-05 on 931129-30.No Violations Noted. Major Areas Inspected:Licensee Program to Repair & Seal Concrete Adjacent to Gate Around Large Access Facility in Reactor Pool IR 05000062/19930041993-12-0202 December 1993 Insp Rept 50-062/93-04 on 931101-04.No Violations Noted. Areas Inspected:Review of Radiation Protection Program Activities Including,Radiation Control,Environmental Surveillance & Monitoring IR 05000062/19930031993-08-18018 August 1993 Insp Rept 50-062/93-03 on 930726-30.No Violations or Deviations Noted.Major Areas Inspected:Operations of Class I non-power Reactor ML20056D2431993-07-23023 July 1993 EN-93-073:on 930728,notice of Proposed Imposition of Civil Penalty in Amount of $2,000 Issued to Licensee.Action Based on Operation of UVAR for Approximately 5 1/2 H W/O Number of Scram Safety Channels Being Operable ML20059M8911990-09-24024 September 1990 Notice of Violation from Insp on 900820-23.Violation Noted:Failure to Audit Univ of Virginia Reactor Log from Oct 1985 - Jan 1990 IR 05000062/19900031990-09-17017 September 1990 Insp Rept 50-062/90-03 & 50-396/90-03 on 900814-16.No Violations Noted.Major Areas Inspected:Radiation Control, Environ Surveillance & Monitoring & Transportation of Radioactive Matl IR 05000062/19900041990-09-13013 September 1990 Insp Rept 50-062/90-04 on 900820-23.Violations Noted.Major Areas Inspected:Annual Insp of Operations Activities at Class I Research Reactor & Followup of Open Items IR 05000062/19890021989-09-0707 September 1989 Partially Withheld Insp Rept 50-062/89-02 on 890816-17 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Safeguards Program for Nonpower Reactors,Including Physical Security Plan & Access Controls IR 05000062/19890011989-08-30030 August 1989 Insp Rept 50-062/89-01 on 890711-13.Violation Noted.Major Areas Inspected:Onsite Review of Radiation Protection Activities,Including Radiation Control Activities,Environ Surveillance & Monitoring & Actions Re Info Notices ML20247B4731989-08-30030 August 1989 Notice of Violation from Insp on 890711-13.Violation Noted: Failure to Conduct Adequate Surveys to Evaluate Extent of Radiation Hazards Present in That Lower Limit of Detection Exceeded MPC in Jan-June 1989 IR 05000062/19880041988-10-0404 October 1988 Insp Rept 50-062/88-04 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Annual Operations of Class I Research Reactors.One Issue Referred to NRR for Resolution IR 05000062/19880031988-09-28028 September 1988 Insp Rept 50-062/88-03 on 880822-25.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Including Staff Organization,Training, Radiation Control & Surveillance Activities ML20154L2241988-09-14014 September 1988 Notice of Violation from Insp on 880809-11.Violation Noted: All Personnel Expected to Respond in Event of Emergency Not Trained as Required ML20154L2321988-09-13013 September 1988 Insp Rept 50-062/88-02 on 880809-11.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program Conducted in Areas of Emergency Facilities & Equipment, Training,Performance of Drills & Offsite Agency Support IR 05000062/19880011988-04-27027 April 1988 Insp Rept 50-062/88-01 on 880405-07.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program Areas,Including Radiation Control Activities,Environ Surveillance & Monitoring & Transportation Activities ML20196G7741988-03-0808 March 1988 EN-87-090A:on 880308,notice of Proposed Imposition of Civil Penalty in Amount of $1,250 Issued to Licensee Based on Withdrawal of One Violation & Licensee Extensive Corrective Action ML20236M9571987-10-26026 October 1987 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500.Noncompliance Noted:Licensee Failed to Make Surveys Necessary to Identify High Radiation Area in Neutron Radiograhpy Facility & to Post Signs Properly ML20236F8291987-10-21021 October 1987 EN-87-090:on 871026,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500 Will Be Issued to Licensee Based on Several Violations,Including Failure to Perform Surveys to Identify High Radiation Area ML20235V5681987-10-0505 October 1987 Exam Rept 50-062/OL-87-01 on 870914-16.Exam Results:Two Reactor Operators Passed & One Failed Written & Operating Exams ML20236M4811987-08-0404 