Forwards Cycle 4 Startup Physics Test Rept. Rept Provides Technical Summary of Plant Startup Testing Program. Comparisons Made to Predicted Design Values & Applicable Tech Spec Requirements
ML20083H437
Person / Time
Site: Beaver Valley
Issue date: 12/23/1983
From: Lacey W
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20083H439 List:
References
ND1SS1:1046, NUDOCS 8401040501
Download: ML20083H437 (2)


Text

-____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e e

$VL

'Al5 Telephone (412) 393-6000 Nuclear DMalon P.O. Box 4 Shippingport PA 15077-0004 December 23, 1983 ND1SS1:1046 United States Nuclear Regulatory Commission Director of Nuclear Reactor Regulation ATTN: Mr. Steven A. Varga Operating Reactors Branch No. 1 Division of Licensing Washington, D.C. 20555

Reference:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Startup Physics Test Report Gentlemen:

Enclosed is the 1983 Beaver Valley Startup Test Report, submitted in accordance with Technical Specification 6.9.1.3. The report provides a technical summary of the BVFS, Unit No.1 Startup Testing Program. com-parisons are made to oredicted design values and applicable Beaver Valley Power Station Technical Specification requirements.

Very truly yours, A4/

Wm. S. Lacey Station Superi ndent md Attachment cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Director, Safety Evaluation & Control Virginia Electric & Power Sompany P. O. Box 26666

[/ ff

/

//g3g b

,[ 6 One James River Plaza Richmond, VA 23261 8401040501 831223 DRADOCK05000g3

I i

DUQUESNE LIGHT COMPANY Nuclear Operations Department Testing and Plant Performance December 7, 1983 NDITPP:0034 Beaver Valley Power Station Unit 1 Cycle 4 Startup Test Report Mr. W. S. Lacey:

Attar.hed is the BVPS Unit 1, Cycle 4 Startup Test Report. The results summarized in this report were obtained from several BVTs performed as part of the startup physics testing program:

BVT 1.4 - 2.2.1, Initial Approach to Criticality After Refueling BVT 1.4 - 2.2.2, Core Design Check Test BVT 1.3 - 2.2.3, Nuclear Power Range Calibration BVT 1.1 - 1.1.1, Control Rod Drop Time Measurement BVT 1.3 - 8.3.1, Incore Moveable Detector Flux Mapping This report is in response to Technical Specification 6.9.1.3, which requires that a startup report be submitted to the NRC within 90 days following the completion of the startup test program. The due date for this reporting requirement is December 28, 1983.

.? .

G. F. sic ARB/jmc Attachments cc T. G. Zyra K. D. Grada A. R. Burger Central File (2) 1 --_ -