ML20129E938
| ML20129E938 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 09/17/1996 |
| From: | Rogge J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 96-94, NUDOCS 9610010203 | |
| Download: ML20129E938 (3) | |
Text
1
\\
September 17, 1996 No. 96-94 i
U.S. NUCLEAR REGULATORY COMMISSION l
REGION I NOTICE OF LICENSEE MEETING i
Licensee:
Connecticut Yankee Atomic Power Company Facility:
Haddam Neck Docket No.:
50-213 l
l Time and Date:
10:00 a.m., Wednesdey, October 2,1996 3
Location:
Connecticut Yankee Energy information Center l
362 Injun Hollow Rd Haddam Neck, CT 06424
]
Purpose:
This is an exit meeting to discuss the results of the Augmented 2.
Inspection Team (AIT) that concluded the onsite review on Septernber 17,1996. The AIT reviewed four events related to l
reactor coolant inventory control, including the nitrogen inclusion event, and the contingency plans for reliable reactor cooling following the failure of one RHR pump.
NRC Attendees:
H. Miller, Regional Administrator J. Wiggins, Director, Division of Reactor Safety (DRS) i J. Trapp, Team Leader, DRS W. Raymond, Senior Resident inspector, Haddam Neck J. Rogge, Chief, Projects Branch 8, Division of Reactor Projects (DRP)
P. McKee, Director, Northeast Utilities Project Directorate 1-4, Office of Nuclear Reactor Regulation (NRR)
S. Dembek, Project Manager for Haddam Neck, NRR Licensee Attendees:
Jere J. LaPlatney, Nuclear Unit Director Douglas McCracken, Acting Operations Manager Pierre F. L'Heureux, Nuclear Safety and Oversight Manager
\\p Anthony Callendrello, Manager, Nuclear Licensing Jerry VanNoordennen, Supervisor, Nuclear Licensing et. al.
/
Lh 6
9610010203 960917 PDR ADOCK 05000213 0
PDR w
i Meeting Notice 96-94 2
4 4
i Note: This meeting is open for public observation. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known by October 1,1996, via telephone call to J. Rogge, Region I, at (610)337-5146.
l ORIGINAL SIGNED BY:
EBEN L CONNER FOR:
I Approved By:
i John F. Rogge, Chief Projects Branch 8
]
Division of Reactor Projects i.
cc:
2-Mr. Ted C. Feigenbaum, Executive Vice President - Nuclear i
Northeast Utilities Service Company State of Connecticut 1
I l
t l
l l
Meeting Notice 96-94 3
Distribution:
PUBLIC i
Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI
)
DRM Division Secretary, RI i
Region i Receptionist Distribution (via E-Mail):
J. Taylor, Executive Director for Operations J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DER)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. Grimes, Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement S. Lewis, Office of General Counsel (OGC)
W. Russell, Director, Office of Nuclear Reactor Rep,!ation A. Thadani, Associate Director for Technical Rev!w, NRR R. Zimmerman, Associate Director for Projecis, NRR S. Varga, Director, Division of Reactor Projects - l/It, NRR S. Bajwa, PDND, DRPM, NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., ORA, RES P. McKee, Director, Project Directorate I-4, NRR A. Wang, Licensing Project Manager, PD l 3, NRR D. Screnci, Public Affairs Officer, RI NRC Resident inspector M. Campion, ORA S. Stewart, ORA i
D. Chawaga, ORA
\\C, k C. Gordon, ORA DOCUMENT NAME: G:\\ BRANCH 8\\ MEETINGS \\HADDAM.AIT To receive a copy of this document, indicate in the box: 'C' = Copy without attachment' enclosure "E" = Copy with attachment / enclosure "N" = No copy I
0FFICE RI/DRP l
/
l
/
l
/
l NAME JFROGGE/ S( %
J%,ff b/ml l
DATE 09/ )-/96
/
Fy f l
OFFICIAL RECORD COPY l
I