August 1987 Insp Rept 50-062/87-03 on 870706-08 & 15-17.Violations Identified.Major Areas Inspected:Review of Events Associated W/Potential Overexposure of Personnel in Licensee Neutron Radiography Facility IR 05000062/19870021987-06-0808 June 1987 Insp Rept 50-062/87-02 on 870526-28.No Violation or Deviation Noted.Major Areas Inspected:Radiation Control Environ Protection,Transportation of Radioactive Matls & Followup on Previous Enforcement Issues ML20214T0471987-06-0202 June 1987 Insp Rept 50-062/87-01 on 870518-20.No Violations or Deviations Observed.Major Areas Inspected:Licensee Action on Improvement Items Noted During 1985 Emergency Preparedness Appraisal Conducted on 850819-23 ML20210C2531986-12-23023 December 1986 Exam Rept 50-062/OL-86-02 on 861014.Exam Results:One Candidate Administered Written Exam & Passed.Senior Reactor Operator Exam Questions & Answer Key Encl IR 05000062/19860031986-11-19019 November 1986 Insp Repts 50-062/86-03 & 50-396/86-02 on 861028-31.No Violation or Deviation Noted.Major Areas Inspected:Logs & Records,Review & Audit Functions,Requalification Training, Procedures,Refueling & Surveillance & Maint IR 05000062/19860021986-08-22022 August 1986 Partially Withheld Insp Repts 50-062/86-02 & 50-396/86-01 on 860806-07 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted. Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events ML20204K0741986-07-30030 July 1986 Notice of Violation from Insp on 860527-29 ML20204K0991986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures IR 05000062/19860011986-07-15015 July 1986 Insp Rept 50-062/86-01 on 860527-29.Violation Noted:Failure to Perform Radiation & Contamination Surveys on Radioactive Matls Shipment & to Prescribe Activities Affecting Quality in Written Procedures ML20205A6101986-06-30030 June 1986 Exam Rept 50-062/OL-86-01 on 860513.Exam Results:One Candidate Passed Oral Exam,One Candidate Passed Written Exam & One Candidate Failed Written Exam IR 05000062/19850031985-12-0505 December 1985 Insp Repts 50-062/85-03 & 50-396/85-01 on 851106-08.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations & Operating Records,Staff Organizations & Svcs, Including Audit Functions & Training ML20133Q2531985-10-0404 October 1985 Insp Rept 50-062/85-02 on 850819-23.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness ML20134J5911985-08-13013 August 1985 Notice of Violation from Insp on 850722-26 ML20134J6021985-08-13013 August 1985 Notice of Deviation from Insp on 850722-26 IR 05000062/19850011985-08-0707 August 1985 Insp Rept 50-062/85-01 on 850722-26.Violation & Deviation Noted:Failure to Establish & Adhere to Radiation Control Procedures & Failure to Replace Survey Instrument W/Audible Rate Indicating Survey Meter ML20151X7541977-09-23023 September 1977 PNO-77-167:leak Was Found in Reactor Pool.Leak Was Indicated by Need for Increased Makeup Water to Maintain Constant Pool Depth.Leak Was Also Found in Fuel Assembly.Pool Was Repaired 1999-05-06
[Table view] |
Text
,
a Cree UNITED STATES f *o
- ,'
NUCLEAR REGULATORY COMMISSION
[ REGloN 11 g j 101 MARIETTA STREET, * ATLANTA, GEORGI A 30323
'c
\..**/
+
Report Nos.: 50-62/85-03 and 50-396/85-01 Licensee: University of Virginia Charlottesville, VA 22901 Docket Nos.: 50-62 and 50-396-Facility Name: University of Virginia Reactor UVAR and Cavalier Inspection Conducted: November 8, 1985 Inspectors: / r M /z/u /Ir r~Signed D . ' 'J . rke,"denior Resident Inspector - Surry [ Tat'e i _u -
ranch,'denior Resident Inspector -
~ Lt/S)35
~
M. W Date Signed f rth A -
Approved by: . ' \.
P. E. Fredrickson, Section thief
'--
/ [L[YM Tate $1gned Division of Reactor Projects l
SUMMARY
! Scope: This routine, unannounced inspection entailed 33 inspector-hours onsite I
I in the areas of plant operations and operating records, staff organizations and services including audit functions and training, research reactor procedures, surveillances, and refueling records, reactor experiments, and licensee action on l previous item Results: In the areas inspected, no violations or deviations were identifie . ~ . .
P B512240097 85120602 PDR ADOCK 050
- - _ . . . _ _ _ _ _ _ _ _ _ _ - . - - --.
s,
.
