e t

PART II - Local Leakage Rate Tests A. Type B Test Results Local leakage rate testing for the containment electrical penetrations has been performed twice since the last type A test report, once in the late spring of 1977 and again in the fall of 1978. The results were acceptable for both series of tests.

The local leakage rate testing for the containment electrical penetrations checks the leakage through the penetration 0-ring seals on the bolt-on flanges and the leakage from the penetration catisters. The total leakage from the electrical penetrations is the sum of the leakage from the 0-ring seals and the canister leakages. A summary sheet is included for each eerf es of electrical penetration tests.

Other type B local leakage rate tests measure the leakage through the personnel airlock, the equipment hatch and the fuel transfer tube.

These results are noted on the test results leakage su==ary after each section of electrical penetration leakages.

It should be noted that there are two leakage tests (OSr 1.47.1 and OST 1.47.83) performed on the airlock. OST 1.47.1, which is a type C leaksgo test, pressurizes the door seals and uses a bubble flow detector to check for leaks.

If the seals are leaking, this device will detect this by bubbling.

This test is performed af ter each opening, or if the airlock is being used for multiple entries, then at least once every,three days.

Since the last type A report, there

_ve been approximately six occurrences where seal problems were found.

By either lubricating and/or replacing the old seals, the leaks were stopped as subsequent rctesting proved.

In OST 1.47.83, which is a type B leakage test, the total airlock leakage rate is r easured. The results from this test can be found on the test results leakage summary, after each tabulated section of the individual electrical penetration leakages. REVISION 1 oG I 'h

[J ' /

700814067/

.t PART II - Local Leakage Rate Tests A.

Type B Test Results Summary l

Electrical penetration type B tests completed 6/26/ 77 0-Ring Seal Canister Total Penetration

" netration Leakage

' Leakage Leakage Number (SCF/D)

(SCF/D)

(SCF/D) 1-B 0.010 0

0.010 1-D q.009 0

0.009 1-F Blank Blank 0.000 2-B 0.007 0

0.007 2-D 0.004 0

0.004 2-F 0.005 0

0.005 3-A 0.004 0

0.004 3-B 0.006 0

0.006 f

3-C 0.008 0

0.008 3-D 0.008 0

0.008 3-E 0.011 0

0.011 3-F 0.106 0

0.106 3-G Blank Blank 0.000

'> - A 0.004 0

0.004 4-B 0.003 0.043 0.046 4-C 0.008 0

0.008 4-D 0.004 0

0.004 4-E 0.004.

0 0.004 4-F 0.006 0

0.006.

4-G 0.005 0

0.005

(

Totals 0.212 0.043 0.255 Page 1

[. d /

})h

~REVIdION 1

_43_

I PART II - Local Leakage Rate Tests A.

Type B Test Results Summary (continued)

Electrical penetration type B tests completed 6/26/77 0-Ring Seal Canister Total Penetration 0

Penetration Leakage Leakage Leaka ge Number (SCF/D)

(SCF/D)

(SCF/D) 5-A 0.005 0.043 0.048 5-B 0.006 0

0.006 5-C 0.007 0

0.007 5-D 0.005 0

0.005 5-E 0.007 0

0.007 5-F 0.007 0

0.007 5-G 0.006 0.130 0.136 6-A 0.003 0.

0.003 6-B Blank Blank O.000 6-C O.003 0

0.003 6-D 0.003 0

0.003 Cr 6-E 0.004 0

0.004 6-F 0.004 0

0.004 6-G 0.005 0

0.095 7-A-Blank Blank 0.000 7-B 0.003 0

0.003 7-C 0.003 0

0.003 7-D 0.005 0

0.005 0

0.004 7-E

0. 00 '>

7-F 0.004 0

0.004 7-G Blank Blank 0.000 f

Totals 0.084 0.173 0.257 Page 2 REVISION 1 g

Part II - Local Leakage Rate Tests A.

Type B Test Results Su==ary Electrical penetra tion type B tests completed 6/26/ 77 l

0-Ring Seal Canister Total Penetration 0

Penetration Leakage Leaka ge Leakage Number (SCF/D)

(SCF/7)

(SCF/D) 8-A 0.004 0

0.004 8-B 0.005 0

0.005 8-C 0.006 0

0.006 8-D 0.011 0

' O.011 8-E 0.004 0

0.004 8-F Blank Blank 0.000 8-G 0.014 0

0.014 9-A 0.005 0

0.005 9-B 0.005 0

0.005 9-C 0.003 0

0.003 9-D 0.010 0

0.010 g

'w) 9-E 0.005 0

0.005 9-F 0.017 0

0.017 9-G 0.009 0

0.009 10 - A 0.006 0

0.006 10 - B 0.003 0.217 0.220 10 - C 0.002 0

0.002

. l'0-D 0.004 0

0.004 10 - E 0.002 0.043 0.045 10 - F 0.003 0

0.003 10 - C 0.045 0

0.045 0

Total 0.163 0.260 0.423 Page 3 REVISION 1 I l b-b,, ;/

i

Part II - Local Leakage Rate Tests A.

' ge B Test Results Su==ary l

,_&jectrical oenetration tvne B tests completed 6/26/77 O

0-Ring Seal Canister Total Penetration

(,)

Penetration Leakage Leakage Leakage Number (SCF/D)

(SCF/D)

(SCF/D) 11 - A 0.006 0

0.006 11 - B 0.006 0

0.006 11 - C Blank Blank O.000 11 - D 0.006 0

0.006 11 - E O.024 0

0.024 11 - F 0.014 0

0.014 11 - G 0.006 0

0.006 12 - A 0.008 0

0.008 12 - B 0.008 0

0.008 12 - C 0.009 0

0.009 12 - D 0.005 0

0.005 0

12 - E 0.007 0

0.007 12 - F 0.008 0

0.008 12 - G 0.003 0

0.003 13 - A Blank Blank 0.000 13 - B Blank Blank 0.000 13 - C 0.008 0

0.008 13 - D Blank Blank 0.000 13 - E 0.005 0

0.005 13 - F 0.006 0

0.006 13 - G 0.008 0

0.008 Total 0.137 0.000 0.137 Page 4 REVISION 1 ! 'I 6; ! j

Part II - Local Leakage Fate Tests A.

