OPERATING DATA REPORT DOCKET NO. 50-336 DATE 12/13/84 COMPLETED BY J. Gibson TELEPHONE (203)447-1791 EXT. 4431 o OPERATING STATUS
- 1. Unit Name: Millstone Unit 2 Notes Items 21 and 22
- 2. Reporting Period: November 1984 cumulative are weighted
- 3. Licensed Thermal Power (MWt): 2700 Ave. Unit operated at
- 4. Nameplate Rating (Gross MWe): 909 2560 MW Thermal prior
- 5. Design Electrical Rating (Net MWe): 870 to its uprating i.c ine
- 6. Maximum Dependable Capacity (Gross MWe): 866.25 current 2700 MW Thermal
- 7. Maximum Dependable Capacity (Net MWe): 833.25 Power Level. *
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
The Conversion of the Main Steam Control Valves from partial ARC to full ARC, Condenser Tube Fouling, Feedwater Flow Venturi Fouling, and High Steam Generator Blowdown Rates.
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A a
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 8040 78312
- 12. Number Of Hours Reactor Was Critical 655.9 7852.8 56218.1
- 13. Reactor Reserve Shutdown Hours 0 0 2205.5
- 14. Hours Generator On-Line 583.3 7477.4 53659.6
- 15. Unit Reserve Shutdown Hours 0 0 468.2
- 16. Gross Thermal Energy Generated (MWH) 1524599.3 19437265 135748934
- 17. Gross Elec. Energy Generated (MWH) 492400 6241101 44047479
- 18. Net Electrical Energy Generated (MWH) 470885 5996396 42212097
- 19. Unit Service Factor 81.0 93.0 68.5
- 20. Unit Availability Factor 81.0 93.0 69.1
- 21. Unit Capacity Factor (Using MDC Net) 78.5 86.7 64.1
- 22. Unit Capacity Factor (Using DER Net) 75.2 85.7 _
63.2
- 23. Unit Forced Outage Rate 16 4 17.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Millstone Unit 2 is scheduled to shutdown in February 1985 for a 16 week refueling and Maintenance Outage.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation),: Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COPHERCIAL OPERATION N/A N/A
- Item 21 Yr-To-Date is weighted Ave, due to a change in 10C effective November 1, 1984. oIIy[
$83$NON I %g a ,
= j
~
x L' . -
' AVERAGE DAILY UNIT P0'WER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 L
DATE 12/13/84-COMPLETED BY J. Gibson TELEPHONE (203)447-1791 Ext. 4431 MONTH November 1984 DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 834- 17 -0 2' 834 18 0 3 837 19 ?40
- 4. 838 20 790' 5 836' -21 850 6 836 22 851 7 837 23 852 8 837 24 852 9 837 25 852 10 835' 26 854 11 835 27 855 12 835 28 664 13 798 29 0 14 837 30 0
-15 332~ 31 ---
i 16 0
' INSTRUCTIONS-
.. On this. format,^11st the average daily . unit power level in MWe-Net for each day in the reporting month. Compute to the. nearest whole megawatt.
,e- ,--c ,x---, ,,- g - -em=, - -
e
. DOCKET NO. 50-336 .
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 2 DATE 12/13/84 COMPLETED BY J. Gibson REPORT MONTH November 1984 TELEPHONE (203)447-1791 EXT. 4431 l
No. Date Type Duration Reason 2 Method of Licensee Systeg Compogent Cause & Corrective (Hours) Shutting 3 Event Code Code Action to Down Reactor Report # Prevent Recurrence 12 G41115 F 84.4 A 3 84-11 CD VALV0P Unit Tripped from
'100% power due to Closure of the #1 Steam Generator
The cause of the Valve Closure was a Failed Air Cylinder on the-Valve Operator.
Air Cylinders on both Main Steam Isolation Valve Air Cylinders were replaced. See LER.
1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 G-Operational Error (Explain) (Duration = 0) Exihibit 1 - Same Source H-Other (Explain) 9-Other (Explain) i
+
- A
'1
.u i
-DOCKET NO. 50-336 *
. UNIT SHUTDOWNS AND POWER REDUCTIONS- UNIT NAME Millstone 2 DATE 12/13/84 COMPLETED BY J. Gibson REPORT MONTH November 1984 TELEPHONE (203)447-1791 EXT. 4431 l 2 Cause & Corrective No. 'Date- Type Duration Reason Method of Licensee Systeg Compogent (Hours) Shutting 3 Event Code Code ' Action to /
Down Reactor Report # Prevent Recurrence:
i 13- 841128 'F 52.3' A 2 84-12 CH HTEXCH Unit was in process" i of shutting down from 100% Power due to excessive l tube leakage in the l' '
5A Feedwater Heater.
At approx. 70% power The plant was manually tripped due to High SA Htr.
Level.- Plugged Leaking Tubes.
1 -2 3 4 Exhibit G - Iastructions F: Forced- Reason: Method:
S: 1 Scheduled A-Equipment Failure (Explain)- 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month
-F-Administrative 5-Power Reduction 5 G-Operational Error (Explain) (Duration = 0) Exibibit 1 - Same Source H-Other (Explain) 9-Other (Explain). .
E_ -
m
Docket No. 50-336
- Date 12/13/84 Unit Name Millstone 2 Completed By J. Gibson ~
Telephone'(203)447-1791 EXT. 4431 CORRECTIVE MAINTENANCE SUMARY.FOR SAFETY RELATED EQUIPMENT REPORT MONTH November 1984
. DATE SYSTEM COMPONENT MAINTENANCE. ACTION
.11/5/84 CVCS 'C' Charging Pump Repacked Pump 11/8/84 CVCS 'A' Charging Pump Repacked Pump 11/29/84 CVCS 'B' Charging Pump Breaker Replaced Main Contactor 11/16/84' Main Steam .2-MS-64A0 Replaced Operator Air Cylinder 11/5/84~ Reactor. Protection RPS Channel C Replaced B1-Stable Power Supply System 4
Docket No. 50-336 Date: 12/13/84 Completed By: J. Gibson Telephone: (203)447-1791 EXT. 4431 REFUELING INFORMATION REQUEST
- 1. Name of facility: Millstone 2
- 2. Scheduled date for next refueling shutdown: Next refueling is_in February 1985.
- 3. Schedule date for restart following refueling: June 1985
- 4. Will refueling or resumptior, of operation thereafter require a technical specification change or other license amendment?
Currently under evaluation due to the impact of failed fuel.
- 5. Scheduled date(s) for submitting licensing action and supporting information:
A Tech. Spec. change request has been submitted for the Outage Equipment Hatch.
Additional Requests will follow.
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier,.unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Discharge of failed fuel will impact reload analysis.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: J17 (b) 376
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in~ licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Currently 667 Plans are being formulated to rerack the spent fuel pool
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, Full core off load capacity is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.
$ \
l s o NORTHEAST UTILETIES G*a' "'"" S*'*" Strat Bar"a coan'aat is cowcw w = == c ""
P.O. BOX 270 g 22 Z".$'["~
e,os, utwes m .c cow.,
m.ost unm awaovco HARTFORD. CONNECTICUT 06141-0270 (203) 666-6911 l
December 14, 1984 MP-6494 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50-336
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 82-11 in accordance with Appendix A Technical Specifications, Section 6.9.1.3. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY L/
E. J. Mroczka Station Superintendent Millstone Nuclear Power Station EJM/RB:ejz cc: Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. D.0)
U. S. Nuclear Regulatory Commission, c/o Document Managenient Branch, Washington, D.C. 20555 lli l et
<