REPORT DETAILS Persons Contacted Licensee Employees
- T. G. Williamson, Chairman, Nuclear Engineering and Engineering Physics Department
- R. V. Mulder, Director, Nuclear Reactor Facility J. P. Farrar, Reactor Supervisor i *P. E. Benneche, Reactor Operations Supervisor B. Hosticka (SRO), and Other Reactor Operators l
" Attended exit interview Exit Interview The inspection scope and findings were summarized on November 8, 1985, with those perseas indicated in paragraph.1 above. The licensee did not identify as proprietary any of the materials provided to or reviewed by the ;
inspectors during this inspectio . Licensee Action on Previous Enforcement Matters l
This subject was not addressed in the inspectio ' Unresolved Items Unresolved items were not. identified during this inspectio . Plant Operations and Operating Record The inspectors examined the operating logs for 1984 and 1985 to verify that significant operations and maintenance activities were properl documented and reviewe In addition, the inspectors observed the completion 'of various pre-startup checklists and tests on Novembe'r 7, 1985, in accordance with S0P 4-1 prior to ~the. UVAR reactor startu .
Several Safety System and Measuring channels in TS Tables 3.1. and were demonstrated to be operable by channel displays and initiation of SCRAM trips when setpoints were exceeded during the pre-startup checklist and testings. ' The inspectors also witnessed the ' closure of
- the personnel door and ventilation exhaust duct during -the bridge radiation monitor alarm testing, to ensure confinement capability. The inspectors then observed the approach to criticality and power operatt er: of the .UVA At 9:55 a.m., the UVAR = went critical; the control rod critical positions 'were 12.72 inches (Reg Rod approx.11 inches), or one inch above the minimum critical rod positions, ensuring adequate shutdown margin on core configuration 15 ;
k_____._.____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . - - _ _ _ - - -
_
___ _ _ _ _ _ _ - _ _ _ _ _ - _ ._- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. .
.
O
Staffing of the facility during operations was also certified to be in accordance with Technical Specifications (TS) 6.1.3. Within the areas inspected, no violations were identifie The inspectors did recommend that the labeling and identification of control room equiptrent be reviewed for improvement; the Rabbit radiation monitor picoammeter, for example, had no identification tags or setpoint marks, although the alarm setpoint (240 mr/hr underwater)
was properly verified prior to use. Open Item (62/85-03-01), Label and identify control room equipment, including setpoints, b. During review of the latest Annual Report, dated January 24, 1985, the inspectors noted in the maintenance section that a leak occurred in the primary coolant system (pool) demineralizer piping on July 19, 1984; the piping was epoxyed and returned to service. On September 29, 1984, the leak reoccurred overnight and resulted in the loss of some 3,000 gallons (approx. one foot) of. pool water into the demineralizer and heat exchanger room before the system was isolated. The piping between the pump and filter was replaced and no subsequent leakage has l
occurre The low pool level automatic isolation was also reset to activate at two inches rather than one foot. During the inspection of the demineralizer piping, the inspectors noted that various materials were used in the demineralizer and recirculation piping (e.g., plastic, aluminum, and cast piping and elbows). The original specifications for both the system design and the system materials could not be located by the licensee. Although the -system operates at low pressures (e.g. ,15 to 20 psig), and is automatically isolated by low pool level, the l inspectors requested that some analysis of the system piping be l performed to verify its integrity under all operating conditions, and to specify piping materials if replacements become necessary. Open ,
Item (62/85-03-02), Analyze demineralizer piping for material l specification l, The inspectors also noted that several nuclear instrumentation detectors and connectors were replaced or rebuilt during the year (e.g., power range channel 2 detector replaced three times), and recommended that an engineering review be performed to determine the l cause of failures, and if appropriate, a cost benefit analysis be ;
considered to reduce the failure rates with upgraded equipment or- ,
repair In addition, the UVAR reactor experienced some 60 unplanned :
shutdowns or reactor SCRAMS ' during 1984. Many were caused by l
'
instrument noise on power range channel 2, or NI or RM detector response to fuel movement The inspectors recommended that the i'
licensee review the shutdowns to determine if corrective actions can be taken on generic trip initiator Open Item (62/85-03-03), SCRAM reduction progra i n
w_ _ _ _- _ -
__ ___-- - - . - _ .
%
.
I 3 l l
\
i The inspectors also noted that a few UVAR SCRAMS were missing from the Unplanned Shutdown list .in Section 6 of the 1984 Annual Report (e.g. ,
7/18/84, 8/28.84, 10/20/84, 11/28/84 SCRAMS), although they were properly listed in the logbooks and on the Master list which is retyped into the Annual Report. The licensee is submitting a supplement'to the Report for the missing emergency shutdowns and SCRAMS, as well as the corrective action taken to ensure compliance with TS 6.6.2(4). Open Item (62/85-03-04), Correct SCRAM listing in 1984 Annual Repor A routine tour and inspection was made on the Cavalier reactor also; no violations were identified.
l
' (Closed) Open Item (50-62/85-03-01), A licensee review of the SAR was completed prior to January 31, 1984, and resulted in the updating of the document. For example, the new curved plate fuel is now described in the SAR. This item is closed. .