Type B Test Results Su= mary Electrical penetration type B tests completed 6/26/77 0-Ring Seal Canister Total Penetration

/",1 Penetration Leakage Leakage Leakage

(

Number (SCF/D)

(SCF/D)

(SCF/D) 14 - A 0.004 0.043 0.047 14 - B 0.004 0

0.004 14 - C 0.003 0

0.003 14 - D 0.004 0

0.004

~

14 - E 0.008 0

0.008 14 - F 0.007 0

0.007 14 - G 0.006 0

0.006 15 - A 0.004 0

0.004 15 - B 0.004 0

0.004 15 - C 0.003 0

0.003 15 - D 0.006 0

0.006 0

15 - E 0.004 0

0.004 15 - F 0.007 0.130 0.137 15 - G 0.004 0

0.504 16 - A O.003 0

0.003 16 - B 0.006 0

0.006 16 - C 0.004 0

0.004 16 - D 0.002 0

0.002 16 - E 0.003 0

0.003 16 - F 0.004 0

0.004 16 - G Blank Blank 0.000

(:)

T ta1 e.eee e.173 e.ze>

Page 5 [j4')

' b REVISION 1 t.

Part II - Local Leakage Rate Tests A.

Type B Test Results Summary Electrical penetration type B tests completed 6/26/77 0-Ring Seal Canister Total Penetration 0

Penetration Leakage Leakage Leakage Number (SCF/D)

(SCF/D)

(SCF/D) 17.- B 0.003 0

0.003 17 - D Blank Blank 0.000 17 - F Blank Blank 0.000 18 - B 0.003 0

0.003 18 - D 0.004 0

0.004 18 - F Blank Blank 0.000 111 0.006 0

0.006 Total 0.016 0.000 0.016 Page 6 0

Total, page 1 0.255 SCF/D Total, page 2 0.257 SCF/D Total, page 3 0.423 SCF/D Total, page 4 0.137 SCF/D Total, page 5 0.263 SCF/D Total, page 6 0.016 SCF/D

-TOTAL 1.351 SCF/,D (1.351 SCF/D)

} = 0.000021% Leakage / day 8

F 0

REVISIcy 1 ') 1 m

,. 9;

._ u,

PART II - Local Leakage Rate Tests A.

Type B Test Results Type B Tests Electrical penetrations (6/26/77) 1.351 SCF/D

  • Personnel airlock (3/14/77) 0.000 SCF/D l

Equipment hatch (3/7/76) 0.000 SCF/D Fuel transfer tube (3/12/76) 11.800 SCF/D Type C Tests (8/7/75) 893.510 SCF/D Total, Local Leakage Rate Tests 906.661 SCF/D (906.661 SCF/D)

(0.1% leakage)

(6489.8 SCF) 0.0140 % leakage / day o

  • Additional results of personnel airlock tests performed prior to 3/14/77:

Personnel airlock (2/15/76) 101.9 SCF/D Personnel airlock (3/13/76) 0.0 SCF/D Personnel airlock (9/11/76) 5.33 SCF/D Personnel airlock (10/24/76) 8.46 SCF/D

({} REVISION 1 w=

o Cl PART II - Local Leakage Rate Tests A.

Type B Test Results Summary Type B Test Results Electrical penetrations (10/30/78)

~8.251 SCF/D

  • Personnel airlock (10/30/78) 0.000 SCF/D l

Equipment hatch (11/15/78) 1.617 SCF/D Fuel transfer tube (11/1/78) 8.900 SCF/D Type C Tests (11/18/78) 1693.358 SCF/D Total, Local Leakage Rate Tests 1712.126 SCF/D

("]

(1712.126 SCF/D)

(0.1% leakage) =

0.02o4% leakage / day

(,g (6489.80 SCF)

  • Additional results of personnel airlock tests performed prior to 10/30/78:

Personnal airlock (10/22/77) 71.76 SCF/D Personnel airlock (4/ 5/78) 2.52 SCF/D 0

  • 7

)

! REVISION 1

u O

Part II - Local Leakage Rate Tests B.

Type C Test Results (continued)

Type B Tests Electrical penetration (8/2/75) 0.000 SCF/D Personnel airlock (10/24/76) 8.460 SCF/D Equipment hatch (3/7/76) 0.000 SCF/D Fuel transfer tube (3/12/76) 11.800 SCF/D Type C Tests (as of 2/28/77) 2608.354 SCF/D Tctal, Local Leakage Rate Tests 2628.614 SCF/D (2628.614 SCF/D) (0.17. leakage) 0.0405 % leakage /dav

=

(6489.80 SCF)

G

([} }

. REVISION 1

Y

r:

Part II - Local Leakage Rate Tests O

B.

Type C Test Results (continued)

Type B Test Results Electrical penetrations (10/30/78) 8.25' SCF/D Personnel Airlock (10/30/78) 0.000 SCF/D Equipment hatch (11/15/78) 1.617 SCF/D Fuel transfer tube (11/1/78) 8.900 SCF/D Type C Tests (11/18/78) 1722.186 SCF/F Total, Local Leakage Rate Tests 1740.954 SCF/D (1740.954 SCF/D) (0.1% leakage) 0.0268 % leakane/ day

=

(6489.80 SCF)

O 0 REV!SION 1 bk

.