MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements 1999-09-22
[Table view] Category:TEST REPORT
MONTHYEARML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20137T3441997-04-0909 April 1997 Cycle 7 Startup Physics Test Rept ML20117B7151996-08-15015 August 1996 Cycle 12 Startup Physics Test Rept ML20087G8811995-08-0808 August 1995 Cycle 6 Startup Physics Test Rept ML20084U7261995-06-0606 June 1995 Cycle 11 Startup Physics Test Rept ML20064H3711994-03-0909 March 1994 Cycle 5 Startup Physics Test Rept ML20063H7491994-01-24024 January 1994 Reactor Containment Bldg Integrated Leakage Rate Test Rept for 1993 for Beaver Valley Power Station Unit 2 ML20056F7501993-08-10010 August 1993 Reactor Containment Bldg Ilrt,Beaver Valley Power Station, Unit 1,May 1993 ML20086A5701991-11-0505 November 1991 Cycle 9 Startup Physics Test Rept ML20067E4401991-01-17017 January 1991 Startup Physics Test Rept, Re Verifying Adequacy of Cycle 3 Reload Core Design.Each Test Performed Indicated Measured Parameters Which Were within Specified Acceptance Criteria ML20029A1361990-11-30030 November 1990 Reactor Containment Bldg Integrated Leakage Rate Test. ML20086S9581990-10-31031 October 1990 Issue 1,Rev 1,to SI Accumulator Discharge Check Valve Full Stroke Test, Test Results Rept ML20012C4671990-03-0505 March 1990 Reactor Containment Bldg Integrated Leak Rate Test. W/ 900309 Ltr ML20086S9391989-12-13013 December 1989 Issue 1,Rev 1,to SI Accumulator Discharge Check Valves Full Stroke Test, Test Results Rept ML20245H7821989-08-0404 August 1989 Startup Rept Suppl 6 ML20248A7771989-06-30030 June 1989 Cycle 2 Startup Physics Test Rept ML20246M2901989-05-0404 May 1989 Suppl 5 to Startup Rept ML20247D9051989-03-20020 March 1989 Initial Startup Test Deferral Rept for First Refueling ML20235N0891989-02-0303 February 1989 Startup Rept Suppl 4 for Beaver Valley Power Station, Unit 2 ML20206E7571988-11-10010 November 1988 Startup Rept,Suppl 3 ML20065G8671988-08-26026 August 1988 Reported Turbine Component Damage at Beaver Valley Power Station Unit 1 Re Conduct of Operational Surveillance Test (Ost) 1.23.1 ML20151T5481988-08-0202 August 1988 Startup Rept,Suppl 2 ML20154A0801988-05-0202 May 1988 Startup Rept Suppl 1 ML20246H9871988-04-30030 April 1988 Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 ML20245D4371988-03-31031 March 1988 Cycle 7 Startup Physics Test Rept ML20148F7131988-03-0404 March 1988 Reactor Containment Bldg Local Leak Rate Test ML20214F3471987-05-0808 May 1987 Reactor Containment Bldg Ilrt,Types A,B & C Preoperational Test ML20214U3341986-09-30030 September 1986 Cycle 6 Startup Physics Test Rept ML20215K6471986-08-31031 August 1986 Reactor Containment Integrated Leakage Rate Test Results Rept, Jul-Aug 1986 ML20129G8141985-06-0404 June 1985 Test Rept on Electrical Separation Verification Test for Duquesne Light Co Beaver Valley Power Station,Unit 2 ML20112C6481985-01-31031 January 1985 Cycle 5 Startup Physics Test Rept ML20112A5641984-12-31031 December 1984 Local Leak Rate Test,Type B & C ML20093J0941984-03-26026 March 1984 Revised Testing of Dissolved Oxygen Analyzers for Post-Accident Analysis Application ML20093J0911984-02-0707 February 1984 Testing of L&W 7075-3 Ph Receiver & Electrode Preamplifier & Meridian Ph Electrode for Pass Applications ML20082N9741983-09-30030 September 1983 Reactor Containment Bldg Integrated Leak Rate Test,Types B & C ML20083H4411983-09-30030 September 1983 Cycle 4 Startup Physics Test Rept ML20095F0251983-08-31031 August 1983 Experimental Evaluation of Reactor Containment Sump ML20063P8071982-10-0505 October 1982 Cycle 3 Startup Test Rept ML20063A0501982-05-31031 May 1982 Reactor Containment Integrated Leakage Rate Test Results Rept,1982 ML20138N7081981-12-24024 December 1981 Test Program to Evaluate DBA Performance of Overlaps Coating Sys (Carboline/Imperial) for Beaver Valley Unit 2 ML20004E5041981-02-28028 February 1981 Cycle 2 Startup Test Rept. ML19316A7281980-03-25025 March 1980 Test Rept for Environ Qualification Test of Penn Union & Marathon Terminal Blocks. ML19242D3661979-08-10010 August 1979 to 1978 Reactor Containment Integrated Leak Rate Test Rept.Revision Includes More Detailed Info Concerning Containment Air Lock Leak Testing & Date Correction Re Performance of Type B Leak Tests ML19246B9101979-02-26026 February 1979 Installation Test Rept for Kinemetrics Sma,S/N 170 Recording Sys W/Three Teledyne FB-103B Accelerometers,One Teledyne 36180 Trigger & Kinemetrics SMP-1,S/N 181 (Playback Unit). 1998-04-13
[Table view] |
Text
DUQUESNE LIGHT COMPANY Beaver Valley Unit No. I 1
i
{ STARTUP PHYSICS TEST REPORT 1
I l September, 1983 l
l l
i
~
l 8401040503 831223
! PDR ADOCK 05000334 P PDR l
l Beaver Valley Power Station Cycle 4 Startup Test Report INTRODUCTION:
This report describes the startup tests program applicable for the Cycle 4 reload core design verification and recalibration of the excore instrumentation for Beaver Valley Power Station, Unit 1. This testing program consisted of the following measurements:
- 1. Control rod drop time measurements.