6. . Procedures The inspectors verified that the content and scope of the facility procedures were adequate to control safety-related operations, and that an effective procedural control system had been establishe Significant expansions in the Emergency and Health Physics procedures have occurred over the past 18 month The inspectors also verified that appropriate procedures were used by the operators and staff during testing and manipulation -of the reactor control Specific inspector comments on procedures may be found in paragrapns 5.a and Within the areas inspected, no violations were identifie . Sur'veillance Testing The inspectors examined the licensee's surveillance and testing programs to ensure procedural adequacy and to verify that periodic testing and calibrations. are being conducted in accordance with the Technical Specifications surveillance requirement The performance of various pre-startup checklists and tests were observed as described in paragraph of this repor In addition, the inspectors reviewed certain calibration and testing records completed over the past 18 months which included the following: Rod drop tests and visual ' inspections; the inspectors noted that control rod 3 magnet current was less than half the amperage through
- CRs 1 and 2, due to a new armatur However, the magnet release and rod drop times of all rods were within the TS requirement Primary Coolant-System Flow instrumentatio Emergency Core Spray System flow testin . Pool level instrumentation:
____ _ . . _ _ . . _ . . . . . . . . . - . . . _ . _ . . _ . . _ . . . .
.
.
. Pool level / demineralize system trip verificatio Power Range #2 calibration Primary heat balance calculations and correlation checks with nuclear instrumentatio Primary coolant conductivity and p Within the areas inspected, no violations were identified. The inspectors did recommend that the Radiation Monitoring Systems (RMS) calibration procedures (7.2), be expanded to include additional instructions and acceptance criteria; the procedure currently refers to the vendors manuals for calibration and maintenance of the detectors and channels (e.g., Bridge RMS). Open Item (62/85-03-05), Upgrade RMS calibration procedure . Review and Audit Function The inspectors reviewed the 1984 and 1985 Reactor Safety Committee (RSC)
meeting minutes and verified the following:
-
Qualification of personnel satisfied those specified in Technical Specifications (TS) and the Committee Charter
-
.A quorum was present and meeting frequencies satisfied TS requirement Although few design changes were made to the facility in the 1984-1985 time frame, one major modification was reviewe The modification reviewed involved the installation of a pneumatic rabbit system for the delivery of experiments in and out of the UVAR reactor. The inspectors found that the Safety Evaluation as well as the RSC review of the modification was detailed and provided an excellent basis for determination of the safety implications of the modifications. The inspectors did note, however, that the checklist discussed in the Quality _ Assurance Program Description (QAPD) was not utilized for this modification. Although no formal commitment to utilize this checkli st could be found, the inspectors did recommend that the checklist be used for review of modifications since it provides a sound basis for making the 10 CFR 50.59 safety determinatio The inspectors did identify one item of concern which involved the blanket '
approval given by the RSC on April 17, 1979, or :ff re configuration changes; the operating staff has interpreted this Spe eval to mean that core configuration changes may be made wit M te 3r committee approva Specifically, the operating staff frequuJt y w core configuration changes without prior committee approval providw.g tem change is similar to one previously used and providing that excess reactivity and shutdown margin are verified to be within TS limit The committee is provided with an information copy of the core changes made as well as the excess reactivity
,
a l
!
L_
.. . . _
..
.
and shutdown margin measurements made.~after ' loadin The inspectors reviewed Section 5 of the UVAR TS and determined that freedom to safely change core configurations, providing excess reactivity and shutdown margin are within limits, is a design feature of the reacto However, the inspectors requested that the RSC review this matter to determine if a pre-established safety envelope should be provided by the RSC to the operating staff to ensure that core configurations have been previously used or properly reviewed prior to operation Open Item (62/85-03-06),
Consideration of a safety envelope for various core configuration change . Experiments
'
Durir.g inspection of the 1984 and 1985 RSC meeting minutes, the inspectors !
reviewed several new non-routine experiments that had been approved. One i such experiment dealt with the irradiation of gem stones for the purpose of !
improving their luster qualit The experiment was approved prior to i accomplishment as required by TS and the accompanying safety analysis contained sufficient detail to make a hazard.s determination. Additionally,
- the inspectors verified that experiments were evaluated as to whether they should be fixed to the core or movable and that reactivity limits had been i established. on movable experiments. The rabbit facility was also reviewed i
'
as discussed in paragraph ,
No violations or deviations were identifie '
I
-
.
.
>
I i t
.
!
!
!
i t
a
.