Forwards Cycle 4 Startup Physics Test Rept. Rept Provides Technical Summary of Plant Startup Testing Program. Comparisons Made to Predicted Design Values & Applicable Tech Spec Requirements
ML20083H437
Person / Time
Site: Beaver Valley
Issue date: 12/23/1983
From: Lacey W
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20083H439 List:
References
ND1SS1:1046, NUDOCS 8401040501
Download: ML20083H437 (2)


Text

-____

e e

$VL

'Al5 Telephone (412) 393-6000 Nuclear DMalon P.O. Box 4 Shippingport PA 15077-0004 December 23, 1983 ND1SS1:1046 United States Nuclear Regulatory Commission Director of Nuclear Reactor Regulation ATTN:

Mr. Steven A. Varga Operating Reactors Branch No. 1 Division of Licensing Washington, D.C.

20555

Reference:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Startup Physics Test Report Gentlemen:

Enclosed is the 1983 Beaver Valley Startup Test Report, submitted in accordance with Technical Specification 6.9.1.3.

The report provides a technical summary of the BVFS, Unit No.1 Startup Testing Program. com-parisons are made to oredicted design values and applicable Beaver Valley Power Station Technical Specification requirements.

Very truly yours, A4/

Wm. S. Lacey Station Superi ndent md Attachment cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555

,[

6

[ / //g3g Director, Safety Evaluation & Control b

Virginia Electric & Power Sompany ff P. O. Box 26666

/

One James River Plaza Richmond, VA 23261 8401040501 831223 DRADOCK05000g3

I i

DUQUESNE LIGHT COMPANY Nuclear Operations Department Testing and Plant Performance December 7, 1983 NDITPP:0034 Beaver Valley Power Station Unit 1 Cycle 4 Startup Test Report Mr. W. S. Lacey:

Attar.hed is the BVPS Unit 1, Cycle 4 Startup Test Report. The results summarized in this report were obtained from several BVTs performed as part of the startup physics testing program:

BVT 1.4 - 2.2.1, Initial Approach to Criticality After Refueling BVT 1.4 - 2.2.2, Core Design Check Test BVT 1.3 - 2.2.3, Nuclear Power Range Calibration BVT 1.1 - 1.1.1, Control Rod Drop Time Measurement BVT 1.3 - 8.3.1, Incore Moveable Detector Flux Mapping This report is in response to Technical Specification 6.9.1.3, which requires that a startup report be submitted to the NRC within 90 days following the completion of the startup test program. The due date for this reporting requirement is December 28, 1983.

.?

G. F.

sic ARB/jmc Attachments cc T. G. Zyra K. D. Grada A. R. Burger Central File (2) 1

-