- 2. Critical boron concentration measurements.
- 3. Control rod bank worth measurements.
- 4. Temperature coefficient measurements.
- 5. Reactivity computer checks.
- 6. Excore calibration.
- 7. Startup power distribution measurements using the incore flux mapping system.
The results of these startup tests are summarized in this report and comparisons are made to predicted design values and applicable BVPS technical specification requirements.
TEST
SUMMARY
Prior to initial criticality and the performance of the low power physics testing, the drop times of each full length Rod Cluster Control Assembly (RCCA) were measured at both cold no RCS flow and hot full RCS flow plant conditions. The drop times of all 48 rods were well within the BVPS Technical Specification requirement ofs 2.2 seconds from beginning of rod drop to dash pot entry, with the slowest time being 1.40 seconds for rod B-6 at hot full RCS flow.
The initial criticality for Cycle 4 reload core was achieved at 2217 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.435685e-4 months <br /> on September 22, 1983. Following the completion of initial criticality the testing decade for low power physics was established and the reactivity computer was checked using the reactor. Low power physics testing (LPPT) was then initiated.
BORON ENDPOINT:
The all rods out (ARO) critical boron concentration was measured to be 1469.5 ppm. This value was well within the design prediction of 1466 50 ppm.
c.
I TEMPERATURE COEFFICIENTS:
The isothermal temperature coefficient (ITC) and moderator temperature .
coefficient (NTC) were measured at the all rods out configuration. The average measured ITC was determined to be -2.15 pcm/*F which is within the acceptance criteria of -2.2 3 pcm/*F. Subtracting the predicted design value of the doppler coefficient (-2.1 pcm/*F) from the measured ITC, the MTC was, calculated to be -0.05 pcm/*F. This value for the moderator temperature coefficient meets the requirements of BVPS Technical Specification 3.1.1.4, which requires a negative MTC to ensure that the assumptions used in the accident and transient analyses are valid.
LOW POWER FULL CORE FLUX MAPS:
A full core flux map was taken at the ARO configuration to determine the initial flux distribution in the core during LPPT. Table I lists the values for quadrant power tilt, nuclear enthalpy hot channel factor (F{H)*
and maximum deviations from predicted relative assembly powers.
Due to the quadrant power tilt, both relativeassemblypowerandF{H exceeded their acceptance criteria for the test in the region of the core that the power tilt occurred. Based on Westinghouse's position statement regarding core tilts measured at zero power and the fact that all measured peaking factors were within their applicable technical specification limits, an additional full core flux map was performed at 47% power to reverify the quadrant power tilt and core peaking factors.
AT POWER FULL CORE FLUX MAPS:
Full core flux maps were performed at 47%, 72% and 99% power to check core design predictions. The results from these maps were all well within the acceptance criteria and applicable Technical Specifications as illustrated in Table I.
RCC BANK WORTHS BY ROD SWAP:
The worth of the reference bank for rod swap, CBB, was measured using the boron dilution method. Following the insertion of CBB, the worths of the remaining control and shutdown banks were obtained relative to CBB. The measured worth, predicted value, and the percent difference for each RCC bank and total RCC worth are listed in Table II. All the measured values were within the acceptance criteria for the test.
REACTIVITY COMPUTER The reactivity computer was checked prior to LPPT, every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during testing, and at the end of LPPT using the exponential generator. In addition, the reactivity computer was checked against the reactor following initial criticality. In all cases the computer error was within the 4%
acceptance criteria.
INCORE - EXCORE AXIAL OFFSET CALIBRATION:
At 73% power, a full core flux map and five quarter-core flux maps were I taken to calibrate the excore detectors in accordance with BVT 1.3-2.2.3.
The maps were taken at various axial offsets (from +2.021% to -11.29%) to provide a wide span of data points for the calibration. The full core flux l
map taken at 99% power verified the calibration performed at 73% power and also served as a further check on core peaking factors.
TABLE I FULL CORE FLUX MAPS 50% Power 100% Power Acceptance ARO-HZP CBD = 177 steps ARO Criteria Quadrant Tilt 1.0309 1.01 1.0051 < 1.02 (Tech. Spec. < 1.02 above 50% power)
Maximum 14.873% 5.917% 3.705% 10% of Predicted Deviation from for Relative Powers Predicted >.9 Relative Assembly Powers 15.188% 5.921% 3.705% i 15% of Predicted for Relative Powers s.9 i
F$H 1.695 1.49 1.4273 1.43 i .14 ARO-HZP Tech. Spec.:
<2.015 for HZP
<1.795 for 47%
<1.555 for 99%
TABLE II RCC BANK WORTHS RCC Measured Predicted Error Acceptance Bank Value (pcm) Value (pcm) (%) Criteria CBB* 1432.70 1404 2.04 10%
CBD 1065.68 1125 -5.27 15%
CBC 820.71 854 -3.90 i 15%
CBA 602.21 561 7.35 15%
SBB 915.03 1017 -10.03 15%
SBA 1173.08 1123 4.46 i 15%
Total Worth 6009.41 6084 -1.23 10%