IR 05000213/1995027

From kanterella
Revision as of 12:42, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 96-100 W/Util on 961204 to Discuss Violations Documented Under NRC Insp Repts 50-213/95-27,96-201,96-06 & 96-08 Relating to Licensing Design Basis & Corrective Action Program
ML20135A904
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/14/1996
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
96-100, EA-96-001, EA-96-1, EA-96-334, EA-96-337, EA-96-338, EA-96-339, EA-96-340, EA-96-407, EA-96-440, NUDOCS 9612040090
Download: ML20135A904 (3)


Text

_ _ . . _

a.~. .

,

.

i EA Nos.96-001, 96-340, i

!- 96-339, 96-338,96-337, !

!96-334, 96-407,96-440 !

!  !

i

- November 14,1996 MN No.96-100, l Revision 2 i  !

{ NUCLEAR REGULATORY COMMISSION REGION I +

'

t

'

.

NOTICE OF SIGNIFICANT LICENSEE MEETING i

Licensee: Connecticut Yankee Atomic Power Company (CYAPCO) s Facility: Haddam Neck Docket No.: 50-213 i Time and Date: 9:00 a.m., Wednesday, December 4,1996 Location: Millstone Simulator and Training Facility Rope Ferry Road (Route 156)

Waterford, CT 06385 Purpose: Predecisional Enforcement Conference to discuss violations documented under NRC Inspection Reports (irs) 50-213/95-27,96-201,96-06, and 96-08 relating to Licensing Design Basis and Corrective Action Program, IR 50-213/96-07 relating to Emergency Preparedness Weaknesses, and IR 50-213/96-80 relating to the Augmented Inspection Team findings during its review of four events including the Nitrogen Bubble in the Reactor Head even NRC Attendees: H. Miller, Regional Administrator - Region 1 R. Cooper, Director - Division of Reactor Projects (DRP)

J. Rogge, Chief, Projects Branch 8 - DRP  !

J. Wiggins, Director - Division of Reactor Safety i W. Raymond, Senior Resident inspector - Haddam Neck, DRP .!'

M. Virgilio, Deputy Director, Division of Inspection and Support Programs, NRR P. McKee, Deputy Director for Licensing, Special Projects Office (SPO), Office of Nuclear Reactor Regulation (NRR) l S. Dembek, Haddam Neck Project Manager, SPO, NRR l

.CY Attendees: T. Feigenbaum, Vice President and Chief Nuclear Officer, NUSCO-G. LaPlatney, Haddam Neck Unit Director, CYAPCO I J. Hazeltine, Director, Engineering, CYAPCO P. Stroup, Director, Emergency Planning, NUSCO G. van Noordennen, Manager, Nuclear Licensing, NUSCO 9612040090 961114 PDR ADOCK 05000213 \

'

G PDR 6-

. .

,

Meeting Notice 96-100 2 Note: This meeting is open for public observation. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known by November 30,1996, via telephone call to J. F. Rogge, Region 1 at (610)

337-514 l ORIGINAL SIGNED BY:

Approved by:

John F. Rogge, Chief Projects Branch 8 Division of Reactor Projects DISTRIBUTION:

T. C. Feigenbaum, Executive Vice President and Chief Nuclear Officer - Northeast Utilities Service Company State of Connecticut SLO PUBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRM Division Secretary, RI i Region i Receptionist '

i l

I i

. .

.

Meeting Notice 96-100 3 Distribution (via E-Mail):

J. Taylor, Executive Director for Operations (

3 J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, DER H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and i Operations Support, DEDS

, B. Grimes, Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR

,

J. Lieberman, Director, Office of Enforcement F. Miraglia, Director, Office of Nuclear Reactor Regulation A. Thadani, Associate Director for Technical Review, NRR R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - 1/11, NRR

. W. Dean, Regional Coordinator, OEDO

N. Green, Jr., DRA, RES P. McKee, Deputy Director for Licensing, Special Projects Office (SPO), NRR S. Dembek, Haddam Neck Project Manager, SPO, NRR

D. Screnci, Public Affairs Officer, RI

N. Sheehan, Field Public Affairs Officer, RI W. Raymond, DRP M. Campion, ORA D. Chawaga, ORA

>

DOCUMENT NAME: G:\ BRANCH 8\ MEETINGS \HN11-4.EFC To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =

Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP Rl/DRP l / l NAME ELConner M(d JFRogge // V

' ~

DATE 11/13/96 11/[)96 '

OFFICIAL RECORD COPY